Loading...
HomeMy WebLinkAboutTRO4103430.42 (2),r- a 0 w ry Ln Q0 / I C`Y 1 C:j 1 Lf-, Ln Q0 0 / z J,. r� w O [r NUMBER CD C-4 w w Cn CD 0 --- 0 0 5 10 20 40 60 SCALE IN FEET 50 RAINIER AVE S �I ADDENDUM NO 2: DELETE RAMP AT SE CORNER OF RAINIER AND 2ND. 1N GIACo 11-14-11 SURVEYED: KPG 5� wAsyl �yDRAWN BY: SOD 10 � o r DESIGN BY: JLF CHECK BY: NM 20320 w� PROJ MGR: JF IUNAL REVISION DESCRIPTION BY APP. DATE FILE: 0655dREST01.dwg 51 PROPERTY RESTORATION LEGEND COMMERCIAL HMA PAVEMENT AREA CEMENT CONCRETE SIDEWALK AND/OR PAVEMENT - PROPERTY LINES - - - - - - - - SAWCUT LINES RIGHT OF WAY LINES - - EASEMENT LINES - - - - - - - - APPROXIMATE CONSTRUCTION LIMITS ]p4Q " - CITY OF RENTON =� 753 9th Avenue N 2502 Jefferson Avenue BID Public Works Department Seaftle, WA 98109 Tacoma, WA 98402 DOCUMENTS (206) 286-1640 (253) 627-0720 APPRDD FOR CONSTRUCTION www,kpg,com BY: DATE: �t GENERAL CONSTRUCTION NOTES 1. CONTRACTOR SHALL MAINTAIN CONTINUOUS ACCESS TO ALL PARCELS. '� p 2. ADJUST ALL SURFACE UTILITIES TO FINAL GRADE. 3. CONTRACTOR SHALL NOTIFY BUSINESS OWNERS AT LEAST THREE DAYS PRIOR TO PERFORMING WORK WITHIN THE TEMPORARY CONSTRUCTION EASEMENT. 4. CONTRACTOR SHALL COORDINATE WITH BUSINESS OWNER AND SCHEDULE WORK WITHIN THE TEMPORARY CONSTRUCTION EASEMENT AROUND SPECIAL BUSINESS HOURS. 5. FOR REMOVAL LIMITS, CONSTRUCTION LIMITS, AND TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES, SEE SITE PREPARATION & TESC PLANS, SHEETS 69- 79. 6. FOR CONSTRUCTION PHASING, SEE CONSTRUCTION PHASING PLANS, SHEETS 37-54. 7. THESE SHEETS CONTAIN BACK OF SIDEWALK LAYOUT POINTS AND WORK TO BE COMPLETED BEHIND THE SIDEWALK. FOR TREATMENT OF ROADWAY FEATURES SEE ALIGNMENT PLANS, SHEETS 81-91. 8. FOR WATER SERVICE CONNECTIONS. SEE WATER PLANS, SHEETS 1326-141, 9. FOR STORM DRAINAGE CONNECTIONS AND ADJUSTMENTS, SEE STORM DRAINAGE PLANS. 10. FOR TREATMENT OF DRIVEWAYS, SEE DRIVEWAY PLANS AND PROFILES, SHEETS 208-q 216. 11. FOR FRANCHISE UTILITY CONNECTIONS, SEE JOINT UTILITY TRENCH PLANS, SHED 164-173. 12. FOR DECORATIVE SIDEWALK PAVEMENT TREATMENTS AND FOR LOCATION OF OTHER URBAN DESIGN FEATURES, SEE URBAN DESIGN DETAILS, SHEETS 269-281. 13. FOR ALL LOCATIONS WHERE THE BACK OF SIDEWALK IS NOT DEFINED IN THE POINT LAYOUT TABLES, THE TOP BACK OF SIDEWALK SHALL BE CONSTRUCTED AS DEFINED BY THE ALIGNMENT PROFILES (SHEETS 93-103), TYPICAL SECTIONS (SHEETS 19-23), INTERSECTION CURVE DATA TABLES (SHEETS 81-92), AND PLAN DIMENSIONS SHOWN. 14. CONTRACTOR SHALL ENSURE FINAL GRADE OF COMMERCIAL HMA MAINTAINS POSITIVE DRAINAGE TO DOWNSTREAM DRAINAGE STRUCTURES, r T=3430 4 CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 17 EXISTING CONDITIONS 65 SITE PREPARATION & TESC PLAN 79 ALIGNMENT PLAN ALIGNMENT PROFILE 91 - DRAINAGE PLANS - DRAINAGE PROFILE - WATER PLAN - WATER PROFILE - JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES - PROPERTY RESTORATION PLANS - CHANNELIZATION & SIGNING PLAN 227 ILLUMINATION PLANS - IRRIGATION PLAN LANDSCAPE PLAN t RAINIER AVENUE S (SR 167) S ORADY WAY rTO S 2ND ST PROPERTY RESTORATION PLANS STA 49+00 TO STA 53+25 DRAWING NO. 20 ,.ROJEC T INO. TED4034 0 FED AID NO.-CM0167(048) DATE: NOV 2011 SHEET NO. 205 OF 304