WORK ZONE
NORTHBOUND
LANE
NORTHBOUND NORTHBOUND
� LANE LANE
NORTHBOUND
LANE
2'
k-0--
TRAFFIC SAFETY
DRUMS WITH LIGHT
ab
SECTION C-C
1'
BUFFER
TRAFFIC SAFETY
DRUMS WITH LIGHT
1'
BUFFER
— 2,
i
NWI
SOUTHBOUND
LANE
SOUTHBOUND
LANE
LEFT TURN
LANE
1
� WORK ZONE
NORTHBOUND
LANE
NORTHBOUND
LANE
�
�
TRAFFIC SAFETY
DRUMS WITH LIGHT
SECTION D-D
�w--
TRAFFIC SAFETY
DRUMS WITH LIGHT
FOR GENERAL CONSTRUCTION CHANNELIZATION NOTES, SEE SHEET 37.
CONSTRUCTION CHANNELIZATION LEGEND
TRAFFIC SAFETY DRUMS WITH LIGHT
MAXIMUM EXTENTS OF WORK ZONE
BUSINESS OPEN DURING CONSTRUCTION
SIGN, SEE DETAIL SHEET 38.
CONSTRUCTION LIMITS
DIRECTION OF TRAVEL
I I wii�-
0 20 40 80 120
SCALE IN FEET
T=3430347
I CIVIF'VKHKT 1,..I1ANNCLILH 11UN NU I CO
WORKZONE BARRIER, SEE CONSTRUCTION STAGING LEGEND, THIS
SHEET
2 PAINTED DOUBLE YELLOW CENTER LINE
Q PAINTED LANE LINE
® PAINTED EDGE LINE
�5 PAINTED WIDE- LINE
0 PAINTED MEDIAN LINE
07 PAINTED TYPE 2L ARROW
PAINTED TWO-WAY LE-il I TURN kNi-
10 PAINTED DOTTED EXTENSION LINE.
11 PAINTED STOP LINE,
12 PAINTED TYPE 2R ARROW
13 EXISTING CROSSWALK STRIPING 1-0 REMAIN
14 MAINTAIN ADA COMPLIANT PEDESTRIAN ACCESS
15 FOR SIGNAL INSTALLATION, MODIFY RIGHT TURN LANE
CONSTRUCTION CHANNELIZATION AND PROVIDE TRAFFIC SAFETY
DRUMS WITH LIGHT TO ACCOMMODATE SIGNAL CONSTRUCTION AND
AS NECESSARY TO PROTECT NI--W SIGNAL EQUIPMENT ONCE
CONSTRUCTED.
16 REMOVE EXISTING CROSSWALK OR CHANNELIZATION
17 PAINTED TYPE 1 ARROW
18 TEMPORARY CROSSWALK STRIPING
19 PAINTED TYPE 3R ARROW
11-14-11
,ti4GIA�°�IEC��
�Oc WAs�t y�
�
_ o Y
'
zo3aow
crsTER ��
L ��G
SURVEYED: KPG
DRAWN BY: JLF/KAT
DESIGN BY: JLF
CHECK BY: JG
PROJ MGR: JF
FILE: 0655DCONST03.dwg
p�
U I ®
753 9th Avenue N 2502 Jefferson Avenue
Seattle, WA98109 Tacoma, WA98402 DOCUMENTS
206 286-1640 253 627-0720
www.kpg.com
�'- CITY OF RENTON
Public Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
RAINIER AVENUE S (SR 167)
S GRADY WAY TO S 2ND ST
CONSTRUCTION CHANNELIZATION PLANS - STAGE MEDIAN�
STA 1 �3+00 TO STA 3G+5O
DRAWING NO.7
R
PROJECT NO. TED403430
--ED AID NO. -vMO;C�7(048) �
DATE: NOV 2011
SHEET NO. 47 OF 304