GENERAL JOINT UTILITY TRENCH PLAN NOTES
1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
COORDINATIONLAYOUTSURVEYINGTRE
, , , NCHING, EXCAVATION, BEDDING, BACKFILL
PLAN AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
34 \ \ UGP / THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION
° TION OF
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
` FRANCHISE: UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
\ °� v�/ 0 5 10 20 40 60 GAS, COMCAST, AND CENTURYLINK.
SCALE IN FEET 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY
uGp` G JOINT UTILITY TRENCH LEGEND REQUIREMENTS AND TO PROVIDE A COMPLETE,
\ 4 \ UGP cFUNCTIONING SYSTEM. ALL
GP_� Q FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
20 9_ P
FRANCHISE UTILITIES.
-� 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
\ CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
5 C5 Q CONV
ERSION.
Q6 o °�� °° T--., �� ARBY'S - — —
D1 \ _ 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR
THE CITY OF RENTON.
o G
22 c , _ _ D3 _ c 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
- ter--�- FOR THEIR CONVERSION.
JT \ \ �\ _ a c ` Jr ` ~ JT 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
MADE BY THE FRANCHISE UTILITIES.
- - 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
D1 .JGP
\ UGP GP RIGHT-OF-WAY G PROPERTY OW
NER FROM THE RIGHT OF WAY TO -� _ _ _ � G G � EXISTING PRIVATE METERS.
G G G G G � G G G G \ \ /- D 3 G G G
uGP uGP UGP-- UGP UGP 1 i 8. CONSTRUCT JOINT UTILITY TRENCH P � I � PER THE TYPICAL TRENCH DETAILS SECTION
_ UGP l l 11 ---�.J � �I f -U `U � /�; I UGP UGP 9 S
--—-1_ �j U GF --D C-`tl C'�— UGP UGP . UGP UGP UGP UGP P AND -
_����� - uGP--- uGP UGP PROFILE SHEETS 174 192. ADJUST THE HORIZONTAL ALIGNMENT AND
� VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
»
W
_ 0 j \\ I �� °\ PEA GRAVEL AND PERFORATED PIPE ARE w COVER OVER CONDUITS AND VERTICAL 12 MINIMUM CL
EAR LEAR BETWEEN OTHER
�' I I \� �� \ / °� ANTICIPATED APPROX. 7 BELOW GROUND O UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
® _ �/ SURFACE, SEE JOINT UTILITY TRENCH
TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
+ \ PROFILE SHT 183.
CD � 21 22 - UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
cv N 41-29-15 E �`SO 23 ��� 24 �+ AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192.
Q i N
Cn
I \ \ \ Q 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
UJII `\ EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCEE NEW SYSTEM IS
COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
RAINIER AVE S \ \ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ z CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT B � I I \ � � � ANK AND EXISTING UTiLi l Y
I I �Z = STRUCTURES NO LONGER IN USE.
`c D2 I I �° - - - - - - _� \ /� 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
c I I , - - - - - - - - - - - - J - - - - - - - - - - - - - - - - - - Q SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
---------
- l--J L---------------� ° DESIGN.
uGP- 11.
_ _,
— ��� - ��: uG CONTRACTOR TO INSTALL CENTURYLINK
U�� � �� LI ,� 3 OVERSE VAULTS.
12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
T T TP °
CONSTRUCTION NOTES
q a
2
/
G X
J�Q
c� / Jae
G
Gc
— — — — — — —_---
1 ' A4"DIAMETER CONDUIT-CENTURYLINK (1
t D4 - - - _—� c \ Q\G ° s� I CONDUIT
--------J I P6
e I ` \ ° i A 499 DIAMETER CONDUIT-CENTURYLINK (4
-- ---- - - - - -- 4 \ �`� \ BOB BRIDGE SCION
T-3430107
\D � � � � \° \\ Gc CONDUIT)
° 99 _ CORRESPONDING SHEETS
12 4 DIAMETER CONDUIT PSE POWER (1
�R 5 17
CONDUIT)
17 6" DIAMETER CONDUIT-PSE GAS 1
(
`♦ \ \ ��, CONDUIT)
ID
VAULT
FRANCHISE
UTILITY ID
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT IN/FROM LEFT
CONDUIT OUT/TO RIGHT
i P6
THREE PHASE J-BOX
J10
PSE
PSE
CONTRACTOR
7p,8p,11p
1-4"
II Q6
' Fed- TA
#916
CENTURYLINK
CENTURYLINK
CONTRACTOR
4q,5q
6q,7q,8q,9q,1Oq
C5—
I
-
COMCAST
COMCAST
CONTRACTOR
-
9c, 50c
—I
-1-7"x30"
Q7
264 TA
#918
CENTURYLINK
CENTURYLINK
CONTRACTOR
9q,1Oq
12 ,13
Q26
! CONNECT TO EX. VAULT
-
CENTURYLINK
-
CONTRACTOR
6q,7q,8q,11q
-
P34
SECONDARY HANDHOLE
H8B
PSE
PSE
CONTRACTOR
-
1-4"
P49
INTERCEPT POINT
IP04
PSE
-
CONTRACTOR
1-4"
-
P50
SECONDARY HAND HOLE
H8A
PSE
PSE
CONTRACTOR
-
12p
P62
REMOVE VAULT
J11
PSE
-
CONTRACTOR
-
-
P93
REMOVE VAULT
-
PSE
REVISION DESCRIPTION
♦ ° \ ABEGIN INSTALLATION OF 4" DIAMETER
♦♦ ° G CONDUIT-PSE GAS - APPROXIMATE STA
♦ \ ° c,� 22+10, LT
♦ ° c ° 23 ABEGIN INSTALLATION OF 6" DIAMETER
♦ \ G
♦♦ T a ��� �,� _ CONDUIT-PSE GAS -APPROXIMATE STA
♦ 22+85, LT
♦♦ ° ° AEND INSTALLATION OF 6" DIAMETER
CONDUIT-PSE GAS - APPROXIMATE STA
\ 23+50, RT
y \X 2 ��� � AEND INSTALLATION OF 10" DIAMETER
CONDUIT-PSE GAS -APPROXIMATE STA
22+10, LT
i
ACOORDINATE WITH LTS GROUP AT
CATEGORY
SHEET
RIGHT OF WAY PLANS
10
EXISTING CONDITIONS
58
SITE PREPARATION & TESC PLAN
72
ALIGNMENT PLAN
84
ALIGNMENT PROFILE
96
-_--- -
DRAINAGE PLANS
--
107 -
----_---
DRAINAGE PROFILE
116,117
WATER PLAN
135
WATER PROFILE
149
JOINT U I II_I :Y TRENCH PLAN
JOINT UTILITY TRENCH PROFILES
183
PROPERTY RESTORATION PLANS
198
CHANNELIZATION & SIGNING PLAN
220
ILLUMINATION PLANS
231
IRRIGATION PLAN
285
LANDSCAPE PLAN
297
- CONTRACTOR -
-
206-619-1570 TO ADJUST TRAFFIC
--
--
BEARING MANHOLE LID TO GRADE.
SOD 12 1 11
lo,GIAco�
WAS�`YDRAWN
11-14-11 SURVEYED: KPG
BY: SOD
]PCX
CITY OF RENTON
RAINIER AVENUE R
s (s �s�)
�o
DESIGN BY: SOD
BID _l1
S GRADY WAY TO S 2ND ST
—
753 9th Avenue N 2502 Jefferson Avenue
Public Works Department
PF��T���9
CHECK BY: JLF
Seattle, WA98109 Tacoma, WA98402
(206) 286-1640 (253) 627-0720
DOCUMENTS APPROVED FOR CONSTRUCTION
JOINT UTILITY TRENCH PLAN
���
��
PROJ MGR: JF
www•kpg.com
BY APP. DATE
FILE: 0655DJUT01.dwg
BY: ! •
DATE :/�/
STA 20+00 TO STA 24+50
DRAWING NO.
167
PROJECT NO.
TED403430
FED AID NO.
-CM0167(048)
DATE:
NOV 2011
SHEET NO. 167 OF 304