Loading...
HomeMy WebLinkAboutTRO4103430.54LEGEND SIGNAL CONSTRUCTION STAGING NOTES CONSTRUCTION NOTES Q N O N �t N a 0 C� F W I-- C U-) c0 O O / 0 / z CP w 0 / a .o Ln QD / z 0 z w V) v w 0 Of 0_ / Q. EXISTING NEW DESCRIPTION �- — �•- SIGNAL POLE o ® SIGNAL POLE TYPE I OR PS O0 DECORATIVE ROADWAY LUMINAIRE o LUMINAIRE --p ---�► VEHICLE SIGNAL HEAD VEHICLE SIGNAL HEAD (LEFT OR RIGHT TURN) - TENON (FUTURE HEAD LOCATION) - PEDESTRIAN SIGNAL HEAD - & EVPE {� -+ MAST ARM/POLE MOUNTED SIGN ® ® ELECTRICAL SERVICE CABINET ® m TRAFFIC CONTROLLER CABINET ® INTERCONNECT CABINET Iws ITS CABINET VEHICLE DETECTION CAMERA a PTZ OR RED LIGHT RUNNING CAMERA ® z m ®0 0111 JUNCTION BOX TYPE 1, 2, 8 WORK ZONE RAINIER AVE S STAGE 1: INITIALLY, USE EXISTING SIGNAL POLES AND EQUIPMENT. MAKE TEMPORARY MODIFICATIONS AND PROVIDE ADDITIONAL EQUIPMENT PER FURNISH AND INSTALL VEHICLE DETECTION VIDEO CAMERA SYSTEM INCLUDING FURNISHING ALL ASSOCIATED EQUIPMENT AND WIRING FOR THIS TEMPORARY SIGNAL PLAN. TEMPORARY USE ON EXISTING SIGNAL SYSTEM. UPON REMOVAL OF EXISTING SIGNAL SYSTEM VIDEO DETECTIONSYSTEM SHALL BE WHEN NEW SIGNAL EQUIPMENT IS AVAILABLE, CONSTRUCT NEW SIGNAL RELOCATED TO NEW SIGNAL POLE PER SIGNAL PLANS. FOR PERMANENT WIRING, SEE SIGNAL PLANS. TEMPORARY LOCATIONS SHALL BE SYSTEM PER SIGNAL PLANS. FOR TEMPORARY MODIFICATIONS TO NEW APPROVED BY ENGINEER IN THE FIELD. SIGNAL SYSTEM SEE THIS TEMPORARY SIGNAL PLAN. ACTIVATE NEW AND O5 VIRTUAL VEHICLE DETECTION ZONE. SHOWN FOR REFERENCE ONLY. FINAL NUMBER OF ZONES AND ZONE LOCATIONS SHALL BE REMOVE EXISTING SIGNAL SYSTEM. DETERMINED BY THE ENGINEER IN THE FIELD. COORDINATE WORK WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT. © FURNISH AND INSTALL TEMPORARY LEFT TURN VEHICLE SIGNAL HEAD (RED ARROW, YELLOW ARROW, GREEN ARROW) ON EXIST ING MAST STAGE S OPERATE NEW SIGNAL SYSTEM WITH TEMPORARY MODIFICATIONS ARM. ALIGN SIGNAL HEAD WITH CENTER OF APPROACH LANE. IF MAST ARM DOES NOT HAVE AVAILABLE TENON, USE ARM MOUNT PER THIS TEMPORARY SIGNAL PLAN. 'TYPE N' PER WSDOT STANDARD PLAN J-75.20-00. TEMPORARY LOCATIONS SHALL BE APPROVED BY ENGINEER IN THE FIELD. STAGE 3: OPERATE NEW SIGNAL SYSTEM WITH TEMPORARY MODIFICATIONS 70 INSTALL LEFT TURN VEHICLE SIGNAL HEAD (RED ARROW, YELLOW ARROW, GREEN ARROW) IN TEMPORARY LOCATION. ALIGN SIGNAL TO ACCOMMODATE TEMPORARY CHANNELIZATION (NOT SHOWN IN HEAD WITH CENTER OF APPROACH LANE. IF MAST ARM DOES NOT HAVE AVAILABLE TENON, USE ARM MOUNT 'TYPE N' PER WSDOT CONSTRUCTION SIGNALIZATION PLANS). COORDINATE SIGNAL HEAD STANDARD PLAN J-75.20-00. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. TEMPORARY LOCATIONS SHALL BE PLACEMENT WITH THE ENGINEER IN THE FILED. AT THE END OF THIS APPROVED BY ENGINEER IN THE FIELD. FOR FINAL SIGNAL HEAD CONFIGURATION, SEE SIGNAL PLANS. STAGE MODIFY TEMPORARY SIGNAL SYSTEM TO FINAL CONFIGURATION AS ® INSTALL THROUGH MOVEMENT VEHICLE SIGNAL HEAD (CIRCULAR RED, CIRCULAR YELLOW, CIRCULAR GREEN) IN TEMPORARY LOCATION. SHOWN ON SIGNAL PLANS. ALIGN SIGNAL HEAD WITH CENTER OF APPROACH LANE. IF MAST ARM DOES NOT HAVE AVAILABLE TENON, USE ARM MOUNT 'TYPE N' PER WSDOT STANDARD PLAN J-75.20-00. PROVIDE ADDITIONAL 5C WIRING TO TERMINAL CABINET AS NEEDED. TEMPORARY LOCATIONS SHALL BE APPROVED BY ENGINEER IN THE FIELD, FOR FINAL SIGNAL HEAD CONFIGURATION, SEE SIGNAL PLANS. 12 FOR INSTALLATION AND LOCATION OF SIGNAL POLE, SEE SIGNAL PLANS. 13 FURNISH AND INSTALL VIDEO DETECTION CAMERA SYSTEM IN EXISTING TRAFFIC CONTROLLER CABINET WHILE EXISTING SIGNAL SYSTEM REMAINS IN OPERATION. UPON DEACTIVATION OF EXISTING SIGNAL SYSTEM, RELOCATE VIDEO DETECTION CAMERA SYSTEM TO NEW TRAFFIC CONTROLLER CABINET. COORDINATE WORK WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT. 0 5 10 20 40 60 16 PROVIDE OPENING IN CONSTRUCTION BARRIER FOR PEDESTRIAN ACCESS TO PEDESTRIAN PATHWAYS AND PUSH BUTTONS. SCALE IN FEET 18 APPROXIMATE LOCATION OF POWER SOURCE FOR EXISTING SIGNAL SYSTEM. SHOWN FOR REFERENCE ONLY. VERIFY LOCATION WITH CITY OF RENTON TRANSPORTATION MAINTENANCE DEPARTMENT. 19 PROTECT PROPOSED SIGNAL EQUIPMENT LOCATED WITHIN THE TRAVEL LANE WITH CONSTRUCTION BARRIER DURING CONSTRUCTION. PROVIDE OPENING IN CONSTRUCTION BARRIER FOR PEDESTRIAN ACCESS TO PEDESTRIAN PATHWAYS AND PUSH BUTTONS. STAGE 1 TEMPORARY SIGNAL PLAN "k--now—J q VE S EXISTING OR NEW TRAFFIC SIGNAL SYSTEMS SHALL REMAIN FULLY OPERATIONAL DURING CONSTRUCTION. INTERSECTION SIGNAL MODIFICATIONS SHALL BE DONE AT NIGHT. UNIFORMED POLICE OFFICER SHALL DIRECT TRAFFIC DURING THE CHANGEOVER. RAINIER S 1 GENERAL NOTES 1. CONTRACTOR SHALL PROVIDE PEDESTRIAN ACCESS TO PUSH BUTTONS DURING CONSTRUCTION. EASE OF ACCESS SHALL MEET OR EXCEED CURRENT CONDITIONS. 2. CONTRACTOR SHALL COORDINATE ALIGNMENT OF EXISTING AND TEMPORARY SIGNAL HEADS WITH CITY OF RENTON SIGNAL TECHNICIAN IN THE FIELD. FOR FINAL SIGNAL HEAD ASSIGNMENTS AND PHASING DIAGRAM, SEE SIGNAL PLANS. 3. CONTRACTOR SHALL PROTECT SIGNAL CONTROLLER CABINET AND ALL ASSOCIATED CONDUIT/WIRING DURING CONSTRUCTION. 4. TEMPORARY SIGNAL HEAD INSTALLATIONS SHALL BE INSTALLED SUCH THAT NO PERMANENT MODIFICATIONS ARE MADE TO THE PERMANENT SIGNAL EQUIPMENT. WIRING SHALL BE ACCESSED THROUGH HANDHOLES. DRILLING THROUGH SIGNAL POLE OR MAST ARM IS NOT ALLOWED. 5. TEMPORARY VIDEO DETECTION CAMERA SYSTEMS SHALL. BE FURNISHED AND INSTALLED FOR ALL APPROACHES BY THE CONTRACTOR. 6. SIGNAL CONTROLLER MODIFICATION SHALL BE PERFORMED IN THE PRESENCE OF CITY OF RENTON SIGNAL TECHNICIANS. 7. FOR CONDUIT/WIRING, SEE SIGNAL PLANS. 8. FOR CONSTRUCTION PHASING, SEE CONSTRUCTION CHANNELIZATION PLANS. 9. COORDINATE NIGHT WORK WITH CITY OF RENTON TRAFFIC SIGNAL TECHNICIAN 10. TEMPORARY INTERCONNECT WIRELESS RADIOS AND PTZ CAMERAS WILL BE INSTALLED BY CITY OF RENTON SIGNAL TECHNICIANS. RAiAll ER A \ \ y � m T=141fl A CIO STAGE 2 TEMPORARY SIGNAL PLAN or � cicS �P of WAsq �`� r SURVEYED: KPG DRAWN BY: AMK Kp� '' - CITY OF RENTON RAINIER AVENUES (SR 167) DRAWING NO. 54 R I p � S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 _ ° DESIGN BY: AMK 753 9th Avenue N 2502 Jefferson Avenue "' Public Works Department CHECK BY: JC Seattle, WA 98109 Tacoma, WA 98402 DOCUMENTS TEMPORARY SIGNALIZATION PLANS FED AID NO.-CM0167(048) �o� �F�r�sTr�e ww� PROJ MGR: JF (206�286-1640 (253)6270720 APPROVED FOR CONSTRUCTION DATE: NOV 2011 ��IDNgL E��1 www.kpg,com RAINIER AVE S & S SUNSET BLVD SHEET NO. 54 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DTEMPSIG01.dwg BY: DATE.