Loading...
HomeMy WebLinkAboutTED4003446.200 W a Er W < 4 U 0 W x X M � N U o I z 00 M 0 8 o w d y Z cV U �z O _ O - Ld W a_zc�z zwzQ �oQzw U Z m Z L'J w o m n- W Q Q J W Ym�� W < o III V) z Q _z U � Q m C� O O z PRIVATE ROOF DRAIN NOTE ALL PRIVATE STORM DRAINAGE ROOF DRAINAGE CONVEYANCE PIPE SHALL BE A 6"0 SDR35 D3034 WHITE PVC PIPE, PLACED AT A MINIMUM SLOPE OF 0.50%. IF THE SIZE OF THE PIPE IS INCREASED THE DIAMETER OF THE PIPE WILL BE SHOWN ON THE PIPE WITHIN THE PLANS. LOT BMP APPLICATION NOTES 1. CONNECTION OF THE INDIVIDUAL SINGLE-FAMILY STRUCTURES TO THE PRIVATE DOWNSTREAM DRAINAGE SYSTEM SHALL BE VIA PERFORATED PIPE CONNECTION. 2. FLOW CONTROL BMPS CONSTRUCTED ON EACH LOT SHALL BE OPERATED, MAINTAINED AND KEPT IN GOOD REPAIR BY EACH LOT OWNER. 3. COMPLIANCE WITH THE BMP REQUIREMENT ON THE LOTS WILL BE ADDRESSED IN THE DRAINAGE PLAN SUBMITTED FOR RESIDENTIAL BUILDING PERMIT DRAINAGE REVIEW WHEN APPLICATION IS MADE FOR A SINGLE FAMILY RESIDENTIAL BUILDING PERMIT FOR EACH LOT, NOTE FOR A STREET CROSS SECTION VIEW OF HOQUTAM AVENUE NE, SEE SHEET C-14. OVERLAY NOTE THE FINISHED GRADE CL OF ROW GRADES INCORPORATE A 1 1 /2" ASPHALT OVERLAY OVER EXISTING. MAINTAIN A 2.00% CROSS SLOPE PER SECTION. SS ASBUILT NOTE: FOR SANITARY SEWER ASBUILT INFORMATION SEE SHEETS C-15 THRU C-19. SD STUB ASBUILT NOTE: SD ROOF DRAIN STUB INVERTS ARE PLACED NEAR THE END OF THE ASBUILT STUB. THE INVERT ELEVATIONS WHERE PROVIDED BY THE CONTRACTOR AND THE LOCATIONS OF THE STUBS WHERE FIELD LOCATED BY SURVEY. VERTICAL DATUM CITY OF RENTON, NAVD 88 BENCHMARK BECLAN IAKA BECLAN PLACE] - MINOR AMENDMENT A PORTION OF THE NW 1/4 OF THE NE %4 OF SEC. 15, TWP. 23N., RGE, 5E., W.M. � CITY OF RENTON, KING COUNTY, WASHINGTON BARRIER FREE CURB CU' SEE DETAIL SHEET C-13 INT'X STA:6+65.60 NE 2ND ST. = STA:23+15.39 HOOUTAM AVE NE CITY OF RENTON BENCHMARK #2104. 1" IP W/PLUG & TACK DOWN 0.9' IN CASE LOCATED AT THE INTERSECTION OF SE 136TH ST. AND 144TH AVENUE SE. ELEV.=399.340 FEET (121.719 METERS) CB 9 TYPE 2 48"0 STA: 27+26.97, 45.52 RT INT'X STA: 1+00 NE 2ND PLACE _ STA: 27+42.07 HOQUTAM AVENUE NE 0 G 1"=40' ...... C..- Ln ": 1 ao � z I CENTERLINE OF FUTURE, R.O.W � WEST COAST IMPROVEMENTS CD ^ HIGH POINT I#LEV = 4 7.46 :w 1...... ......;. ¢I. .......... ....424 AD I � HIGH POINT StA=.26+86.24 ° N 27+0zPVSTA Q Nw .w� I '. 424 m > LEV = 41 o o 422: _... __ ........ w { PVA U.- -3.658 ........_ 22 ... . € K - 27.41 � N .} I II jj > - 12 E cn W r7 Co 420 , ........ ..... ..... 420 Q i I ' cnw 418 0 .... . I I ............................n w 418 ........ . ; Q _ 1.14% o 1,31% 0.64%: 416 +oM_ Mc 416 N o `n> II� � 0.7 55LF 12"0 CEP S55 ...... 414414 ¢ 39LF12"0 CPEP x SD-._ Z ` : W OL 0.59x ! 0.38�6 4121..... 6 `D�° 162LF 12"0 CPEP SD O 9° .. ...... ..... 412 410 8LF 12"0 CPEP A1g� I 1410 ... ... _.. SDI ®�999►r 2.56% 6131• 217 LF 8 0; SS 14.38% 408 _ 3, 2.................. ..... ............................I ........ 08 Q S� CB 10A TYPE 2' 48"0 } 4 STA: 26+55.00, i18.22' RIT 406 1`L ....... RIM= _ 416.69-418.82 F SSMH 5, TYPIIt 1 48'W I " 406 S IE= 4-12 0 IN (N) 410.97 I TA: 25+20.26, 15.00' RT 4}fi-�}-12"0 ........., ....... RIM= 41 .7 SOLID ! OCKI IE= UT (S) 410.97 404 5 6 _ w,/ N G ,LID I ......... _ _I404 f IE _ 407.74 8"0 IN (N) ® IE = 407.64 8 0 OUT (S) CB E 2 48*0 402 STA: 27+29.97 45.72' _RT � I402 STA: 24+93.OQ, 19.22 RT CBRA. TYPE 48"0 : I RIM 4�}8.19 "17.56 I 0 CB 0, TYPE 1 = 4 .....!.. RIM= 414 14.4. 5.1.1 � IE " STA: 27+10.44 20.60 RT = 1412.76 8'0 IN (SE) 400 1 RIM= RTCi7T 417.05 fE= 41112"0 IN (E) 14fifi:5t 400 CB TYPE 2 8"0 ! IE= 934 12R0 IN (N)410.01 IE- 411.40 12'0 IN (E IE= 411.67 12 0 OUT (SW) ! 411.51 STA: 23+55.64, 19.54' RT IE= 410.44. 6 0 IN (E)', 412.36 = THRU_ CURB _ FRAME & GRATE __ IE= 411.40 1210 OUT ) 398 If 4Ei994 12 flUT 5 41001. 398 RIM= 408.19 408.16 O I SSMH 1, TYPE'(1 48"0 53 LF 80 IE= 401.40 12"0' IN N 401.61 STA: 2 +36.78' 15.00' T _®._0.50% 396 -. ...._._ IE= 401 49 W"_0,_0UT (0 4014 __ __.__ _.-- I - GKIN�.-�119 - ___ 96 d 3 I SSMH 5A TYPE 1 48"0 ! IE= 401.61 1200 IN (S) € IE = 4b8.92 8"0 IN (F. i STA:: 23+33.25, 15.00' RT i IE = 408.82 8" OUT ( ) 394 ' 4 RIM . ,407.80,w SOLI{.LOCKIIC�; LID IF =:396.05 :8"0 IN (N) 384 - _- _ STA: 23+45.98, 21.40 RT I € 1 �TAb,.03,27 3,5' THRU CURB FRAME & GRATE f I 3821-.._.. IE t f395. 8 8 0 IN N IE- 12 43 ___.___._ ..._ _ _ O - O IN (N)402.76HOO.UTAM AVE�NU� N P O ILA I E I " ho 1.._._. �f - 68 " SCALE 1" = 401 HORZ 380 _ _ _ _ 80 3 4DROP, co ao .a �n In o: � 00. 1 ( VERT,� ^ r�`•, cv' RECHANNEL MANHOLE N: Ir7, ram: oo: rnl 04 qd- Ln yj I ME. -I GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) I inch = 40 ft. STORM DRAINAGE PIPE TABLE 5A 8 LF 12"0 CPEP ® !S.%% 14.38% @9 137 LF 12 0 CPEP O 6.23% 6.13% 9A 55 LF 12"0 CPEP ® 8.559f.- 0.78% 10A 162 LF 12"0 CPEP ® 9.42% 0.59% 29 1 OB Se- LF 12"0 CPEP ®$55% 0.38% CURB RETURN TABLE CURB NO, STATION E ELEV. CURVE DATA 1+41.80 414.46 417.52 A/4 41 �.-? 417.25 R=25.00' *06'17"' ( 1 ) A/2 A 1TI7-92 417.11 A--91 v A 3/4 +16.95 417.04 L=39.75' Tan=25.49' 27+00.20 414-99-416.98 23+55.64 498.16 408.09 R=25.00' A/4 -48%.68 407.63 a=89'08'30"' O A/2 -49�-�El 407.76 L=38.90' A 3/4 494-96 408.03 Tan=24.63' 7+09.8298.2 408.41 1 OF AS +�3222 11 SIONAL o N co cc co co; C6, CI r_z r-z r`i r`, TOP 0r PROPObED RIGHT CURB 3 o3.0(. /3 tf:. I'7 LCJ .n N.M �:� NM �I,� m �IaD �:tD O)I� N:M r'-) d M ��^o �Im CT)i� CV I`rI N °O ^ ... �j �.....-_.._.-_..... ca ri; r;^ o ai o o n'Inj �'',r�i �.� �`� n'� ca.co a (o. I D,� carp colt �E^ ri ^ r� r ` ^ co ca t� 0 0 0 CD: _ E 22+80 23+20 23+60 24+00 24+40 24+80 25+20 25+60 26+00 26+40 26+80 27+20 27+60 CHECKED FOR COMPLIANCE TO CITY STANDARDS Date Date Date 160 JF, A ASSOmns, Fuc CIVL 0 NEW I A PROJECT M MQEME f 1945 SL 375TH STREET BUS.' (25J) 226-4" FEDERAL WAY, WA 90003 bsdree*WAckknet CITY OI RENTON DEPARTMENT OF PUBLIC WORKS BECLAN (AKA BECLAN PLACE) STORM DRAINAGE PLAN AND PROFILE HOQUTAM AVENUE NE - REVISION Q3 CURB RETURN 2 3/4 DELTA ELEVATION BAS BAS 10/10/12 DESIGNED: BAS DATE: 03/01/13 FILE NAME: 12183-C7H 2Q CURB RETURN 2 3/4 DELTA ELEVATION BAS BAS 10/05/12 DRAWN: TAS SCALE: 1" = 40' FIELD BOOK: PAGE: Al HOQUTAM PROFILE REVISION BAS BAS 09/12/12 CHECKED: BAS NO. REVISION BY APPR, DATE APPROVED: DIRECTOR OF PUHUIC WORKS SHEET: C-7H OF: 25 V ' I � � � ) �b o h n 1 � z m N r