Loading...
HomeMy WebLinkAboutTRO4103430.53CD N N \ O, 3 0 CD V) r w Ln Ln 0 U O v L_ -:) LC ; Ln C0 O / z O z w cn c� w 0 Of 0 LEGEND EXISTING Cam==== O ®zm NEW DESCRIPTION SIGNAL POLE ® SIGNAL POLE TYPE I OR PS (�10 DECORATIVE ROADWAY LUMINAIRE LUMINAIRE --� VEHICLE SIGNAL HEAD VEHICLE SIGNAL HEAD (LEFT OR RIGHT TURN) TENON (FUTURE HEAD LOCATION) - PEDESTRIAN SIGNAL HEAD - EVPE MAST" ARM/POLE MOUNTED SIGN ELECTRICAL SERVICE CABINET I� TRAFFIC CONTROLLER CABINET INTERCONNECT CABINET L=s,, ITS CABINET 111111111111111411 VEHICLE DETECTION CAMERA Ill PTZ OR RED LIGHT RUNNING CAMERA IR ® ® JUNCTION BOX TYPE 1, 2, 8 WORK ZONE CONSTRUCTION NOTES SIGNAL CONSTRUCTION STAGING NOTES 2 RELOCATE EXISTING VEHICLE SIGNAL HEAD AND CENTER ON APPROACH LANE. FOR TEMPORARY SIGNAL HEAD LOCATIONS ON MAST ARMS USE ARM MOUNT STAGE 1: INITIALLY, USE EXISTING SIGNAL POLES AND EQUIPMENT, MAKE O TEMPORARY MODIFICATIONS AND PROVIDE ADDITIONAL EQUIPMENT PER TYPE N PER WSDOT STANDARD PLAN J-75.20-00. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. LOCATIONS SHALL BE APPROVED THIS TEMPORARY SIGNAL PLAN. BY ENGINEER IN THE FIELD. WHEN NEW SIGNAL EQUIPMENT IS AVAILABLE, CONSTRUCT NEW SIGNAL ® COVER VEHICLE SIGNAL HEAD DURING CONSTRUCTION. SEE SPECIAL PROVISIONS. SYSTEM PER SIGNAL PLANS. FOR TEMPORARY MODIFICATIONS TO NEW SIGNAL SYSTEM SEE THIS TEMPORARY SIGNAL PLAN. ACTIVATE NEW AND ® REMOVE EXISTING LEFT TURN VEHICLE SIGNAL HEAD. FURNISH AND INSTALL OPTICALLY PROGRAMMABLE 3-SECTION VEHICLE SIGNAL HEAD (RED ARROW, REMOVE EXISTING SIGNAL SYSTEM. YELLOW ARROW, GREEN ARROW) AT THE END OF THE MAST ARM. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. LOCATION SHALL BE APPROVED BY ENGINEER IN THE FIELD. STAGE 2: OPERATE NEW SIGNAL SYSTEM WITH TEMPORARY MODIFICATIONS o 5 VIRTUAL VEHICLE DETECTION ZONE. SHOWN FOR REFERENCE ONLY. FINAL NUMBER OF ZONES AND ZONE LOCATIONS SHALL BE DETERMINED BY THE PER THIS TEMPORARY SIGNAL PLAN. ENGINEER IN THE FIELD. COORDINATE WORK WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT. STAGE 3: OPERATE NEW SIGNAL SYSTEM WITH TEMPORARY MODIFICATIONS O7 INSTALL LEFT TURN VEHICLE SIGNAL HEAD (RED ARROW, YELLOW ARROW, GREEN ARROW) IN TEMPORARY LOCATION. ALIGN SIGNAL HEAD WITH CENTER OF TO ACCOMMODATE TEMPORARY CHANNELIZATION (NOT SHOWN IN APPROACH LANE. IF MAST ARM DOES NOT HAVE AVAILABLE TENON, USE ARM MOUNT 'TYPE N' PER WSDOT STANDARD PLAN J-75.20-00. PROVIDE CONSTRUCTION SIGNALIZATION PLANS). COORDINATE SIGNAL HEAD ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. TEMPORARY LOCATIONS SHALL BE APPROVED BY ENGINEER IN THE FIELD. FOR FINAL SIGNAL PLACEMENT WITH THE ENGINEER IN THE FILED. AT THE END OF THIS HEAD CONFIGURATION, SEE SIGNAL PLANS. STAGE MODIFY TEMPORARY SIGNAL SYSTEM TO FINAL CONFIGURATION AS 11 FURNISH AND INSTALL TIMBER STRAIN POLE AND DOWN GUY WIRE AS PART OF OVERHEAD SPAN WIRE SIGNAL PER WSDOT STANDARD PLAN J-15.15-00. SHOWN ON SIGNAL PLANS. PROVIDE ALL ASSOCIATED EQUIPMENT/WIRING TO ATTACH OVERHEAD SPAN WIRE. 12 FOR INSTALLATION AND LOCATION OF SIGNAL POLE, SEE SIGNAL PLANS. 13 FURNISH AND INSTALL VIDEO DETECTION CAMERA SYSTEM IN EXISTING TRAFFIC CONTROLLER CABINET WHILE EXISTING SIGNAL SYSTEM REMAINS IN OPERATION. UPON DEACTIVATION OF EXISTING SIGNAL SYSTEM, RELOCATE VIDEO DETECTION CAMERA SYSTEM TO NEW TRAFFIC CONTROLLER CABINET. COORDINATE WORK WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT. 14 LOCATION OF PROPOSED SIGNAL POLE FOUNDATION. FOR PROPOSED SIGNAL DETAILS, SEE SIGNAL PLANS. CONSTRUCT SIGNAL POLE FOUNDATION PER SIGNAL PLANS. FURNISH AND INSTALL CLASS 3700# TYPE V STRAIN POLE PER WSDOT STANDARD PLAN J--7C (EXCEPT BASE PLATE SHALL MATCH BOLT 0 5 10 20 40 60 PATTERN OF PROPOSED SIGNAL POLE PER BASE PLATE DETAIL, SHEET 256). FURNISH AND INSTALL TWO THROUGH MOVEMENT VEHICLE SIGNAL HEADS AND SCALE IN FEET ONE LEFT TURN SIGNAL HEAD, 40OW COBRA HEAD LUMINAIRE AND ALL ASSOCIATED EQUIPMENT/WRING FOR SPAN WIRE SIGNAL PER WSDOT STANDARD PLAN J-15.15-00 FOR USE DURING CONSTRUCTION. UPON COMPLETING OF STAGE 2, REMOVE STRAIN POLE AND INSTALL SIGNAL POLE PER SIGNAL PLANS. PROPOSED SIGNAL POLE SHOWN FOR REFERENCE ONLY. CONSTRUCTION NOTES 16 PROVIDE OPENING IN CONSTRUCTION BARRIER FOR PEDESTRIAN ACCESS TO PEDESTRIAN PATHWAYS AND PUSH BUTTONS. GENERAL NOTES 1. CONTRACTOR SHALL PROVIDE PEDESTRIAN ACCESS TO PUSH BUTTONS DURING CONSTRUCTION. EASE OF ACCESS SHALL MEET OR EXCEED CURRENT CONDITIONS. 2. CONTRACTOR SHALL COORDINATE ALIGNMENT OF EXISTING AND TEMPORARY SIGNAL HEADS WITH CITY OF RENTON SIGNAL TECHNICIAN IN THE FIELD. FOR FINAL SIGNAL HEAD ASSIGNMENTS AND PHASING DIAGRAM, SEE SIGNAL PLANS. 3. CONTRACTOR SHALL PROTECT SIGNAL CONTROLLER CABINET AND ALL ASSOCIATED CONDUIT/WIRING DURING CONSTRUCTION. 4. TEMPORARY SIGNAL HEAD INSTALLATIONS SHALL BE INSTALLED SUCH THAT NO PERMANENT MODIFICATIONS ARE MADE TO THE PERMANENT SIGNAL EQUIPMENT. WIRING SHALL BE ACCESSED THROUGH HANDHOLES. DRILLING THROUGH SIGNAL POLE OR MAST ARM IS NOT ALLOWED. 5. TEMPORARY VIDEO DETECTION CAMERA SYSTEMS SHALL BE FURNISHED AND INSTALLED FOR ALL APPROACHES BY THE CONTRACTOR. 6. SIGNAL CONTROLLER MODIFICATION SHALL BE PERFORMED IN THE PRESENCE OF CITY OF RENTON SIGNAL TECHNICIANS. 7, FOR CONDUIT/WIRING, SEE SIGNAL PLANS. 8. FOR CONSTRUCTION PHASING, SEE CONSTRUCTION CHANNELIZATION PLANS. 9. COORDINATE NIGHT WORK WITH CITY OF RENTON TRAFFIC SIGNAL TECHNICIAN 10. TEMPORARY INTERCONNECT WIRELESS RADIOS AND PTZ CAMERAS WILL BE INSTALLED BY CITY OF RENTON SIGNAL TECHNICIANS. T=343053 17 RELOCATE VEHICLE SIGNAL HEADS FROM EXISTING MAST ARM TO TEMPORARY SPAN WIRE UPON CHANGEOVER TO NEW SIGNAL SYSTEM. PROVIDE ALL O 20 FURNISH AND INSTALL VEHICLE DETECTION VIDEO ON EXISTING SIGNAL SYSTEM. UPON REMOVAL OF CAMERA SYSTEM INCLUDING FURNISHING ALL ASSOCIATED EQUIPMENT AND EXISTING SIGNAL SYSTEM, VIDEO DETECTION SYSTEM SHALL BE RELOCATED WIRING FOR TEMPORARY USE TO TEMPORARY SPAN WIRE ASSOCIATED EQUIPMENT/WIRING PER WSDOT STANDARD PLAN J-15.15-00. LOCATION PER THESE PLANS. UPON COMPLETION OF STAGE 2 CONSTRUCTION, VIDEO DETECTION SYSTEM SHALL BE MOVED TO PERMANENT LOCATION PER SIGNAL PLANS. FOR PERMANENT WIRING, SEE SIGNAL" PLANS. TEMPORARY LOCATIONS SHALL BE APPROVED BY ENGINEER IN THE FIELD. 18 APPROXIMATE LOCATION OF POWER JOURCE FOR EXISTING SIGNAL SYSTEM. SHOWN FOR REFERENCE ONLY. VERIr Y LOCATION WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT. 1 12 �i II II II III F�A I 3 16- 1 RAINIER AVE S 3 — ...... RAINIER AVE Swoo , 13 4 - — — ............. _. 5 TYP 17 •. 1 20 20 ® ®1z a e _ m ul EXISTING NEW TRAFFIC SIGNAL SYSTEMS SHALL `t ° 12 REMAIN F LY OPERATIONAL DURING CONSTRUCTION.CE `� oG INTERSECTION SIGNAL MODIFICATIONS SHALL BE o� M DONE AT NIGHT. UNIFORMED POLICE OFFICER SHALL th 14 - ���� DIRECT TRAFFIC DURING THE CHANGEOVER.���� STAGE 1 TEMPORARY SIGNAL PLAN STAGE 2 TEMPORARY SIGNAL PLAN 11-14-11 SURVEYED: KPG cICAN ' CITY OF RENTON Kph , RAINIER AVENUES SR 167 DRAWING No. 53 � Se' Of WAs�r DRAWN BY: AMK S G RADY WAY TO S 2N D ST PROJECT NO. TED403430 _ z DESIGN BY: AMK FED AID NO.-CM0167(048) 753 9th Avenue N 2502 Jefferson Avenue I Public Works Department CHECK BY: JC Seattle, WA98109 Tacoma, WA98402 DOCUMENTS TEMPORARY SIGNALIZATION PLANS �o�, 9T�Rti �wx (206) 286-1640 (253) 627-0720 APPROVED FOR CONSTRUCTION �///jf �� PROJ MGR: JF ,ww.kpg.com RAINIER AVE S & S 3RD PL SHEET NO. 53 OF 304 oNAL E BY: DATE: INUMBERI REVISION DESCRIPTION BY APP. DATE FILE: 0655DTEMPSIG01.dwg