Loading...
HomeMy WebLinkAboutTRO4103430.38lur) CD z 0 z LL, Of cn c3 n, CL M. 14 s� e+ - 5 I SR 167 PLAN 0 20 40 80 120 SCALE IN FEET GENERAL CONSTRUCTION CHANNELIZATION NOTES MULTIPLE STORE FRONTS — MWAN FOR GENERAL CONSTRUCTION CHANNELIZATION NOTES, SEE SHEET 37. CONSTRUCTION CHANNELIZATION LEGEND 21 -� BUFFER U USA MINI -MART MAXIMUM EXTENTS OF WORK ZONE. ACTUAL EXTENTS ON FIELD -3IDE SHALL VARY TO MINIMIZE IMPACT TO ADJACENT BUSINESSES (TYP). i A s 0 � TRAFFIC SAFETY DRUMS WITH LIGHT 1' BUFFER \�\ MAXIMUM EXTENTS OF WORK ZONE 11.5' 11' 11' 11' 11' 11' SINDURING CONSTRUCTION WORK ZONE SOUOUND SOU NOUND SOU NEUND LERN NORTHBOUND NORTHBOUND SIGN, DEEAILSHET 38LANAALANEALANE - — — — — — - CONSTRUCTION LIMITS 12' I�-- � DIRECTION OF TRAVEL TRAFFIC SAFETY ARIAL NARROW FONT DRUMS WITH LIGHT SECTION A -A BUSINESS NAME BUSINESS NAME 2' BUFFER BUSINESS NAME ,' BUFFER-� 1 BUSINESS NAME N � „� „' VARIES �? to WORK ZONE SOUTHBOUND SOUTHBOUND� PAINTED NORTHBOUND NORTHBOUND LANE _ LANE MEDIAN LANE LANE BUSINESS NAME OPEN DURING [--a— TRAFFIC SAFETY BUSINESS ACCESS SIGN NOTES: DRUA�S WITH LIGHT SECTION B-B 1' BUSINESS OPEN DURING CONSTRUCTION SIGNS SHALL BE CUSTOM MADE TO LIST EACH BUSINESS THAT IS ACCESSED BY THE DRIVEWAY CONSTRUCTION WHERE THE SIGN IS PLACED. THE SIGN HEIGHT SHALL VARY (2' MIN) TO ACCOMMODATE ALL BUSINESS NAMES. 4.5' 2. CONTRACTOR SHALL COORDINATE THE BUSINESS NAMES WITH ENGINEER PRIOR TO CUSTOM SIGN FABRICATION. THE NUMBER OF BUSINESS ACCESS SIGN CHARACTERS AND SPECIFIC LETTERING SHALL VARY FOR EACH SIGN. NTS 11-14-11 �4� GIA Co 5 WA j� y� 10 _ �o 20320 w� ,v -ISTfR�� L E�G� SURVEYED: KPG DRAWN BY: JLF/KAT DESIGN BY: JLF CHECK BY: JG PROJ MGR: JF FILE: 0655DCONST01 A.dw g NUMBER REVISION DESCRIPTION BY Al DATE 1P4Q 753 9th Avenue N 2502 Jefferson Avenue Seattle, WA 98109 Tacoma, WA 98402 (206) 286-1640 (253) 627.0720 www.kpg.com CITY OF RENTON BID Public Works Department DOCUMENTS APPROVED FOR CONSTRUCTION BY: DATE: TEMPORARY CHANNELIZATION NOTES C1 WORKZONE BARRIER, SEE CONSTRUCTION CHANNELIZATION LEGEND, THIS SHEET 0 PAINTED DOUBLE YELLOW CENTER LINE �3 PAINTED LANE LINE PAINTED EDGE LINE PAINTED WIDE LINE �6 PAINTED MEDIAN LINE PAINTED TYPE 2L ARROW ® PAINTED TWO-WAY LEFT TURN LINE 10 PAINTED DOTTED EXTENSION LINE. 11 PAINTED STOP LINE. 12 PAINTED TYPE 2R ARROW 13 EXISTING CROSSWALK STRIPING TO REMAIN 14 MAINTAIN ADA COMPLIANT PEDESTRIAN ACCESS 15 FOR SIGNAL INSTALLATION, MODIFY RIGHT TURN LANE CONSTRUCTION CHANNELIZATION AND PROVIDE TRAFFIC SAFETY DRUMS WITH LIGHT TO ACCOMMODATE SIGNAL CONSTRUCTION AND AS NECESSARY TO PROTECT NEW SIGNAL EQUIPMENT ONCE CONSTRUCTED. 16 REMOVE EXISTING PAINTED CROSSWALK STRIPING 17 PAINTED TYPE 1 ARROW 18 TEMPORARY CROSSWALK STRIPING PAINTED TYPE 3R ARROW RAINIER AVENUE S (SR 167) DRAWING NO. ✓ S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 I AID NO.-CM0187(048) CONSTRUCTION CHANNELIZATION PIL-AN — STAGE_ 1 DATE: NOV 2011 STA 8+98 TO STA 18+00 SHEET NO. 38 OF 304