Loading...
HomeMy WebLinkAboutTRO4103430.3900 Lia S WORK ZONE WORK ZONE 2' BUFFER 1' BUFFER 11' 11' 11' 11' 11' SOUTHBOUND SOUTHBOUND LEFT TURN NORTHBOUND NORTHBOUND \ LANE LANE LANE LANE LANE -� 2' TRAFFIC SAFETY DRUMS WITH LIGHT SECTION C-C 2' BUFFER 1' BUFFER 12.5' 11' 11' 11' 11' SOUTHBOUND SOUTHBOUND TWO-WAY LEFT NORTHBOUND NORTHBOUND LANE LANE TURN LANE LANE LANE 2' TRAFFIC SAFETY DRUMS WITH LIGHT SECTION D-D BOB BRIDGE SCION PLAN 0 20 40 80 120 SCALE IN FEET GENERAL CONSTRUCTION CHANNELIZATION NOTES FOR GENERAL CONSTRUCTION CHANNELIZATION NOTES, SEE SHEET 37. CONSTRUCTION CHANNELIZATION LEGEND TRAFFIC SAFETY DRUMS WITH LIGHT MAXIMUM EXTENTS OF WORK ZONE BUSINESS OPEN DURING CONSTRUCTION SIGN, SEE DETAIL SHEET 38. CONSTRUCTION LIMITS DIRECTION OF TRAVEL ` SHOP TCRADnOADV PUAAIAICI 17ATIf1Al AIf%TCC <1 WORKZONE BARRIER, SEE CONSTRUCTION CHANNELIZATION LEGEND, THIS SHEET PAINTED DOUBLE YELLOW CENTER LINE PAINTED LANE LINE 40 PAINTED EDGE LINE 5, PAINTED WIDE LINE C% PAINTED MEDIAN LINE n PAINTED TYPE 2L ARROW 80 PAINTED TWO-WAY LEFT TURN LINE 10 PAINTED DOTTED EXTENSION LINE. \J PAINTED STOP LINE. \- PAINTED TYPE 2R ARROW 13 EXISTING CROSSWALK STRIPING TO REMAIN 14. MAINTAIN ADA COMPLIANT PEDESTRIAN ACCESS FOR SIGNAL INSTALLATION, MODIFY RIGHT TURN LANE CONSTRUCTION CHANNELIZATION AND PROVIDE TRAFFIC SAFETY DRUMS WITH LIGHT TO ACCOMMODATE SIGNAL CONSTRUCTION AND AS NECESSARY TO PROTECT NEW SIGNAL EQUIPMENT ONCE CONSTRUCTED. 1 G REMOVE EXISTING PAINTED CROSSWALK STRIPING (1 i) PAINTED TYPE 1 ARROW C) TEMPORARY CROSSWALK STRIPING PAINTED TYPE 3R ARROW T=343039 1 ADDENDUM NO 2: REVISE PARCEL 37 WORKZONE LIMITS SOD 12 16 11 -�a-�� �4�c'I�Co� 1,As��� q� SURVEYED: KPG DRAWN BY: JLF/KAT IP14Q BID ;; ,� ITY COF RENTON — RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2ND ST DRAWING NO. 39 PROJECT NO. TED403430 — o DESIGN BY: JLF CHECK BY: JG - 753 9th Avenue N 2502 Jefferson Avenue Seattle, WA98109 Tacoma; WA98402 DOCUMENTS Public Works Department CONSTRUCTION CHANNELIZATION PLAN STAGE 1 FED AID NO.-CM0167(048) 2020 � - do �' PROJ MGR: JF (206) 286-1640 (253) 627-0720 APPROVED FOR CONSTRUCTION � DATE: NOV 201, �sslw��. F� www.kpg,com BY: DATE: STA 1 #�+00 TO STA 30+50 SHEET NO. 39 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DCONST01A.dwg