Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WWP2703473.45
CMU WALL 16 GA RAIN HOOD GROUT FRAME FULL HOLLOW METAL DOOR DOOR HEAD 3 SCALE: 3"=1'-0" 73 Q I 0 O 00 0 i 0 ch U I Y i 16GA STL. TEE ANCHOR, 2'-0" O.C.- c 0 z 0 CMU WALL 0 z o g i U) c� 0 i Ln c - v N I- 01 GROUT o FRAME FULL — 0 o HOLLOW METAL DOOR i N 00 � DOOR JAMB SCALE: 3"=1'-0" w 0 0 O 00 0 0 0 0 O w Q z w 0 0 CU z 0 Cn L', Em U N c 0 nDOOR SILL 3 -- 1 /4" WD. SHIM SEALANT B & 5/8" GYP BOARD BACKER ROD, BOTH SIDES MTL. FLASHING R-13 BATT INSULATION 1 /4" NEOPRENE COMPRESSED INOT GASKET CAVITY BIRD SCREEN PRESSURE ACOUSTIC LOUVER TREATED 2x3 WOOD STUDS @ 16" O.C., CLIP TO 1/4" NEOPRENE CMU @ 8' GASKET VERTICAL .. I SEALANT B & BACKER ROD, MTL. FLASHING BOTH SIDES U HOLLOW METAL 1 /4" WD. SHIM FRAME CMU WALL PRESSURE TREATED 2x3 WOOD STUDS 16" O.C., CLIP TO CMU ® 8' VERTICAL 0 R-13 BATT INSULATION 0 COMPRESSED INOT CAVITY 5/8" GYP BOARD SEALANT B & fl BACKER ROD HOLLOW METAL FRAME SCALE: 3"=1'-0" N ROTPHI c� r` O c 0 z Roth Hill, LLC Tel 425.869.9448 www.rothhill.com 0 11130 NE 33rd Place, Suite 200 Bellevue, WA 98004 d WE RAME 'HERSTRIP BOTTOM L THRESHOLD SET ZOUT I ACOUSTIC LOUVER SECTION SCALE: 1-1 /2"=1'-0" 1" ROOF RIGID INSULATION PLYWOOD ROOF SHEATHING ALUMINUM FLASHING 5 PREFINISHED GUTTER ALUMINUM CLAAAj_// 2x10 FASCIA RIP 2x8 PERFORATED METAL SOFFIT PANEL 0 5/8" GYP BOARD PRESSURE TREATED 2x3 WOOD STUDS 16" O.C., CLIP TO CMU © 8' VERTICAL PREFINSHED METAL ROOF R-30 BATT INSUL MOISTUREi:: >"�_ BARRIER / CUT TOP CHORD 8 TRUSS EXTENSIO AS REQUIRED 2'-0" EAVES SECTION SCALE: 1-1/2"=1'-0" SPLIT —FACE CMU CONTINUOUS SEALANT BEAD ALUMINUM INSULATION TRIM R-10 RIGID FOUNDATION INSULATION GRADE AS OCCURS TYPICAL CURB SCALE: 1-1 /2"=1'-0" Kennedy/Jenks Consultants 32001 32nd Avenue South, Suite 100 Federal Way, WA 98001 Ph. 253-835-6400 Fax 253-952-3435 SPLIT —FACE CMU M PROVIDE TIE TO BEARING WALL 4"-0" O.C. MAX 5/8" GYP BOARD PRESSURE TREATED 2x3 STUDS 16"O.C. 1 /20 x 6" GALV ANCHORS © 32" O.C. R-13 BATT INSULATION - R-13 BATT INSULATION 5/8" GYP BOARD PRESSURE TREATED 2x3 WOOD STUDS 16" O.C., CLIP TO CMU @ 8' VERTICAL CONTINUOUS SEALANT BEAD L c 3„ a a STARTER CURB 1'-0" - a a a < S=34731 9 a I:I318I11,14 1. MR[CI REVISION 6" 3" 0 1' SCALE: 1 1/2"=1'-0" 0 3" 6" 9" 1' SCALE: 3"=1'-0" SURVEYED: SCALE: XXX VERTICAL: NAVD 1988 T Y O F AS NOTED HORIZONTAL NAD , 983/183/, 99, �► /` DESIGNED: �� }� lJ DJW RENTON DRAWN: DJW RFB /20/12 JMF ONE INCH DATUM CHECKED: WGR AT FULL SCALE Planning/Building/Public Works Dept. IF NOT ONE INCH BY DATE APPR APPROVED: SCALE ACCORDINGLY RECORD DRAWING lese Recora Drawings have been prepared based on information provided T the contractor and others. Kennedy/Jenks Consultants has not verged tt ;curacy or completeness of information provided to them and does not arrant the accuracy or completeness of these Record Drawings. Users of ese Record Drawings assume all risk of loss resulting from their use. STONEGATE LIFT STATION REPLACEMENT CONTROL BUILDING DETAILS 7417 REGISTERED ARCHITECT DANIEL J. WRIGHT STATE OF WASHINGTON 06-1 1-2010 FIELDBOOK: PAGE: DRAWING NO: A3 SHEET: OF: 19 42 H O a y m r~ a � N `O O z wr r y air' 3-3473/9