HomeMy WebLinkAboutTRO4103430.6 (2)CL C,- w 0 cli Od HIM e j 0 z r v �v ►lf GENERAL JOINT UTILITY TRENCH PLAN NOTES 0 Q 4 5 0 7. NUMBER EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION, THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE FRANCHISE UTILITIES. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR CONVERSION. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE PROPERTY OWNER FROM THE RIGHT-OF-WAY TO EXISTING PRIVATE METERS. KAINIEK VILLAGE j 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174-192. ADJUST THE HORIZONTAL ALIGNMENT AND VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. �7 G IA C11-14-11 SURVEYED: KPG ti WAS OS q� DRAWN BY: SOD o� DESIGN BY: SOD 20320 CHECK BY: JLF � w� s� �EcrsTV- ��� PROJ MGR: JF ��yG REVISION DESCRIPTION BY APP. DATE �SI�NAL FILE: 0655DJUT01.dwg 753 9th Avenue N 2502 Jefferson Avenue Seattle, WA 98109 Tacoma, WA 98402 (206) 286-1640 (253) 627-0720 www.kpg,com M A li r%^ A r% M ^ Iw■ VAULT SCHEDULE SOUTH LAKE CONSTRUCTION NOTES AINSTALL 12" STEEL CASING FOR CONDUITS UNDER WALL FOOTING. SEE WALL 4 PLAN, SHEET 31 AND BORE CASING DETAIL - JUT, SHT 172. JOINT UTILITY TRENCH LEGEND CD I- FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. w w V) 0 LO Q w z J ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN/FROM LEFT CONDUIT OUT/TO RIGHT P10 THREE PHASE J-BOX J16 PSE PSE CONTRACTOR 16p,17p,18p,19p 23p,24p,25p Q10 264 TA #922 CENTURYLINK CENTURYLINK CONTRACTOR 16q,17q 21q,22q,1-4" C9 253 TA - COMCAST COMCAST CONTRACTOR 13c,14c,15c,16c - P11 5106 DEEP VAULT V10 PSE PSE CONTRACTOR 23p 1-4" C10 17"xM' - COMCAST COMCAST CONTRACTOR 19c 18c P12 THREE PHASE J-BOX J17 PSE PSE CONTRACTOR 20p 18p,19p,21p,22p Q24 C11 C-520 PEDESTAL 2436 MEDIUkA nI ITv vA111 T f.l Lju I I rf-,vL. - - CENTURYLINK I ("n►AnACT �.Vlvl�.t�.� I - CENTURYLINK nnk in A(`T VVIVIVN� I CONTRACTOR !�/l\I'r A^T/l Pl -+A UUN I RAU I VAC 18q � loc - 17c P13 TOTAL UNDERGROUND TRANSFORMER V13 PSE PSE CONTRACTOR 21 p- C12 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 15c,16c,17c 20c,21c P14 5106 DEEP VAULT V11 PSE PSE CONTRACTOR 22p - P37 SECONDARY HAND HOLE H10A PSE PSE CONTRACTOR 1-4" - P38 CONNECT TO EX, VAULT J18 PSE - CONTRACTOR 24p,25p 26p,27p,28p,29p Q27 CONNECT TO EX. PEDESTAL - CENTURYLINK CENTURYLINK CONTRACTOR 15q - Q28 264 TA #921 CENTURYLINK CENTURYLINK CONTRACTOR 19q,20q 14q,18q P66 REMOVE VAULT V14 PSE - CONTRACTOR - - P67 REMOVE VAULT V12 PSE - CONTRACTOR - - P68 REMOVE VAULT V15 PSE -- CONTRACTOR - - P94 REMOVE VAULT - PSE - CONTRACTOR - - P95 REMOVE VAULT - PSE _ - CONTRACTOR �- CITY OF RENTON BID Public Works Department DOCUMENTS APPROV -D FOR CONSTRUCTION BY: DATE: T-34301 �9 PLAN 0 5 10 20 40 60 SCALE IN FEET CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 12 EXISTING CONDITIONS 60 SITE PREPARATION & TESC PLAN74 ALIGNMENT PI_.AN 86 _ ALIGNMENT PROFILE 98 DRAINAGE PLANS 109 DRAINAGE PROFILE 119,120 WATER PLAN 137 WATER PROFILE 151 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 185 PROPERTY RESTORATION PLANS 200 CHANNELIZATION & SIGNING PLAN 222 ILLUMINATION PLANS 233 287 IRRIGATION PLAN _ -- -- LANDSCAPE PLAN 299 RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2ND ST JOINT UTILITY TRENCH PLAN STA 29+00 TO STA 33+50 DRAWING NO. 169 ,R`R jE -- T I` Oi i CaJ4�p FED Alger NO.-CM0107�04,9) DATE: NOV 2011 SHEET NO. 169 OF 304