Loading...
HomeMy WebLinkAboutTRO4103430.41N C, F- v) z 0 U Ln Ln 0 0 0 CIO 0 s :if w 0 i MAXIMUM EXTENTS OF WORK ZONE. ACTUAL EXTENTS ON FIELD SIDE SHALL VARY TO MINIMIZE IMPACT TO ADJACENT BUSINESSES. (TYP) i s s TACO2156L 2' BUFFER VARIES i' BUFFER PAINTED —1 MEDIAN 1 J w', Z. �j 16 -4 1111 it 1, 13 60' R 10 14 10 50' R . 3 f sa* WALKER'S RENTON SUBARU 11' 11.5f' 12' 11' 11 f' WORK ZONE THRU—RIGHT SOUTHBOUND LEFT TURN NORTHBOUND NORTHBOUND LANE LANE LANE LANE LANE TRAFFIC SAFETY DRUMS WITH LIGHT 2' BUFFER 1' BUFFER SECTION H-H 11' 11' 11' 11' 11' 11' WORK ZONE SOUTHBOUND SOUTHBOUND LEFT TURN LEFT TURN NORTHBOUND NORTHBOUND � LANE LANE LANE LANE LANE LANE WALGREENS SAFEWAY MIDAS PIZZA HUT 1� PLAN GENERAL CONSTRUCTION CHANNELIZATION NOTES FOR GENERAL CONSTRUCTION CHANNELIZATION NOTES, SEE SHEET 37. CONSTRUCTION CHANNELIZATION LEGEND TRAFFIC SAFETY DRUMS WITH LIGHT MAXIMUM EXTENTS OF WORK LONE BUSINESS OPEN DURING CONSTRUCTION SIGN, SEE DETAIL SHEET 38. CONSTRUCTION LIMITS DIRECTION OF TRAVEL 0 20 40 80 120 SCALE IN FEET 01 WORKZONE BARRIER, SEE CONSTRUCTION CHANNELIZAT'ON LEGEND, THIS SHEET PAINTED DOUBLE YELLOW CENTER LINE ® PAINTED LANE LINE 4� PAINTED EDGE LINE ® PAINTED WIDE LINE © PAINTED MEDIAN LINE ® PAINTED TYPE 2L ARROW 0 PAINTED TWO-WAY LEFT TURN LINE 10 PAINTED DOTTED EXTENSION LINE. 11 PAINTED STOP LINE. 12 PAINTED TYPE 2R ARROW �°J EXISTING CROSSWALK STRIPING TO REMAIN 14 MAINTAIN ADA COMPLIANT PEDESTRIAN ACCESS 15 FOR SIGNAL INSTALLATION, MODIFY RIGHT TURN LANE CONSTRUCTION CHANNELIZATION AND PROVIDE TRAFFIC SAFETY DRUMS WITH LIGHT 10 ACCL2MMvDATL_ SIGNAL. CON'STRUCTIOIN AD AS NECESSARY TO PROTECT NEW SIGNAL EQUIPMENT ONCE CONSTRUCTED. 16 REMOVE EXISTING PAINTED CROSSWALK STRIPING 17 PAINTED TYPE 1 ARROW 18 TEMPORARY CROSSWALK STRIPING 19 PAINTED TYPE 3R ARROW _ 2' ko— TRAFFIC SAFE_[Y DRUMS WITH LIGHT T 343041 SECTION F-F 0, 11-14-11 SURVEYED: KPG RAINIER AVENUE S (SR 1 67) DRAWING NO. _41 5�4WAAC�� DRAWN BY: JLF/KAT KpG CITY OF RENTON ti0 �j�171a B D ..0 S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 o DESIGN BY: JLF 7539th Avenue N 2502 Jefferson Avenue Public Works Department FED AID NO.-CM0167(048) 20320 �� CHECK BY: JG Seattle, WA98109 Tacoma, WA98402 DOCUMENTS APPROVED FOR CONSTRUCTION CONSTRUCTION CHANNELIZATION PLAN - STAGE 1 DATE: NOV2011 STflR�w PROJ MGR: JF (206)286-1640 (253)627-0720 x �`�IONaL E��l www.kpg.com BY: DATE: STA 42+50 TO STA 51 +00 6 SHEET NO. 41 OF _�0�� . i NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DCONST01A.dwg