Loading...
HomeMy WebLinkAboutTRO4103430.5 (2)�d- N CD co Ln 0 s_ U 0 U i 0 i z c� V) w 0 i Q I 0 Ln 0 e z 0 z w 0L 0 t� a GENERAL JOINT UTILITY TRENCH PLAN NOTES 0 .19 -01 0 N EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL A.ND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF TIDE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE FRANCHISE UTILITIES. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR CONVERSION. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE PROPERTY OWNER FROM THE RIGHT—OF—WAY TO EXISTING PRIVATE METERS. IHOP VAULT SCHEDULE 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174-192. ADJUST THE HORIZONTAL ALIGNMENT AND VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. �'x G IA 011-14-11 SURVEYED: KPG 0& _ � ` `05 was�rL DRAWN BY: SOD �o N DESIGN BY: SOD CHECK BY: JLF �� 20320 w� c �FcrsTf PROJ MGR: JF �SSj�NAL E�G1 REVISION DESCRIPTION BY APP. DATE FILE: 0655DJUT01.dwg 753 9th Avenue N 2502 Jefferson Avenue Seattle, WA 98109 Tacoma, WA 98402 (206) 286-1640 (253) 627-0720 www,kpg,com C8 CONSTRUCTION NOTES 4" DIAMETER CONDUIT CENTURYLINK (2 CONDUIT) 2" DIAMETER CONDUIT—COMCAST (1 CONDUIT) 4" DIAMETER CONDUIT—PSE POWER (I CONDUIT) END INSTALLATION OF 4" DIAMETER CONDUIT—PSE GAS — APPROXIMATE STA 27+40, LT rn� o JOINT UTILITY TRENCH LEGEND 0 6, FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. ®® ®® ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN/FROM LEFT CONDUIT OUT/TO RIGHT P7 1—PH MP TRANSFORMER V08 PSE PSE CONTRACTOR 12p 2-4" Q8 264 TA #919 CENTURYLINK CENTURYLINK CONTRACTOR 12q,13q 14q,15q,16q,17q C6 2436 MEDIUM DUTY VAULT — COMCAST COMCAST CONTRACTOR 7c,8c,9c,50c 10c,11c P8 THREE PHASE J—BOX J13 PSE PSE CONTRACTOR 9p,10p,3-4" _ 13p,14p Q9 264 TA #920 CENTURYLINK CENTURYLINK [CONTRACTOR — 19q,20q C7 2436 MEDIUM DUTY VAULT — COMCAST COMCAST CONTRACTOR 1001c 12c,13c,14c P9 THREE PHASE J—BOX J14 PSE PSE CONTRACTOR 13p,14p 15p,16p,17p C8 17"00" — COMCAST COMCAST CONTRACTOR — 19c P35 INTERCEPT POINT IP06 PSE — CONTRACTOR 15p — C37 17" 00" — COMCAST COMCAST CONTRACTOR 12c — P36 INTERCEPT POINT IP07 PSE — CONTRACTOR — 20p P46 INTERCEPT POINT IP05 PSE — CONTRACTOR — 1-4" P47 INTERCEPT POINT IP05 PSE — CONTRACTOR — 1-4" P51 INTERCEPT POINT IP05A PSE — CONTRACTOR — 1-4" P63 REMOVE VAULT J13A PSE — CONTRACTOR — — P64 REMOVE VAULT J15 PSE — CONTRACTOR — — P65 REMOVE VAULT J17A PSE — CONTRACTOR — — CITY OF RENTON BID Public Works Department DOCUMENTS APPROVED FOR CONSTRUCTION DATE-/Z 0 5 10 20 40 60 SCALE IN FEET T=3430108 CALL 2 DAYS BEFORE YOU DIG 1-800-424-5555 CATEGORY SHEET RIGHT OF WAY PLANS 11 EXISTING CONDITIONS — _ _ SITr-PREPARATION & TESC PLAN ALIGNMENT PLAN 59 I 73 85 ALIGNMENT PROFILE 97 DRAINAGE PLANS 108 DRAINAGE PROFILE 116-119 WATER PLAN 136 WATER PROFILE 150 JOINT UTILITY TRENCH PLAN — JOINT UTILITY TRENCH PROFILES 184 PROPERTY RESTORATION PLANS 199 CHANNELIZATION & SIGNING PLAN 221 ILLUMINATION PLANS 232 IRRIGATION PLAN 286 LANDSCAPE PLAN 298 RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2ND ST JOINT UTILITY TRENCH PLAN STA 24+50 TO STA 29+00 DRAWING NO. 168 PROJECT NO. TED403430 FED AID NO.-CM0167(048) DATE: NOV 2011 SHEET NO. 168 OF 304