Loading...
HomeMy WebLinkAboutTED2703516.2jy �G a N oV 2 o ° 0 C7 y W 3 V Z O a J W Z 3 W z, �c Q Q J W ''m^^ v, a Ln N w Q a (�a W Cn cc o W w � En Q H a Q�CO �z WW 1 �a LLJOQ O W o� � Q 0 0 x 2 o Z 0 J � J sz W Cn a& U Q Ir- a- a- Q w Q w X x N } m O 0 3 b N 0 a� j I Z 0 U) 0ry i 3 O N o 0 o� 0 a� Q� �oY J NOTES 1. BEFORE ANY CONSTRUC7ON OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEE77NG MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER. 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETA77ON PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED /N THE FIELD AND OBSERVED DURING CONSTRUCTION. J. ALL REQUIRED SEDIMENTA770N/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONS TRUCT7ON TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACIL177ES SHALL BE MAINTAINED /N A SATISFACTORY CONDITION UN77L SUCH TIME THAT CLEARING AND/OR CONSTRUCTION /S COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. 7HE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADD177ONS TO EROSION/SEDIMENTA7ION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET AN77CIPATED SI7E CONDIRONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDIT70NS DICTATE, THE PERM/TEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACIL177ES WILL BE NECESSARY TO ENSURE COMPLETE SILTA77ON CONTROL ON THE PROPOSED SITE DURING THE COURSE OF CONSTRUC7ON, IT SHALL BE THE OBLIGA77ON AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACT70TIES AND TO PROVIDE ADDIT70NAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPER77ES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 5. APPROVAL OF THIS PLAN /S FOR EROSIONISEDIMENTAT70N CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCA77ON OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 6. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH APRIL 307H, ALL PROJECT DISTURBED SOIL AREAS GREATER THAN 5, 000 SQUARE FEET, 7HA T ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. Z IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGFTA77ON AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLAN77NG OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE 77ME OF YEAR. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER, INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT IS /N THE INTEREST OF 7HE PERMITEE, BUT MUST BE AUGMENTED WITH MULCHING, NET77NG OR OTHER TREATMENT APPROVED BY THE CITY OF REN TON, OUTSIDE THE SPECIFIED TIME PERIOD. NW 1/4, SW 1/4, SEC 17, TWP 23N, RGE 5E, W.M. SCALE: 1" = 20' 0 10 20 40 PROTECTION PER REMOVE AND REPLACE / Ex. Lx. I I s Mcx DETAILL, 7741S SHEET � � EX. CONCRE7E CURB AND LsII�� I (Typ)WALK AS N€CESSARY TO:: Ex. ICHT SLV ; ACCOMMODATE NEW V) AND POLE EX. ORI VEWA Y � (TO REMAI ) WA TER LINES CURB CUT I Ex E TR35 X EX UDED CUR B (7O REtMA/N) I I EX. V W , ' TO BE REPLACED �I — I — WQ— II6 CAUTION LOCATION OF EXISTING U77LI77ES SHOWN IS APPROXIMA TE AND MA Y NOT BE ACCURA 7E OR ALL INCLUSIVE. IT IS 7HE CON 7RACTOR 'S RESPONSIBILITY TO FIELD VERIFY LOCH 770N OF U77LI77ES PRIOR TO PROCEEDING WY7H CONS7RUC770N. YOU MUST CALL 1-800-424-5555 NOT LESS THAN 2 FULL BUSINESS DAYS BEFORE BEGINNING EXCA VA TION WHERE ANY UNDERGROUND U77LI77ES MAY BE LOCA7ED. FAILURE TO DO SO COULD MEAN BEARING SUBSTANTIAL REPAIR COSTS Checked for Compliance to City Standards SOLID WALLS FILTER MEDIA CATCH BASIN STANDARD STRENGTH FILTER FABRIC GRA TE D CATCH BASIN - D ' TRIAD A S S O C I A T E S 12112 115th Ave. NE Kirkland, WA 98034-6923 425.821.8448 425.821.3481 fax 800.488.0756 toll free www.triadassoc.com E ° N A N v zN RICHARD A. TOMK/NS, PE PROJECT MANAGER LONNIE E. CARLSON, PLS PROJECT SURVEYOR RICHARD A. TOMKINS, PE PROJECT ENGINEER PROJECT LANDSCAPE ARCHITECT FIRST SUBMITTAL DATE: 02119109 GRATE SCALE: HORN.: 1"--20' VERT.:N/A POROUS BOTTOM NOTE: THIS DETAIL IS ONLY SCHEMATIC. ANY INSERT IS ALLOWED THAT HAS A MIN, 0.5 C.F. OF STORAGE, THE MEANS TO DEWATER THE STORED SEDIMENT, AN OVERFLOW, AND CAN BE EASILY MAINTAINED. CATCH BASIN INSERT MAINTENANCE STANDARDS., 1. ANY ACCUMULATED SEDIMENT ON OR AROUND THE FILTER FABRIC PR07ECTION SHALL BE REMOVED IMMEDIATELY. SEDIMENT SHALL NOT BE REMOVED WITH WATER, AND ALL SEDIMENT MUST BE DISPOSED OF AS FILL ON -SITE OR HAULED OFF -SITE. 2. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE THIRD OF THE AVAILABLE STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED A T LEAST MONTHL Y. J. REGULAR MAINTENANCE 1S CRITICAL FOR BOTH FORMS OF CATCH BASIN PROTECTION. UNLIKE MANY FORMS OF PROTECTION THAT FAIL GRADUALLY, CATCH BASIN PROTECTION WILL FAIL SUDDENLY AND COMPLETELY IF NOT MAINTAINED PROPERLY. INTERIM CATCH BASIN GRATE PRO TEC TION NOT TO SCALE STAMP NOT VALID UNLESS SIGNED AND DATED JOB NO. 08— 129 SHEET N0. C2 OF m � N N 00 cc 00 U 2009 TRIAD ASSOCIATES