Loading...
HomeMy WebLinkAboutTRO4103430.51CD w 0 u7 Q0 0 a c 0 U :n a, a / Z CD w 0 a) a a� u7 co 0 / z 0 Z w cn U w 0 a- / IM IN EXISTING NEW DESCRIPTION �-- �}■s�.•- SIGNAL POLE a0 ® SIGNAL POLE TYPE I OR PS O0 DECORATIVE ROADWAY LUMINAIRE O LUMINAIRE --� VEHICLE SIGNAL HEAD 41 VEHICLE SIGNAL HEAD (LEFT OR RIGHT TURN) TENON (FUTURE HEAD LOCATION) — PEDESTRIAN SIGNAL HEAD --�; �- EVPE MAST ARM/POLE MOUNTED SIGN ® ® ELECTRICAL SERVICE CABINET ® ® TRAFFIC CONTROLLER CABINET ® INTERCONNECT CABINET Irs ITS CABINET 1111111111111111114 VEHICLE DETECTION CAMERA PTZ OR RED LIGHT RUNNING CAMERA ® z m ®® I] JUNCTION BOX TYPE 1, 2, 8 WORK ZONE CONSTRUCTION NOTES ® RELOCATE EXISTING VEHICLE SIGNAL HEAD AND CENTER ON APPROACH LANE. FOR TEMPORARY SIGNAL HEAD LOCATIONS ON MAST ARMS, USE ARM MOUNT 'TYPE N' PER WSDOT STANDARD PLAN J-75.20-00. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. LOCATIONS SHALL BE APPROVED BY ENGINEER IN THE FIELD. O3 COVER VEHICLE SIGNAL HEAD DURING CONSTRUCTION. SEE SPECIAL PROVISIONS. ® VIRTUAL VEHICLE DETECTION ZONE. SHOWN FOR REFERENCE ONLY. FINAL NUMBER OF ZONES AND ZONE LOCATIONS SHALL BE DETERMINED BY THE ENGINEER IN THE FIELD. COORDINATE WORK WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT. ® INSTALL LEFT TURN VEHICLE SIGNAL HEAD (RED ARROW, YELLOW ARROW, GREEN ARROW) IN TEMPORARY LOCATION. ALIGN SIGNAL HEAD WITH CENTER OF APPROACH LANE. IF MAST ARM DOES NOT HAVE AVAILABLE TENON, USE ARM MOUNT 'TYPE N' PER WSDOT STANDARD PLAN J-75.20-00. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. TEMPORARY LOCATIONS SHALL BE APPROVED BY ENGINEER IN THE FIELD. FOR FINAL SIGNAL HEAD CONFIGURATION, SEE SIGNAL PLANS. ® INSTALL THROUGH MOVEMENT VEHICLE SIGNAL HEAD (CIRCULAR RED, CIRCULAR YELLOW, CIRCULAR GREEN) IN TEMPORARY LOCATION. ALIGN SIGNAL HEAD WITH CENTER OF APPROACH LANE. IF MAST ARM DOES NOT HAVE AVAILABLE TENON, USE ARM MOUNT 'TYPE N' PER WSDOT STANDARD PLAN J-75.20-00. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. TEMPORARY LOCATIONS SHALL BE APPROVED BY ENGINEER IN THE FIELD. FOR FINAL SIGNAL HEAD CONFIGURATION, SEE SIGNAL PLANS. 10 LOCATION OF PROPOSED SIGNAL POLE FOUNDATION. FOR PROPOSED SIGNAL DETAILS, SEE SIGNAL PLANS. CONSTRUCT SIGNAL POLE FOUNDATION PER SIGNAL PLANS. FURNISH AND INSTALL CLASS 3700# TYPE V STRAIN POLE PER WSDOT STANDARD PLAN J-7C (EXCEPT BASE PLATE SHALL MATCH BOLT PATTERN OF PROPOSED SIGNAL POLE PER BASE PLATE DETAIL, SHEET 256). FURNISH AND INSTALL TWO THROUGH MOVEMENT VEHICLE SIGNAL HEADS AND ONE LEFT TURN SIGNAL HEAD (INCREASED TO TWO LEFT TURN SIGNAL HEADS AT STAGE 2), 40OW COBRA HEAD LUMINAIRE AND ALL ASSOCIATED EQUIPMENT/WIRING FOR SPAN WIRE SIGNAL PER WSDOT STANDARD PLAN J-15.15-00 FOR USE DURING CONSTRUCTION. UPON COMPLETING OF STAGE 2, REMOVE STRAIN POLE AND INSTALL SIGNAL POLE PER SIGNAL PLANS. PROPOSED SIGNAL POLE SHOWN FOR REFERENCE ONLY. 11 FURNISH AND INSTALL TIMBER STRAIN POLE AND DOWN GUY WIRE AS PART OF OVERHEAD SPAN WIRE SIGNAL PER WSDOT STANDARD PLAN J-15.15-00. PROVIDE ALL ASSOCIATED EQUIPMENT/WIRING TO ATTACH OVERHEAD SPAN WIRE. 12 FOR INSTALLATION AND LOCATION OF SIGNAL POLE, SEE SIGNAL PLANS. 13 FURNISH AND INSTALL VIDEO DETECTION CAMERA SYSTEM IN EXISTING TRAFFIC CONTROLLER CABINET WHILE EXISTING SIGNAL SYSTEM REMAINS IN OPERATION. UPON DEACTIVATION OF EXISTING SIGNAL SYSTEM, RELOCATE VIDEO DETECTION CAMERA SYSTEM TO NEW TRAFFIC CONTROLLER CABINET. COORDINATE WORK WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT, 16 PROVIDE OPENING IN CONSTRUCTION BARRIER FOR PEDESTRIAN ACCESS TO PEDESTRIAN PATHWAYS AND PUSH BUTTONS. 17 RELOCATE VEHICLE SIGNAL HEADS FROM EXISTING MAST ARM TO TEMPORARY SPAN WIRE UPON CHANGEOVER TO NEW SIGNAL SYSTEM. PROVIDE ALL ASSOCIATED EQUIPMENT/WIRING PER WSDOT STANDARD PLAN J-15.15-00. 1 g APPROXIMATE LOCATION OF POWER SOURCE FOR EXISTING SIGNAL SYSTEM. SHOWN FOR REFERENCE ONLY. VERIFY LOCATION WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT. CTAt'_C 4 TCRADnDADV CIr`_AIAI DI AAI 7777 RAINIER AVE S GENERAL NOTES 1. CONTRACTOR SHALL PROVIDE PEDESTRIAN ACCESS TO PUSH BUTTONS DURING CONSTRUCTION. EASE OF ACCESS SHALL MEET OR EXCEED CURRENT CONDITIONS. 2. CONTRACTOR SHALL COORDINATE ALIGNMENT OF EXISTING AND TEMPORARY SIGNAL HEADS WITH CITY OF RENTON SIGNAL TECHNICIAN IN THE FIELD. FOR FINAL SIGNAL HEAD ASSIGNMENTS AND PHASING DIAGRAM, SEE SIGNAL PLANS. 3. CONTRACTOR SHALL PROTECT SIGNAL CONTROLLER CABINET AND ALL ASSOCIATED CONDUIT/WIRING DURING CONSTRUCTION. 4. TEMPORARY SIGNAL HEAD INSTALLATIONS SHALL BE INSTALLED SUCH THAT NO PERMANENT MODIFICATIONS ARE MADE TO THE PERMANENT SIGNAL EQUIPMENT. WIRING SHALL BE ACCESSED THROUGH HANDHOLES. DRILLING THROUGH SIGNAL POLE OR MAST ARM IS NOT ALLOWED. 5. TEMPORARY VIDEO DETECTION CAMERA SYSTEMS SHALL BE FURNISHED AND INSTALLED FOR ALL APPROACHES BY THE CONTRACTOR. 6. SIGNAL CONTROLLER MODIFICATION SHALL BE PERFORMED IN THE PRESENCE OF CITY OF RENTON SIGNAL TECHNICIANS. 7. FOR CONDUIT/WIRING, SEE SIGNAL PLANS. 8. FOR CONSTRUCTION PHASING, SEE CONSTRUCTION CHANNELIZATION PLANS. 9. COORDINATE NIGHT WORK WITH CITY OF RENTON TRAFFIC SIGNAL TECHNICIAN 10. TEMPORARY INTERCONNECT WIRELESS RADIOS AND PTZ CAMERAS WILL BE INSTALLED BY CITY OF RENTON SIGNAL TECHNICIANS. CONSTRUCTION NOTES SIGNAL CONSTRUCTION STAGING NOTES STAGE 1: INITIALLY, USE EXISTING SIGNAL POLES AND EQUIPMENT. MAKE TEMPORARY MODIFICATIONS AND PROVIDE ADDITIONAL EQUIPMENT PER THIS TEMPORARY SIGNAL PLAN. WHEN NEW SIGNAL EQUIPMENT IS AVAILABLE, CONSTRUCT NEW SIGNAL SYSTEM PER SIGNAL PLANS. FOR TEMPORARY MODIFICATIONS TO NEW SIGNAL SYSTEM SEE THIS TEMPORARY SIGNAL PLAN. ACTIVATE NEW AND REMOVE EXISTING SIGNAL SYSTEM. STAGE 2: OPERATE NEW SIGNAL SYSTEM WITH TEMPORARY MODIFICATIONS PER THIS TEMPORARY SIGNAL PLAN. STAGE 3: OPERATE NEW SIGNAL SYSTEM WITH TEMPORARY MODIFICATIONS TO ACCOMMODATE TEMPORARY CHANNELIZATION (NOT SHOWN IN CONSTRUCTION SIGNALIZATION PLANS). COORDINATE SIGNAL HEAD PLACEMENT WITH THE ENGINEER IN THE FILED. AT THE END _OF THIS STAGE MODIFY TEMPORARY SIGNAL ,'P�i�Y' TO FINAL C ONFiGUR,4.Yi0N AS fiHnWN oN Sirui Pi ANC 0 5 10 20 40 60 SCALE IN FEET 1 g PROTECT PROPOSED SIGNAL EQUIPMENT LOCATED WITHIN THE TRAVEL LANE WITH CONSTRUCTION BARRIER DURING CONSTRUCTION. PROVIDE OPENING IN CONSTRUCTION BARRIER FOR PEDESTRIAN ACCESS TO PEDESTRIAN PATHWAYS AND PUSH BUTTONS. 20 FURNISH AND INSTALL VEHICLE DETECTION VIDEO CAMERA SYSTEM INCLUDING FURNISHING ALL ASSOCIATED EQUIPMENT AND WIRING FOR TEMPORARY USE ON EXISTING SIGNAL SYSTEM. UPON REMOVAL OF EXISTING SIGNAL SYSTEM, VIDEO DETECTION SYSTEM SHALL BE RELOCATED TO TEMPORARY SPAN WIRE LOCATION PER THESE PLANS. UPON COMPLETION OF STAGE 2 CONSTRUCTION, VIDEO DETECTION SYSTEM SHALL BE MOVED TO PERMANENT LOCATION PER SIGNAL PLANS. FOR PERMANENT WIRING, SEE SIGNAL PLANS. TEMPORARY LOCATIONS SHALL BE APPROVED BY ENGINEER IN THE FIELD. 7 ,C 0 I r� ON 11-14-11 �P e WAs� I`� ti "c SURVEYED: KPG DRAWN BY: AMK Kp�' BID �06 CITY OF RENTON ML — RAINIER AVENUE S (SR 167) S G RAD�Y WAY TO S 2N D ST DRAWING NO. 51 PROJECT NO. TED403430 �e o — z DESIGN BY: AMK CHECK BY: JC 753 9th Avenue N 2502 Jefferson Avenue Seattle, WA98109 Tacoma, WA98402 DOCUMENTS Public Works Department TEMPORARY SIGNALIZATION PLANS FED AID NO. CM0167(048) � 39324 w� o� �F�ISTV w PROJ MGR: JF, (206) 286-1640 (253) 627.0720 APPROVED FOR CONSTRUCTION DATE: NOV 2011 IDNAL �� kpg,com / fir' RAINIER AVE S & SW 7TH ST SHEET NO. 51 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DTEMPSIG01.dwg BY: DATE: