Loading...
HomeMy WebLinkAboutSWP2703440.7Q qt q" Cf) tV a 1 i 70 a 0 Cc 0 Q a i a Q U 0 U 0 i 0 Q i .y a U 0 0 0 U r i m N a i O U w 01 0 U a X 6 0 ca 0 4 co O N m m D D 3 V) k: 0 q FIELD TRIM STEEL PILE AT TOP OF WALL FINISH COAT EXPOSED AREAS OF STEEL PILE EXTRA SLOPED REBAR AT TOP OF WALL SEE EXTRA REBAR DETAIL ,\ _RRE�M�O�VNE EXPOS NG ExCAVATEO SOIL FOR LAGGING — STEEL PILE BORED HOLE --♦ TOP OF WALL EL VARIES SEE ELEVATIONS JA TYP WALER TO 3/8 STEEL PILE TYP PIPE BRACE i4 TO WALER T i-2*\-UPPER PIPE BRACE T � A L_ * 4 MIN SHAFT DIA TIMBER LAGGING Flu. w/caNCRETE TO TOP OF FLANGE SLOPE TO DRAIN, TYP LOWER PIPE BRACE CONCRETE FACING 3" SCH 40 WEEP HOLE Q BOT OF FACING SECTION A TYPICAL SOLDIER PILE SECTION S� SCALE: 3/4"=1'-D' PILE CENTERED IN HOLE, SEE PILE SCHEDULE FOR REQ'O SECTION v A PILE CENTERED IN HOLE, SEE PILE SCHEDULE FOR REQ'0 SECTION -� Ui CD #5@ 12 HORZ U_ LEAN CONCRETE SHAFT BACKFILL FILL VOIDS BEHIND LAGGING W/SAND - TIMBER LAGGING (TREATED) - PREFABRICATED DRAINAGE MAT 4 4 a d-j 4 d Qa 7/8x6 HEADED STUD #6012 0 12" VERT SPACING, #5012 HORZ TYP VERT rig SECTION B TYPICAL SOLDIER PLE SECTION S� EAST AND WEST SIDE WALLS SCALE: 3/4'=1'-0' LEAN CONCRETE SHAFT BACKFILL 15024 VERT f a° #6012 #�12 HORZ VERT 7/8x8 HEADED STUD ® 12" VERT SPACING, TYP FILL VOIDS BEHIND LAGGING W/SAND TIMBER LAGGING (TREATED) — PREFABRICATED DRAINAGE MAT SECTION rc TYPICAL SOLDIER PILE SECTION S1 END WALL SCALE: 3/4"=1'-D" a 100% SUBMITTAL NO. REVISION 2" MINIMUM BEARING WIDTH FOR LAGGING TO STEEL — REMOVED PILE CONCRETE FOR LAGGING WEB TO FLANGE 3/g FLANGE TO >,,l FLANGE a° CONTINUOUS 1 /4- BENT PL TO SUPPORT LAGGING SHOP WELD TO STEEL PILE - CONCRETE FACING LAGGING SCAM AS SHOWN oNe ria+ Az IFw owe ram St" A00WM 0LY )US 1/4" BENT PL ORT LAGGING, ID TO STEEL PILE D ETAI L 2 CORNER S � SCALE: 3/4'=1'-D" 1 3/4'=1'-O" 6R5 Scale DATUM 0 1 2 3 iiia Feet O) TY OF R EN TON Planning/Building/Public Works Dept, W12 OR W18 WALERS LAGG NG PAP, vQ L&IIIINCI. i. DETAIL � CORNER S1 SCALE: 3/4"=1'-0" GENERAL NOTES 1. ALL PILES, WALERS AND BRACES EXCEPT TEMPORARY BRACING NOT REMAINING AND CROSS BRACING SHALL BE PAINTED. ALL STEEL SHALL BE SHOP PRIME COATED. PILES SHALL BE PRIME COATED ONLY EXCEPT EXPOSED AREAS IN THE FINAL CONFIGURATION SHALL ALSO RECEIVE 2ND AND 3R0 COATS. WALERS AND PIPE BRACES SHALL RECEIVE PRIME, 2ND AND 3RD COATS. AREAS OF WALERS WHICH WILL BE EMBEDDED IN THE CONCRETE FACIA SHALL RECEIVE FINAL PAINTING PRIOR TO FACIA PLACEMENT. 2. TIMBER LAGGING SHALL BE TREATED, HEM -FIR #1. LAGGING FOR END WALL SHALL BE 6X MEMBERS, LAGGING FOR SIDE WALLS SHALL BE 4X MEMBERS. 3. HEADED STUDS SHALL BE NELSON 53L SHEAR CONNECTORS OR EQUAL. STUDS SHALL BE WELDED TO PILES USING STUD MANUFACATURERS WELDING TOOL TO PROVIDE FULL CAPACITY OF STUD. CONSTRUCTION NOTES O1 CONTRACTOR FIELD VERITY LOCATION OF EXISTING CULVERT TO AVOID INTERFERENCE WITH PILES 4 AND 10. O2 TOP ELEVATION OF PILE IS FOR TEMPORARY CONDITION FOR LAGGING AND TEMPORARY STRUCTURAL STABILITY. 3O TEMPORARY BRACE SHALL REMAIN IN PLACE UNTIL CONCRETE FACING IS PLACED AND ACHIEVED STRENGTH OF 3000 PSI. O CONTRACTOR MAY WELD A PLATE IN THE LOWER WALER OVER THE EXISTING CULVERT TO "SHOOT" SHOTCRETE AGAINST AS NECESSARY TO ACHIEVE CONSOLIDATION IN THIS AREA, 15 INSTALL W5 TEMPORARY BRACE ANO TOP WALER PRIOR TO EXCAVATING BELOW EL 155. O6 INSTALL BOTTOM WALER PRIOR TO EXCAVATING BELOW EL 147. O7 INSTALL CROSS BRACING AS EXCAVATION PROCEEDS. EXCAVATE A MAXIMUM OF 2' BELOW BOTTOM OF INDIVIDUAL CROSS BRACING MEMBERS BEFORE INSTALLING THE CROSS BRACING. OB CROSS BRACING ELEVATION INDICATES IN'fERSECiION OF PILE CENTERLINE AND CROSS BRACING CENTERLINE O9 INSTALL WEEP HOLE PIPE BY CAREFULLY CUTTING THROUGH DIMPLED BACKING BUT NOT CUTTING FILTER FABRIC MATERIAL. INSTALL WEEP HOLE PIPE THROUGH CUT HOLE AND SEAL HOLE WITH DUCT TAPE TO PREVENT INTRUSION OF CONCRETE CARR ROAD - PANTHER CREEK 8/19/08 EMERGENCY CULVERT REPAIR PROJECT STRUCTURAL DETAILS 52 7 =8 ne�o�nn�