HomeMy WebLinkAboutTRO4103430.4 (2)n N c� C N c11j 0 Ln Q0 0 U / Cn .y 0 / z c� U� w 0 / Q i Ln Ln Q0 CD / z 0 z W V) U w D 0 a - a GENERAL JOINT UTILITY TRENCH PLAN NOTES 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATIONLAYOUTSURVEYINGTRE , , , NCHING, EXCAVATION, BEDDING, BACKFILL PLAN AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE 34 \ \ UGP / THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION ° TION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE ` FRANCHISE: UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE \ °� v�/ 0 5 10 20 40 60 GAS, COMCAST, AND CENTURYLINK. SCALE IN FEET 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY uGp` G JOINT UTILITY TRENCH LEGEND REQUIREMENTS AND TO PROVIDE A COMPLETE, \ 4 \ UGP cFUNCTIONING SYSTEM. ALL GP_� Q FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE 20 9_ P FRANCHISE UTILITIES. -� 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL \ CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS 5 C5 Q CONV ERSION. Q6 o °�� °° T--., �� ARBY'S - — — D1 \ _ 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. o G 22 c , _ _ D3 _ c 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED - ter--�- FOR THEIR CONVERSION. JT \ \ �\ _ a c ` Jr ` ~ JT 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. - - 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE D1 .JGP \ UGP GP RIGHT-OF-WAY G PROPERTY OW NER FROM THE RIGHT OF WAY TO -� _ _ _ � G G � EXISTING PRIVATE METERS. G G G G G � G G G G \ \ /- D 3 G G G uGP uGP UGP-- UGP UGP 1 i 8. CONSTRUCT JOINT UTILITY TRENCH P � I � PER THE TYPICAL TRENCH DETAILS SECTION _ UGP l l 11 ---�.J � �I f -U `U � /�; I UGP UGP 9 S --—-1_ �j U GF --D C-`tl C'�— UGP UGP . UGP UGP UGP UGP P AND - _����� - uGP--- uGP UGP PROFILE SHEETS 174 192. ADJUST THE HORIZONTAL ALIGNMENT AND � VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM » W _ 0 j \\ I �� °\ PEA GRAVEL AND PERFORATED PIPE ARE w COVER OVER CONDUITS AND VERTICAL 12 MINIMUM CL EAR LEAR BETWEEN OTHER �' I I \� �� \ / °� ANTICIPATED APPROX. 7 BELOW GROUND O UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE ® _ �/ SURFACE, SEE JOINT UTILITY TRENCH TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE + \ PROFILE SHT 183. CD � 21 22 - UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO cv N 41-29-15 E �`SO 23 ��� 24 �+ AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192. Q i N Cn I \ \ \ Q 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL UJII `\ EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCEE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, RAINIER AVE S \ \ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ z CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT B � I I \ � � � ANK AND EXISTING UTiLi l Y I I �Z = STRUCTURES NO LONGER IN USE. `c D2 I I �° - - - - - - _� \ /� 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. c I I , - - - - - - - - - - - - J - - - - - - - - - - - - - - - - - - Q SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER --------- - l--J L---------------� ° DESIGN. uGP- 11. _ _, — ��� - ��: uG CONTRACTOR TO INSTALL CENTURYLINK U�� � �� LI ,� 3 OVERSE VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. T T TP ° CONSTRUCTION NOTES q a 2 / G X J�Q c� / Jae G Gc — — — — — — —_--- 1 ' A4"DIAMETER CONDUIT-CENTURYLINK (1 t D4 - - - _—� c \ Q\G ° s� I CONDUIT --------J I P6 e I ` \ ° i A 499 DIAMETER CONDUIT-CENTURYLINK (4 -- ---- - - - - -- 4 \ �`� \ BOB BRIDGE SCION T-3430107 \D � � � � \° \\ Gc CONDUIT) ° 99 _ CORRESPONDING SHEETS 12 4 DIAMETER CONDUIT PSE POWER (1 �R 5 17 CONDUIT) 17 6" DIAMETER CONDUIT-PSE GAS 1 ( `♦ \ \ ��, CONDUIT) ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN/FROM LEFT CONDUIT OUT/TO RIGHT i P6 THREE PHASE J-BOX J10 PSE PSE CONTRACTOR 7p,8p,11p 1-4" II Q6 ' Fed- TA #916 CENTURYLINK CENTURYLINK CONTRACTOR 4q,5q 6q,7q,8q,9q,1Oq C5— I - COMCAST COMCAST CONTRACTOR - 9c, 50c —I -1-7"x30" Q7 264 TA #918 CENTURYLINK CENTURYLINK CONTRACTOR 9q,1Oq 12 ,13 Q26 ! CONNECT TO EX. VAULT - CENTURYLINK - CONTRACTOR 6q,7q,8q,11q - P34 SECONDARY HANDHOLE H8B PSE PSE CONTRACTOR - 1-4" P49 INTERCEPT POINT IP04 PSE - CONTRACTOR 1-4" - P50 SECONDARY HAND HOLE H8A PSE PSE CONTRACTOR - 12p P62 REMOVE VAULT J11 PSE - CONTRACTOR - - P93 REMOVE VAULT - PSE REVISION DESCRIPTION ♦ ° \ ABEGIN INSTALLATION OF 4" DIAMETER ♦♦ ° G CONDUIT-PSE GAS - APPROXIMATE STA ♦ \ ° c,� 22+10, LT ♦ ° c ° 23 ABEGIN INSTALLATION OF 6" DIAMETER ♦ \ G ♦♦ T a ��� �,� _ CONDUIT-PSE GAS -APPROXIMATE STA ♦ 22+85, LT ♦♦ ° ° AEND INSTALLATION OF 6" DIAMETER CONDUIT-PSE GAS - APPROXIMATE STA \ 23+50, RT y \X 2 ��� � AEND INSTALLATION OF 10" DIAMETER CONDUIT-PSE GAS -APPROXIMATE STA 22+10, LT i ACOORDINATE WITH LTS GROUP AT CATEGORY SHEET RIGHT OF WAY PLANS 10 EXISTING CONDITIONS 58 SITE PREPARATION & TESC PLAN 72 ALIGNMENT PLAN 84 ALIGNMENT PROFILE 96 -_--- - DRAINAGE PLANS -- 107 - ----_--- DRAINAGE PROFILE 116,117 WATER PLAN 135 WATER PROFILE 149 JOINT U I II_I :Y TRENCH PLAN JOINT UTILITY TRENCH PROFILES 183 PROPERTY RESTORATION PLANS 198 CHANNELIZATION & SIGNING PLAN 220 ILLUMINATION PLANS 231 IRRIGATION PLAN 285 LANDSCAPE PLAN 297 - CONTRACTOR - - 206-619-1570 TO ADJUST TRAFFIC -- -- BEARING MANHOLE LID TO GRADE. SOD 12 1 11 lo,GIAco� WAS�`YDRAWN 11-14-11 SURVEYED: KPG BY: SOD ]PCX CITY OF RENTON RAINIER AVENUE R s (s �s�) �o DESIGN BY: SOD BID _l1 S GRADY WAY TO S 2ND ST — 753 9th Avenue N 2502 Jefferson Avenue Public Works Department PF��T���9 CHECK BY: JLF Seattle, WA98109 Tacoma, WA98402 (206) 286-1640 (253) 627-0720 DOCUMENTS APPROVED FOR CONSTRUCTION JOINT UTILITY TRENCH PLAN ��� �� PROJ MGR: JF www•kpg.com BY APP. DATE FILE: 0655DJUT01.dwg BY: ! • DATE :/�/ STA 20+00 TO STA 24+50 DRAWING NO. 167 PROJECT NO. TED403430 FED AID NO. -CM0167(048) DATE: NOV 2011 SHEET NO. 167 OF 304 z rn M Vf o � d � o w z d