Loading...
HomeMy WebLinkAboutTRO4103430.48CD N N 0 V) z 0 0 0 Ln Ln 0 0 0 V a L 0 / Z c� V) LLJ 0 / Ln 0 / z 0 Z w Of cn v w 0 ly- r. 2' BUFI GENERAL CONSTRUCTION CHANNELIZATION NOTES FOR GENERAL CONSTRUCTION CHANNELIZATION NOTES, SEE SHEET 37. CONSTRUCTION CHANNELIZATION LEGEND TRAFFIC SAFETY DRUMS WITH LIGHT \\\ MAXIMUM EXTENTS OF WORK ZONE > > � BUSINESS OPEN DURING CONSTRUCTION BUFFER BUFFER SIGN, SEE DETAIL SHEET 38. 3UFFER - - - - - - - CONSTRUCTION LIMITS 11' 11' 11' DIRECTION OF TRAVEL SOUTHBOUND LANE SOUTHBOUND LANE WORK ZONE LEFT TURN LANE NORTHBOUND LANE NORTHBOUND LANE L� L� ---wd 2' [--a— TRAFFIC SAFETY DRUMS WITH LIGHT SECTION E-E —w12' I w­ TRAFFIC SAFETY DRUMS WITH LIGHT PLAN 0 20 40 80 120 SCALE IN FEET Tm343048 1 i TEMPORARY CHANNELIZATION NOTES O1 WORKZONE BARRIER, SEE CONSTRUCTION STAGING LEGEND, THIS SHEET 20 PAINTED DOUBLE YELLOW CENTER LINE O3 PAINTED LANE LINE ® PAINTED EDGE LINE O5 PAINTED WIDE LINE © PAINTED MEDIAN LINE O7 PAINTED TYPE 2L ARROW ® PAINTED TWO-WAY LEFT TURN LINE 10 PAINTED DOTTED EXTENSION LINE. 11 PAINTED STOP LINE. 12 PAINTED TYPE 2R ARROW 13 EXISTING CROSSWALK STRIPING TO REMAIN 14 MAINTAIN ADA COMPLIANT PEDESTRIAN ACCESS 15 FOR SIGNAL INSTALLATION, MODIFY RIGHT TURN LANE CONSTRUCTION CHANNELIZATION AND PROVIDE TRAFFIC SAFETY DRUMS WITH LIGHT TO ACCOMMODATE SIGNAL CONSTRUCTION AND AS NECESSARY TO PROTECT NEW SIGNAL EQUIPMENT ONCE CONSTRUCTED. 16 REMOVE EXISTING CROSSWALK OR CHANNELIZATION 17 PAINTED TYPE 1 ARROW 18 TEMPORARY CROSSWALK STRIPING �g PAINTED TYPE 3R ARROW 11-14-11 54'' WA��� �O �j�cq�N _ o - zo3zo�9 ww rsTER .off c�� �slo,�AL SURVEYED: KPG DRAWN BY: JLF/KAT DESIGN BY: JLF CHECK BY: JG PROJ MGR: JF FILE: 0655DCONST03.dwg p K � BID 753 9th Avenue N 2502 Jefferson Avenue Seattle, WA98109 Tacoma, WA98402 DOCUMENTS (206) 286-1640 (253) 627-0720 www.kpg.com �'- CITY OF RENTON "u Public Works Department APPROVED FOR CONSTRUCTION BY: DATE: , RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2ND ST CONSTRUCTION CHANNELIZATION PLANS - STAGE 3 MEDIAN STA 30+50 TO STA 42+50 DRAWING NO. 48 PROJECT NO. TED403430 FED AID NO.-CM0167(048) DATE: NOV2011 SHEET NO. 48 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE