HomeMy WebLinkAboutTRO4103430.6 (2)CL
C,-
w
0
cli
Od
HIM
e
j
0
z
r
v
�v
►lf
GENERAL JOINT UTILITY TRENCH PLAN NOTES
0
Q
4
5
0
7.
NUMBER
EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
THE CONVERSION, THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
GAS, COMCAST, AND CENTURYLINK.
THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
FRANCHISE UTILITIES.
PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
CONVERSION.
THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR
THE CITY OF RENTON.
COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
FOR THEIR CONVERSION.
UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
MADE BY THE FRANCHISE UTILITIES.
UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
PROPERTY OWNER FROM THE RIGHT-OF-WAY TO EXISTING PRIVATE METERS.
KAINIEK VILLAGE j
8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
AND PROFILE SHEETS 174-192. ADJUST THE HORIZONTAL ALIGNMENT AND
VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192.
9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
STRUCTURES NO LONGER IN USE.
10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
DESIGN.
11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
�7 G IA C11-14-11 SURVEYED: KPG
ti
WAS OS q� DRAWN BY: SOD
o� DESIGN BY: SOD
20320
CHECK BY: JLF
� w�
s� �EcrsTV- ��� PROJ MGR: JF
��yG
REVISION DESCRIPTION BY APP. DATE �SI�NAL FILE: 0655DJUT01.dwg
753 9th Avenue N 2502 Jefferson Avenue
Seattle, WA 98109 Tacoma, WA 98402
(206) 286-1640 (253) 627-0720
www.kpg,com
M A li r%^ A r% M ^ Iw■
VAULT SCHEDULE
SOUTH LAKE
CONSTRUCTION NOTES
AINSTALL 12" STEEL CASING FOR CONDUITS
UNDER WALL FOOTING. SEE WALL 4 PLAN, SHEET 31 AND
BORE CASING DETAIL - JUT, SHT 172.
JOINT UTILITY TRENCH LEGEND
CD
I- FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164.
w
w
V)
0
LO
Q
w
z
J
ID
VAULT
FRANCHISE
UTILITY ID
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT IN/FROM
LEFT
CONDUIT OUT/TO
RIGHT
P10
THREE PHASE J-BOX
J16
PSE
PSE
CONTRACTOR
16p,17p,18p,19p
23p,24p,25p
Q10
264 TA
#922
CENTURYLINK
CENTURYLINK
CONTRACTOR
16q,17q
21q,22q,1-4"
C9
253 TA
-
COMCAST
COMCAST
CONTRACTOR
13c,14c,15c,16c
-
P11
5106 DEEP VAULT
V10
PSE
PSE
CONTRACTOR
23p
1-4"
C10
17"xM'
-
COMCAST
COMCAST
CONTRACTOR
19c
18c
P12
THREE PHASE J-BOX
J17
PSE
PSE
CONTRACTOR
20p
18p,19p,21p,22p
Q24
C11
C-520 PEDESTAL
2436 MEDIUkA nI ITv vA111 T
f.l Lju I I rf-,vL.
-
-
CENTURYLINK
I ("n►AnACT
�.Vlvl�.t�.� I
-
CENTURYLINK
nnk in A(`T
VVIVIVN� I
CONTRACTOR
!�/l\I'r A^T/l Pl -+A
UUN I RAU I VAC
18q
�
loc
-
17c
P13
TOTAL UNDERGROUND
TRANSFORMER
V13
PSE
PSE
CONTRACTOR
21 p-
C12
2436 MEDIUM DUTY VAULT
-
COMCAST
COMCAST
CONTRACTOR
15c,16c,17c
20c,21c
P14
5106 DEEP VAULT
V11
PSE
PSE
CONTRACTOR
22p
-
P37
SECONDARY HAND HOLE
H10A
PSE
PSE
CONTRACTOR
1-4"
-
P38
CONNECT TO EX, VAULT
J18
PSE
-
CONTRACTOR
24p,25p
26p,27p,28p,29p
Q27
CONNECT TO EX. PEDESTAL
-
CENTURYLINK
CENTURYLINK
CONTRACTOR
15q
-
Q28
264 TA
#921
CENTURYLINK
CENTURYLINK
CONTRACTOR
19q,20q
14q,18q
P66
REMOVE VAULT
V14
PSE
-
CONTRACTOR
-
-
P67
REMOVE VAULT
V12
PSE
-
CONTRACTOR
-
-
P68
REMOVE VAULT
V15
PSE
--
CONTRACTOR
-
-
P94
REMOVE VAULT
-
PSE
-
CONTRACTOR
-
-
P95
REMOVE VAULT
-
PSE _
-
CONTRACTOR
�- CITY OF RENTON
BID
Public Works Department
DOCUMENTS APPROV -D FOR CONSTRUCTION
BY: DATE:
T-34301 �9
PLAN
0 5 10 20 40 60
SCALE IN FEET
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
12
EXISTING CONDITIONS
60
SITE PREPARATION & TESC PLAN74
ALIGNMENT PI_.AN
86
_
ALIGNMENT PROFILE
98
DRAINAGE PLANS
109
DRAINAGE PROFILE
119,120
WATER PLAN
137
WATER PROFILE
151
JOINT UTILITY TRENCH PLAN
-
JOINT UTILITY TRENCH PROFILES
185
PROPERTY RESTORATION PLANS
200
CHANNELIZATION & SIGNING PLAN
222
ILLUMINATION PLANS
233
287
IRRIGATION PLAN _ -- --
LANDSCAPE PLAN
299
RAINIER AVENUE S (SR 167)
S GRADY WAY TO S 2ND ST
JOINT UTILITY TRENCH PLAN
STA 29+00 TO STA 33+50
DRAWING NO. 169
,R`R jE -- T I` Oi i CaJ4�p
FED Alger NO.-CM0107�04,9)
DATE: NOV 2011
SHEET NO. 169 OF 304