Loading...
HomeMy WebLinkAboutTRO4103430.7 (2)1 9 A I I I -1P 0% A 1 1 rm W& a a 1 0-- VIAUL I 0%.#1111CUULC 4 ID VAULT FRANCHISE OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN/FROM CONDUIT OUT/TO UTILITY ID LEFT RIGHT P15 TOTAL UNDERGROUND TRANSFORMER V1 6 PSE PSE CONTRACTOR 30P 31 p, 32p Q11 264 TA #923 CENTURYLINK CENTURYLINK CONTRACTOR 21 q,22q,23q 24q,25q C13 17"x30" — COMCAST COMCAST CONTRACTOR — 22c P16 THREE PHASE J—BOX J21 PSE PSE CONTRACTOR 26p,27p,32p 33p, 34p, 35p, 1 — 4" Q20 C-330 PEDESTAL CENTURYLINK CENTURYLINK CONTRACTOR 1-4'y C14 253 TA COMCAST COMCAST CONTRACTOR 22c,23c,24c 25c,26c,27c P17 REPLACE EX VAULT WITH THREE PHASE J—BOX J19 PSE PSE CONTRACTOR 2-41P 28p,29p Q25 CONNECT TO EX. SERVICE WIRE BOX CENTURYLINK CONTRACTOR 23q C15 2436 MEDIUM DUTY VAULT COMCAST COMCAST CONTRACTOR 25c,26c.27C 28c,29c C16 253 TA COMCAST COMCAST CONTRACTOR 20c,21 c 23c,24c P39 SECONDARY HAND HOLE H16A PSE PSE CONTRACTOR 30p P23 SECONDARY HAND HOLE H16B PSE PSE CONTRACTOR 31p ID VAULT FRANCHISE OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN/FROM CONDUIT OUT/TO UTILITY ID LEFT RIGHT P52 INTERCEPT POINT IP08 PSE PSE CONTRACTOR 2-4$) Cl 7 2436 MEDIUM DUTY VAULT COMCAST COMCAST CONTRACTOR 28c,29c 30c, 31 c P69 REMOVE VAULT PSE CONTRACTOR P70 REMOVE VAULT PSE CONTRACTOR P71 REMOVE VAULT PSE CONTRACTOR P72 REMOVE VAULT J20 PSE CONTRACTOR Q29 REMOVE VAULT CENTURYLINK CONTRACTOR JACK IN THE BOX 8 14 3) POWER SPORTS 15 -------------------- 16 C14 2 Q11 — — — — — — — — — — — — — L 1 ------------ —G4'— — _7 /G5 _G3- — U _JTN JT i 7 - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — LLJ Ld LLJ + 2 3 + CIO CD CD 4 C14 36 35 J/ 00 + 00 r1r) Cn cl; I i j 02 I G2 I Cn I Uj CIL 3L am\ i i I I � UGP RAINIER AVE S MiL--_j L------_------------------------------ ----------------- --------------------------------------- CD P71 C, UGP _ F J GP GP UGP u0p UGP UGP.UGP c3p CN UC UCIP— UGP�L_ ucip— LIUS �.--T— UGF ULjf ?5: _y L_ — -J L FD D Ln LC) — — — — — — — -- Q0 — — — — — — — — — — — — — — — — — -- — — — — — — — — — — — — — — — — — — — — — — — — — — — r C� C) - — — — — — — — — — — — — — — — — — — — — 00 C� 0 8 McLENDON HARDWARE Sm �71 j > 5 < ry C11 6 L) Lrj C-0 - I 0 11-14-11 SURVEYED: KPG Ld '�k G 1A CO KPH WAs DRAWN BY: SOD CITY OF RENTON �10 DESIGN BY: SOD BID 753 9th Avenue N 2502 Jefferson Avenue Public Works Department CHECK BY: JLF Seattle, WA 98109 Tacoma, WA 98402 ck� 20320 QISTf� PROD MGR.- JF DOCUMENTS APPROV FOR CONSTRUCTION V (206) 286-1640 (253)627-0720 ANAL www,kpg,com V_ NUMBER REVISION REVISION DESCRIPTION BY APP. DATE FILE: 0655DJUT0I.dwg I BY: DATE: --- -- - ---- GENERAL JOINT UTILITY GENERAL PLAN NOTES 1. SEE GENERAL JOINT UTILITY PLAN NOTES ON NEXT SHEET. CONSTRUCTION NOTES Z�4" DIAMETER CONDUIT—CENTURYLINK (2 CONDUIT) A3" DIAMETER CONDUIT—COMCAST (2 CONDUIT) 14 4" DIAMETER CONDUIT—PSE POWER (3 CONDUIT) ABEGIN INSTALLATION OF 6" DIAMETER CONDUIT—PSE GAS — APPROXIMATE STA 33+98, LT A6" DIAMETER CONDUIT—PSE GAS (1 CONDUIT) JOINT UTILITY TRENCH LEGEND FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. 0 5 10 20 40 60 SCALE IN FEET CALL 2 DAYS BEFORE YOU DIG 1-800-424-5555 T-3430110 CATEGORY. SHEET RIGHT OF WAY PLANS 13 EXISTING CONDITIONS 61 SITE PREPARATION & TESC PLAN 75 ALIGNMENT PLAN 87 ALIGNMENT PROFILE 99 DRAINAGE PLANS 110 DRAINAGE PROFILE 120,121 WATER PLAN 138 WATER PROFILE 152 —JOINT UTILITY- TRENCH PLAN — JOINT UTILITY TRENCH PROFILES 186 PROPERTY RESTORATION PLANS CHANNELIZATION & SIGNING PLAN 223_ ILLUMINATION PLANS 234 IRRIGATION PLAN L LANDSCAPE PLAN 288 UU RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2ND ST JOINT UTILITY TRENCH PLAN STA 33+50 TO STA 38+00 DRAWING NO. 170 PROJECT NO, TED403430 FED AID NO. -QM0167(L048) DATE: NOV 2011 SHEET NO. 170 OF 304