Loading...
HomeMy WebLinkAboutSWP2703497.100 co _ � L _ � --- _ � -_, 0' 20' _ �--_--.Madsen INSTALL TEMPORARY YPASS DAM ��ETRO - -----_ -'�-� "= U FOR C S ON SEE DETAIL C =x - N ACCESS O 0 SCALE 1 20 Feet = � _.. -.._ i----------- --------- ` ` FROM THIS S DE _ ,.._ ... � SECOND � '• \ L_----_ (PROVIDE DAM �----___ _ ` -_ _ _ AND p�Mp _ --IF - EEDf p 0 COLLECT ----- CONSTRUCTION NOTES \ --SECON _ �� pARY FLOW - ---_- A �'�� 1. PIPE INVERT ELEVATIONS TAKEN FROM PRELIMINARY SITE X. LOG DROPS ----- —__ \�' PLAN, NEW LIFE CHURCH, WEST SIDE IMPROVEMENTS. - �` 120 2. SEDIMENT LIMITS AND BASIN BOTTOM ELEVATIONS ARE H:lv� APPROX. THE CITY MAY ADJUST THE SEDIMENT REMOVAL LIMITS AND DEPTHS AS NEEDED. BYPASS PIPE INLET 24"CMP IE=121.1 est 16 �\ REMOVE SEDIMENT TO BASE GRADES SHOWN 3. TEMPORARY BYPASS DAM SHALL BE WATER TIGHT SO BASIN 13_ - = D OR TO TOP OF RIP —RAP ON SIDE SLOPES. CAN BE DRAINED AND SEDIMENT CAN BE DRIED OUT. \ `i HAND DIG IF NEEDED TO IDENTIFY RIP -RAP. ` BOTTOM OF BASIN i APPX. EL 113 ' ,' DO NOT OVEREXCAVATE SIDESLOPES. USE SMOOTH BUCKET, NO TEETH. 4. FISH RESCUE IN THE SEDIMENT BASIN SHALL OCCUR IMMEDIATELY AFTER THE BYPASS DAM IS INSTALLED. j UTILITY EASEMENT .� \ \� \ ► SEDIMENT LIMITS APPROXIMATE. SEDIMENT DEPTH APPROX 4 TO 6 FEET. See Note ACCESS BASIN DOWN THIS SIDE ONLY 24"CMP BYPASS PIPE Li LOCATION NOT VERIFIED Arcv 120 �O \ �\ a' �;D f— cn 3 `� `ass X \ \ HYDROSEED AND STRAW DISTURBED SLOPE AND �09,\ \� J MULCH \\ Q �_- ACCESS ROAD I 1 AFTER BASIN CLEANING 12'x3' CONC. BOX CULVERT v OVERFLOW SPILLWAY \` \� IE=117.86 UTILITY EASEMENT �`. NO A0LESS FROM See Note ��' `�� ` T IS O �-`�,�% \ -�,- SIDE ` 24"CMP BY ASS PIPE LOCATION OT VERIFIED ' �� 36" CMP INLET ____ IE—115.81 -- �— M --_ — ET --_ o --_ SRO O O c9 BYPASS PIPE OUTLET \\\— �t_ \�� 24" CMP _ — — - - ...... --__ GRAVEL O �J I E=116.12 _ — — _ --_ ACCESS SS O { \� ,.._ ANNEC (dry) ROAD F OM S _ _ — ---_ R— - 36" CMP OU�\LET 169 I =114.47 ��\ �� OVERFLOW SPILLWAY — ----___ IE =116.8 est -- — c \cCD O � Is, �\ /� O` --- O UTILITY EASEMENT FROM NEW LIFE CHURCH 8/10/09 SEDIMENT BASIN CLEANING D RAW I N G AS —BUILT NOTES 1. 2009 - POND BOTTOM WAS WET AND MUCKY. KING CO. RECORDING # 2009100 7000046 EXCAVATOR STAYED ON PAD OF SEDIMENT AND REMOVED MATERIAL TO APPX. EL 113 BY JUDGING THE DEPTH SHOVEL WENT DOWN. APPROX 1000 CY REMOVED. BOTTOM WAS TOO MUCKY TO WALK ON AND SURVEY AFTER WORK WAS FINISHED. 2. 2010 - POND CLEANED TO APPX EL 113. BOTTOM WET, MUCKY DUE TO WATER GETTING PAST DAM OR GROUNDWATER. 3. 2011 - POND CLEANED TO APPX EL 113. BOTTOM WET, MUCKY DUE TO GROUNDWATER. p J. Sr oFw�, 2013 Cleaning RECOMMENDED fG0\ SURVEYED: SCALE: DESICNEDpC VERTICAL: NAVD 1986 HORIZONTAL: NAD 1983/1991 1► As NOTED .. ,:. CITY OF DATE: 6/ 1 0/ 1 3 MADSEN CREEK SEDIMENT BASIN FlELDBOOK: FOR APPROVAL RENTON PAGE: BY Daniel Carey 6/10/13 DRAWN: DC CHECKED: ONE ONE INCH DATUM CLEANING PROJECT DRAWING N0: BASIN 1 / RS AT FULL SCALE Planning/Building/Public Works Dept. F NOT ONE F SEDIMENT BY '` '�'"*`"' - N0. REVISION BY DATE APPR APPROVED: RS SICALE ACCORDINGLY SHEET: x OF: 2 D 3497