LEGEND CONSTRUCTION NOTES GENERAL NOTES SIGNAL CONSTRUCTION STAGING NOTES
EXISTING NEW DESCRIPTION O FURNISH AND INSTALL VEHICLE DETECTION VIDEO CAMERA SYSTEM INCLUDING FURNISHING ALL ASSOCIATED EQUIPMENT AND WIRING FOR TEMPORARY 1. CONTRACTOR SHALL PROVIDE PEDESTRIAN ACCESS TO PUSH BUTTONS STAGE 1: INITIALLY, USE EXISTING SIGNAL POLES AND EQUIPMENT. MAKE
�.•� SIGNAL POLE 1 DURING CONSTRUCTION. EASE OF ACCESS SHALL MEET OR EXCEED TEMPORARY MODIFICATIONS AND PROVIDE ADDITIONAL EQUIPMENT PER
USE ON EXISTING SIGNAL SYSTEM. UPON REMOVAL OF EXISTING SIGNAL SYSTEM, VIDEO DETECTION SYSTEM SHALL BE RELOCATED TO NEW SIGNAL POLE CURRENT CONDITIONS. THIS TEMPORARY SIGNAL PLAN.
o ® SIGNAL POLE TYPE I OR PS PER SIGNAL PLANS. FOR PERMANENT WIRING, SEE SIGNAL PLANS. TEMPORARY LOCATIONS SHALL BE APPROVED BY ENGINEER IN THE FIELD. 2. CONTRACTOR SHALL COORDINATE ALIGNMENT OF EXISTING AND WHEN NEW SIGNAL EQUIPMENT IS AVAILABLE, CONSTRUCT NEW SIGNAL
OHO DECORATIVE ROADWAY LUMINAIRE O RELOCATE EXISTING VEHICLE SIGNAL HEAD AND CENTER ON APPROACH LANE. FOR TEMPORARY SIGNAL HEAD LOCATIONS ON MAST ARMS, USE ARM TEMPORARY SIGNAL HEADS WITH CITY OF RENTON SIGNAL TECHNICIAN IN SYSTEM PER SIGNAL PLANS. FOR TEMPORARY MODIFICATIONS TO NEW
O LUMINAIRE MOUNT 'TYPE N' PER WSDOT STANDARD PLAN J-75.20-00. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. LOCATIONS SHALL BE THE FIELD. FOR FINAL SIGNAL HEAD ASSIGNMENTS AND PHASING SIGNAL SYSTEM SEE THIS TEMPORARY SIGNAL PLAN. ACTIVATE NEW AND
APPROVED BY ENGINEER IN THE FIELD. DIAGRAM, SEE SIGNAL PLANS. REMOVE EXISTING SIGNAL SYSTEM.
- -0 --� VEHICLE SIGNAL HEAD ® REMOVE EXISTING LEFT TURN VEHICLE SIGNAL HEAD. FURNISH AND INSTALL OPTICALLY PROGRAMMABLE 3-SECTION VEHICLE SIGNAL HEAD (RED ARROW, 3. CONTRACTOR SHALL PROTECT SIGNAL CONTROLLER CABINET AND ALL
VEHICLE SIGNAL HEAD YELLOW ARROW, GREEN ARROW) AT THE END OF THE MAST ARM. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. LOCATION SHALL ASSOCIATED CONDUIT/WIRING DURING CONSTRUCTION. STAGE 2: OPERATE NEW SIGNAL SYSTEM WITH TEMPORARY MODIFICATIONS
(LEFT OR RIGHT TURN) BE APPROVED BY ENGINEER IN THE FIELD. 4. TEMPORARY SIGNAL HEAD INSTALLATIONS SHALL BE INSTALLED SUCH PER THIS TEMPORARY SIGNAL PLAN.
VIRTUAL VEHICLE DETECTION ZONE. SHOWN FOR REFERENCE ONLY. FINAL NUMBER OF ZONES AND ZONE LOCATIONS SHALL BE DETERMINED BY THE THAT NO PERMANENT MODIFICATIONS ARE MADE TO THE PERMANENT
TENON (FUTURE HEAD LOCATION) O5 SIGNAL EQUIPMENT. WIRING SHALL BE ACCESSED THROUGH HANDHOLES. STAGE 3: OPERATE NEW SIGNAL SYSTEM WITH TEMPORARY MODIFICATIONS
ENGINEER ►N THE FIELD. COORDINATE WORK WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT. DRILLING THROUGH SIGNAL POLE OR MAST ARM IS NOT ALLOWED. TO ACCOMMODATE TEMPORARY CHANNELIZATION (NOT SHOWN IN
�- - PEDESTRIAN SIGNAL HEAD ® INSTALL THROUGH MOVEMENT VEHICLE SIGNAL HEAD (CIRCULAR RED, CIRCULAR YELLOW, CIRCULAR GREEN) IN TEMPORARY LOCATION. ALIGN SIGNAL 5. TEMPORARY VIDEO DETECTION CAMERA SYSTEMS SHALL BE FURNISHED CONSTRUCTION SIGNALIZATION PLANS). COORDINATE SIGNAL HEAD
HEAD WITH CENTER OF APPROACH LANE. IF MAST ARM DOES NOT HAVE AVAILABLE TENON, USE ARM MOUNT 'TYPE N' PER WSDOT STANDARD PLAN AND INSTALLED FOR ALL APPROACHES BY THE CONTRACTOR. PLACEMENT WITH THE ENGINEER IN THE FILED. AT THE END OF THIS
EVPE J-75.20-00. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. TEMPORARY LOCATIONS SHALL BE APPROVED BY ENGINEER IN THE 6. SIGNAL CONTROLLER MODIFICATION SHALL BE PERFORMED IN THE STAGE MODIFY TEMPORARY SIGNAL SYSTEM TO FINAL CONFIGURATION AS
MAST ARM/POLE MOUNTED SIGN FIELD. FOR FINAL SIGNAL HEAD CONFIGURATION, SEE SIGNAL PLANS. PRESENCE OF CITY OF RENTON SIGNAL TECHNICIANS. SHOWN ON SIGNAL PLANS.
® ® ELECTRICAL SERVICE CABINET 12 FOR INSTALLATION AND LOCATION OF SIGNAL POLE, SEE SIGNAL PLANS. 7. FOR CONDUIT/WIRING, SEE SIGNAL PLANS.
O 8. FOR CONSTRUCTION PHASING, SEE CONSTRUCTION CHANNELIZATION PLANS.
® m TRAFFIC CONTROLLER CABINET 13 FURNISH AND INSTALL VIDEO DETECTION CAMERA SYSTEM IN EXISTING TRAFFIC CONTROLLER CABINET WHILE EXISTING SIGNAL SYSTEM REMAINS IN 9. COORDINATE NIGHT WORK WITH CITY OF RENTON TRAFFIC SIGNAL
OPERATION. UPON DEACTIVATION OF EXISTING SIGNAL SYSTEM, RELOCATE VIDEO DETECTION CAMERA SYSTEM TO NEW TRAFFIC CONTROLLER CABINET. TECHNICIAN
® INTERCONNECT CABINET COORDINATE WORK WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT. 10. TEMPORARY INTERCONNECT WIRELESS RADIOS AND PTZ CAMERAS WILL BE
lTs ITS CABINET INSTALLED BY CITY OF RENTON SIGNAL TECHNICIANS.
15 FURNISH AND INSTALL OPTICALLY PROGRAMMABLE 3-SECTION VEHICLE SIGNAL HEAD (RED ARROW, YELLOW ARROW, GREEN ARROW) AT THE END OF
VEHICLE DETECTION CAMERA THE MAST ARM. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. LOCATION SHALL BE APPROVED BY ENGINEER IN THE FIELD. FOR
FINAL SIGNAL HEAD CONFIGURATION, SEE SIGNAL PLANS.
a PTZ OR RED LIGHT RUNNING CAMERA 16 PROVIDE OPENING IN CONSTRUCTION BARRIER FOR PEDESTRIAN ACCESS TO PEDESTRIAN PATHWAYS AND PUSH BUTTONS.
® z m B 0 11 JUNCTION BOX TYPE 1, 2, 8 18 APPROXIMATE LOCATION OF POWER SOURCE FOR EXISTING SIGNAL SYSTEM. SHOWN FOR REFERENCE ONLY. VERIFY LOCATION WITH CITY OF RENTON
WORK ZONE TRANSPORTATION MAINTENANCE DEPARTMENT. 0 5 10 20 40 60
19 PROTECT PROPOSED SIGNAL EQUIPMENT LOCATED WITHIN THE TRAVEL LANE WITH CONSTRUCTION BARRIER DURING CONSTRUCTION. PROVIDE OPENING IN SCALE IN FEET
7- CONSTRUCTION BARRIER FOR PEDESTRIAN ACCESS TO PEDESTRIAN PATHWAYS AND PUSH BUTTONS. Q
�- 12� 1
o �TT 343050
r
v �
RAINIER AVE S RAINIER AVE S
12
x � �
13o • •
l
SR 167
TYP
_ o
—
i
-_
5 TYP \ ...................... � 8
i
SR 167 -
-
i
19 12
8 M
Z El
-
�� Isa
`\ JU El 25-TA
� . .J .•. � EXISTING OR NEW TRAFFIC SIGNAL
Q / SYSTEMS SHALL REMAIN FULLY
12 /
_ OPERATIONAL DURING CONSTRUCTION.
••
0 13 18 INTERSCTI N IGN L Oil�IPATIONS�7.
o� SHALL BE DO E A NIGHT
U ORMED p
POLICE OFFICER SHALL DIREC
TRAFFIC DURING THE CHANGEO R.
STAGE 1 TEMPORARY SIGNAL PLAN `n STAGE 2 TEMPORARY SIGNAL PLAN
CIGq� 11-14-11 SURVEYED: KPG RAINIER AVENUE S (SR 167) DRAWING NO. 50
WAsKPG �-
�P of q c� DRAWN BY: AMK CITY OF RENTON
�,,� S GRADY WAY TO S 2ND ST PROJECT NO. TED403430
f
f _ o DESIGN BY: AMK 753 9th Avenue N 2502 Jefferson Avenue BID Public Works Department FED AID NO. -CM0167 048
O ( )
39324�
CHECK BY: JC Seattle; WA 98109 Tacoma, WA 98402 DOCUMENTS
�k� APPROVED FOR CONSTRUCTION TEMPORARY SIGNALIZATION PLANS
�IONa� ��G1� PROJ MGR: JF www,kpg.(206)286-1640 (253)627-0720 com RAINIER AVE S & SW GRADY WAY DATE: NOV 2011
BY: DATE: SHEET NO. 50 OF 304
NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DTEMPSIG01.dwg