WORK ZONE
WORK ZONE
2'
BUFFER
1' BUFFER
11' 11' 11' 11' 11'
SOUTHBOUND SOUTHBOUND LEFT TURN NORTHBOUND NORTHBOUND
\ LANE LANE LANE LANE LANE
-� 2'
TRAFFIC SAFETY
DRUMS WITH LIGHT
SECTION C-C
2'
BUFFER
1' BUFFER
12.5' 11' 11' 11' 11'
SOUTHBOUND SOUTHBOUND TWO-WAY LEFT NORTHBOUND NORTHBOUND
LANE LANE TURN LANE LANE LANE
2'
TRAFFIC SAFETY
DRUMS WITH LIGHT
SECTION D-D
BOB BRIDGE SCION
PLAN
0 20 40 80 120
SCALE IN FEET
GENERAL CONSTRUCTION CHANNELIZATION NOTES
FOR GENERAL CONSTRUCTION CHANNELIZATION NOTES, SEE SHEET 37.
CONSTRUCTION CHANNELIZATION LEGEND
TRAFFIC SAFETY DRUMS WITH LIGHT
MAXIMUM EXTENTS OF WORK ZONE
BUSINESS OPEN DURING CONSTRUCTION
SIGN, SEE DETAIL SHEET 38.
CONSTRUCTION LIMITS
DIRECTION OF TRAVEL
` SHOP
TCRADnOADV PUAAIAICI 17ATIf1Al AIf%TCC
<1 WORKZONE BARRIER, SEE CONSTRUCTION CHANNELIZATION
LEGEND, THIS SHEET
PAINTED DOUBLE YELLOW CENTER LINE
PAINTED LANE LINE
40 PAINTED EDGE LINE
5, PAINTED WIDE LINE
C% PAINTED MEDIAN LINE
n PAINTED TYPE 2L ARROW
80 PAINTED TWO-WAY LEFT TURN LINE
10 PAINTED DOTTED EXTENSION LINE.
\J PAINTED STOP LINE.
\- PAINTED TYPE 2R ARROW
13 EXISTING CROSSWALK STRIPING TO REMAIN
14. MAINTAIN ADA COMPLIANT PEDESTRIAN ACCESS
FOR SIGNAL INSTALLATION, MODIFY RIGHT TURN LANE
CONSTRUCTION CHANNELIZATION AND PROVIDE TRAFFIC SAFETY
DRUMS WITH LIGHT TO ACCOMMODATE SIGNAL CONSTRUCTION AND
AS NECESSARY TO PROTECT NEW SIGNAL EQUIPMENT ONCE
CONSTRUCTED.
1 G REMOVE EXISTING PAINTED CROSSWALK STRIPING
(1 i) PAINTED TYPE 1 ARROW
C) TEMPORARY CROSSWALK STRIPING
PAINTED TYPE 3R ARROW
T=343039
1
ADDENDUM NO 2: REVISE PARCEL 37 WORKZONE LIMITS
SOD
12 16 11
-�a-��
�4�c'I�Co�
1,As��� q�
SURVEYED: KPG
DRAWN BY: JLF/KAT
IP14Q
BID
;; ,� ITY
COF RENTON
—
RAINIER AVENUE S (SR 167)
S GRADY WAY TO S 2ND ST
DRAWING NO. 39
PROJECT NO. TED403430
— o
DESIGN BY: JLF
CHECK BY: JG -
753 9th Avenue N 2502 Jefferson Avenue
Seattle, WA98109 Tacoma; WA98402 DOCUMENTS
Public Works Department
CONSTRUCTION CHANNELIZATION PLAN STAGE 1
FED AID NO.-CM0167(048)
2020
� - do �'
PROJ MGR: JF
(206) 286-1640 (253) 627-0720
APPROVED FOR CONSTRUCTION
�
DATE: NOV 201,
�sslw��. F�
www.kpg,com
BY: DATE:
STA 1 #�+00 TO STA 30+50
SHEET NO. 39 OF 304
NUMBER
REVISION DESCRIPTION
BY
APP.
DATE
FILE: 0655DCONST01A.dwg