Loading...
HomeMy WebLinkAboutWWP2703477.4Ch d. n n Lv Q z F- 0 w 0 n_ SA Nl TA R Y SEWER N O TES & SPECI FI CA Tl ON S Sanitary Sewer Notes and Specifications THESE NOTES SHALL APPEAR ON PROJECTS FOR THE SANITARY SEWER UTILITY. 1. All work and work material shall be in conformance with the standards and specifications of the City of Renton Planning/Building/Public Works Department and the latest edition of the WSDOT/APWA Standards and Specifications, as approved and modified by the City of Renton in the Renton Standard Plans & Specifications. A set of approved plans shall be kept on site at all times during construction. 2. The hours of work in the street right of way shall be per City specifications on weekdays unless otherwise approved in writing by the Planning/Building/Public Works Department. An approved traffic control plan must be obtained prior to beginning any work within public right of way. 3. All locations of existing utilities shown are approximate and it shall be the contractor's responsibility to verify the true and correct location so as to avoid damage or disturbance. 4. A pre —construction conference and a 24 hour notice shall be required prior to starting new construction. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. (Inspection will be accomplished by a representative of the City of Renton.) It shall be the contractor's responsibility to notify the Public Works inspector 24 hours in advance of backfilling all construction. 5. Contractor is solely responsible for the means, methods and sequences of construction and for the safety of workers and others on the construction site. 6. It shall be the responsibility of the contractor to obtain street use and any other related permits prior to any construction. 7. Plans approved by the City of Renton, Public Works Department shall take precedence over all other plans.8. A copy of these approved plans must be on the job site whenever construction is in progress. 9. The contractor shall provide the City of Renton with an as —built drawing of the sanitary sewer system, which has been stamped and signed by a licensed professional engineer or licensed professional surveyor. 10. Backfill shall be placed equally on both sides of the pipe in layers with a loose average depth of 6 inches, maximum depth of 8 inches, thoroughly tamping each layer to 95 percent of maximum density. These compacted layers must extend for one pipe diameter on each side of the pipe or to the side of the trench. Materials to complete the fill over pipe shall be the same as described. 11. Open cut road crossings for utility trenches on existing traveled roadway shall be backfilled with crushed rock and mechanically compacted unless otherwise approved by the Public Works inspector. Cuts into the existing asphalt shall be neatline cut with saw in a continuous line. A temporary mix patch must be placed immediately after backfi!I and compaction. A permanent hot mix patch shall be placed within 10 days and shall be per City of Renton current standards. 12. Datum shall be City of Renton, 1988 NAVD. 13. All disturbed areas shall be seeded and mulched or otherwise stabilized 'a the satisfaction of the Department for the prevention of on —site erosion after the completion of construction. 14. All pipe and appurtenances shall be laid on a properly prepared foundation in accordance with the standards and specifications of the City of Renton Planning/Building/Public Works Department and the latest edition of the WSDOT/APWA Standards and Specifications, as approved and modified by the City of Renton in the Renton Standard Plans & Specifications. This shall include necessary leveling of the trench bottom or the top of the foundation material, as well as placement and compaction of required bedding material, to uniform grade so that the entire length of the pipe will be supported on a uniformly dense, unyielding base. Pipe bedding shall be as required from the pipe bedding standards, Detail B077. 15. Sanitary sewer pipe shall be polyvinyl chloride (PVC) rubber gasketed ASTM D 3034, SDR 35, or ductile iron class 50, unless otherwise approved by the Wastewater Utility. 16. In unimproved areas, manhole to extend r inches above finished grade or must have mir poured at grade. In paved area, cover must sl paving. RECESSEC LIFT POCI SCREW 1 (BRONZE z x 2 I 12 4" — 14" 2„ $„ 1° a� 11" 12 1F 14" SIDE SEWER MAIN TO PROPERTY LINE BUILDING SEWER ? FUTURE 6" SEWER PIPE ' 6. 0' ' BLDG SEWER 6" SIDE OUTLET TEE 2 "X4 " STUD SERVICE RKER PAINT UPPER POR TION WHITE AND STENCIL ON SIDE WORD "SEWER" WITH 3 " HIGH BLACK LETTERS. 6" SIDE SEWER & BUILDING SEWER PLAN 6 " SIDE SEWER 1: J. 5 MIX NOTE. CONCRETE 60' ALLOWABLE MAX SIDE SEWER SHALL HA VE A BLOCKING , FOR CASTOR MINIMUM 5' COVER AT PROPERTY DUCTILE IRON PIPE. LINE OR 3-5' LOWER THAN THE 6"MIN 45' M �X LOWEST HOUSE ELEVATION, WHICH- 25 +MIN EVER IS LOWER. 67MlN HORIZONTAL 6" SIDE OUTLET TEE '—SEWER MAIN CONC. BLOCKING ANGLE OF TEE A T MAIN OVER 25 ° ELEVA T/ON CONCRETE CLASS 3000 Z TIGHT _D GCE l0v0 G 29. MIN SLOPE TYPICAL SIDE SEWER ELEVA TI ON EXISTING SEWER MAIN f 6 " SIDE SEWER 6 "TEST TEE TO BE INSTALLED AT CONNECTION NO TE: MAKE TAP THROUGH CAST IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS STEEL BANDS WHEN CONNECTING NEW SIDE SEWERS TO EXISTING MAIN. 'VITRIFIED CLAY, PLAIN & REINFORCED CONCRETE, DI & C1 PIPE SEWER MAINS ARE TO BE CORE DRILLED. SIDE SEWER SER V/ CE D E TA I L TYP. SEE SH TS. 15 & 16 MIN MIN MIN MIN MIN 2" CLAS � n n Z_ CLA CLA I I PER CITY REVIEW DATED JULY 18, 2008 NO. Imo— VARIES �I 2" DEPTH OF GRIND OR SAW'CUT AND REMOVE PA VEMEN T PATCH DETAIL (HR-23) T YP. SEE SH TS. 1 CASTING INLAND FDRY IR EQUAL. PTAV714 EE DETAIL 5.1.4 ADJUSTMENT 4" MIN. 'ONE fORTAR JOINTS TEPS— 3/4 " DEFORMED BAR > TEPS SHALL BE INCLUDED 112„ NRETE RISER BY PIPE INC. APPROVED EQUAL MAX. PIPE SIZE-21 " 1. D. LADDER —STD. ALUM/NUM OR GALVANIZED STEEL. CONCRETE SHELF PRECAST BASE SECTION _ OR CAST IN PLACE 6" MIN. 6" MIN. SANITARY MANHOLE TYPICAL DETAIL (NTS) NOTES: I, STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFTEY STEPS OR EQUAL 2, STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED 3, CASTING TO BE PER DWG, BR29 4, MANHOLE SECTI❑NS TO BE OF REINF❑RCED PRECAST CONCRETE 5. ALL J❑INTS SHALL BE GROUTED, 6, SANITARY SEWER MANHOLES SHALL HAVE ALL INTERI❑R SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH A HIGH S❑LIDS URETHANE C❑ATING, WASSER MC—C❑NSEAL OR APPROVED EQUAL COLOR OF C❑ATING SHALL BE WHITE. 7, RUBBER GASKETTED J❑INTS SHALL BE IN CONFORMANCE WITH ASTM C-443, 8, CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 THE INSIDE DIAMETER OF THE LARGEST PIPE, 9, CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPT❑R, K❑R—N—SEAL BOOTS OR APPROVED EQUAL, VARIES MIN MIN MIN OF CURB OR OF PAVEMENT 2" CLASS `B' OVERLAY ENTER LINE OR _ANE LINE "AS —BUILT" NOTE: "AS —BUILT" IS BASED ON AN ACTUAL FILED SURVEY PERFORMED BY TOUMA ENGINEERS AND LAND SURVEYORS TOUMA ENGINEERS AND LAND SUR VEYORS, PLLC 6632 SOUTH 191ST PLACE, SU17E E-102 • KENT, WA 98032 PHONE (425) 251-0665 FAX (425) 251-0625 EDGE OF FXISTING/NEW A/C ROADWAY (TYPICAL) GRAVE/GRADE SHOULDER A NEEDED (TYPICAL) - ACP CLASS E' OR `B' 6" CRUSHED SURFACING TOP COURSE CRUSHED ROCK, FLOWABLE FILL OR AS REQUIRED BY ENGINEER S=347704 CHECKED FOR COMPLIANCE TO CITY STANDARDS Date Date Date SCALE I w, 1"=2°' ' '�' 4/0$ CITY OF GERASIMOV SEWER EXTENSION Fl '° RENTON PAGE. °NE WC' DATUM SANITARY SEWER DETAILS & NOTES DMINING AT FULL FOIE C Planning/Building/Public Works Dept. 5008 NE 1st STREET, RENTON WA. 972 IF NOT ONE INCH SCALE ACCORDINGLY SHEET: 2 OF:-ININININIAIA 2