HomeMy WebLinkAboutTRO4103430.9 (2)GENERAL JOINT UTILITY TRENCH PLAN NOTES
G:a
�J
CD
0
0
Ln
Ln
0
0
Lr''
z
0
z
L�
ch�
i
U
Ld
0
01
a_
Od-
w
w
C'n
76 GAS STATION
ID
P20
VAULT
; THREE PHASE J.--BOX �
FRANCHISE UTILITY ID
J22
OWNED BY
I PSE
PROVIDED BY
PSE
INSTALLED BY
CONTRACTOR
CONDUIT IN/FROM LEFT
44p,45p
CONDUIT OUT/TO RIGHT
36p,37p,38p,39p,1-4"
Q12
1 264 TA
#924
CENTURYLINK
CENTURYLINK
CONTRACTOR
24q,25q,26q
27q,28q,29q,30q
C19
2436 MEDIUM DUTY VAULT
—
COMCAST
COMCAST
CONTRACTOR
32c,33c
34c,35c,36c,37c,38c
P21
3 PHASE TRANSFORMER
V21
PSE
PSE
CONTRACTOR
36p,37p
—
Q22
C-330 PEDESTAL
—
CENTURYLINK
CENTURYLINK
CONTRACTOR
27q
—
C20
17%30"
—
COMCAST
COMCAST
CONTRACTOR
36c
—
Q23
CONNECT TO EX. SERVICE WIRE BOX
—
CENTURYLINK
—
CONTRACTOR
28q
—
C21
17" x30"
—
COMCAST
COMCAST
CONTRACTOR
—
39c
C22
253 TA
—
COMCAST
COMCAST
CONTRACTOR
37c,38c,39c
40c,41 c
C23
17%30"
—
COMCAST
COMCAST
CONTRACTOR
34c,35c
—
P40
INTERCEPT POINT
IP09
PSE
—
CONTRACTOR
1-4"
—
P75
REMOVE VAULT
V22
PSE
—
CONTRACTOR
—
—
P76
REMOVE VAULT
V20A
PSE
—
CONTRACTOR
—
—
Q32
REMOVE VAULT
—
CENTURYLINK
—
CONTRACTOR
—
—
03
REMOVE VAULT
—
CENTURYLINK
—
CONTRACTOR
—
—
2.
0 5 10 20 40 60
SCALE IN FEET
CONSTRUCTION NOTES
A3" DIAMETER CONDUIT—COMCAST (7 CONDUIT)
JOINT UTILITY TRENCH LEGEND
FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164.
WALL FOOTING
SEE WALL PLANS, PROFILES
& DETAILS, SHTS 28-35.
3" COMCAST CONDUIT
BORE SPACER
STEEL BULKHEAD
(TYP. BOTH ENDS
OF CASING)
BORE SPACER (TYP)
STEEL CASING WITH 0.25" WALL THICKNESS
SECTION A —A
NITS
NOTES:
1. EXTEND STEEL CASING 4.5' FROM FRONT FACE AND BACK FACE OF
WALL OR WALL FOOTING, WHICHEVER IS GREATER.
STEEL CASING FOR JOINT UTILITY TRENCH DETAIL
NTS
3.
.19
a
7.
91
m
EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
ALIGNMENT TO THE LIMITS S s0'WN. CONTRACTOF� SHALL PRa:F `1DE Ati.. 'us'=:SvR'p
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDINo. BACKFILL
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
GAS, COMCAST, AND CENTURYLINK.
THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
FRANCHISE UTILITIES.
PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
CONVERSION.
THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR
THE CITY OF RENTON.
COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
FOR THEIR CONVERSION.
UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
MADE BY THE FRANCHISE UTILITIES.
UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
PROPERTY OWNER FROM THE RIGHT-OF-WAY TO EXISTING PRIVATE METERS.
CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
AND PROFILE SHEETS 174-192. ADJUST THE HORIZONTAL ALIGNMENT AND
VERTICAL PROFILE AS NECESSAR �" A"'v '1D C�.NwI I� T'` ��`iTI~ Fd ICTINI G AND, 1 .5 ,P. s �i� Lii s v .�
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAIN T AINING MINIMIJiM
COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
TRENCH '`;EPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192.
CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL.
EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
STRUCTURES NO LONGER IN USE.
INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
DESIGN.
11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
12" DIP, STEEL CASING
2 — 3" COMCAST CONDUIT
SEE JOINT UTILITY TRENCH
PLANS SHEET 169
T 3430112
RIGHT OF WAY PLANS
T—,-5
EXISTING CONDITIONS
63
SITE PREPARATION & TESC PLAN
77
ALIGNMENT PLAN
89
ALIGNMENT PROFILE
101
DRAINAGE PLANS
112
DRAINAGE PROFILE
123
WATER PLAN
140
WATER PROFILE
j 154
JOINT UTILITY TRENCH PLAN
—
JOINT UTILITY TRENCH PROFILES
188
PROPERTY RESTORATION PLANS
203
CHANNELIZATION & SIGNING PLAN
225
ILLUMINATION PLANS
236
IRRIGATION PLAN
290
LANDSCAPE_ PLAN
302 1
11-14-11
osti4� GWAk°�y
ti
20 20�o �w
�
NAL
SURVEYED: KPG
DRAWN BY: SOD
DESIGN BY: SOD
CHECK BY: JLF
PROJ MGR: JF
FILE: 0655DJUT01.dwg
K��
BID
753 9th Avenue N 2502 Jefferson Avenue
Seattle, WA98109 Tacoma, WA98402 DOCUMENTS
(206) 286.1640 (253) 627-0720
www.kpg,com
f' RAINIER AVENUE S (S R 1 67)
41,104 �- CITY OF RENTON
•� S G RADY WAY TO S 2N D ST
Public Works Department
JOINT UTILITY TRENCH PLAN
APPROV D FOR CONSTRUCTION
BY: DATE: i 2G1-� STA 42+00 TO STA 45+00
DRAWING NO. i
—
PROJECT NO. TED403430
FF.l AID) NO -C 10,016_; =048
DATE: NOV 2011
SHEET NO. 172 OF 304
NUMBER
REVISION DESCRIPTION
BY
APP.
DATE