HomeMy WebLinkAboutSWP2703529.7N
L
Cy)
r
N
W
Q W
Z
U vJr^
W
7
O T
r n
v
d. J
2
LJ_
0
I`_
)
w �/l�
v
W
Q
W
Z
Q
W
Q
W
Q
J
Parametrix
1019 39TH AVENUE SE, SUITE 100
PUYALLUP, WASHINGTON 98374
T.253.604.6600 F.253.604.6799
www.parametrix.com
0
if
d
f
5
EXCAVATION
LIMITS, TYP
03
P LAN
SCALE IN FEET
0 30
60
TEMPORARY EROSION CONTROL CONSTRUCTION NOTES:
TEMPORARY EROSION CONTROL CONSTRUCTION NOTES (CONTINUED):
INSTALL TESC TRIANGULAR SILT DIKES AND OTHER APPROVED MEASURES ALONG
USE OF CONSTRUCTION STAGING AREAS INCLUDES: WELL POINTS AND DISCHARGE
PERIMETER OF SAW CUT LIMITS PRIOR TO BEGINNING OF EXCAVATION OF JACKING
PIPING TO THE SANITARY SEWER, TEMPORARY WAITING LOCATIONS FOR TRUCKS
PITS, RECEIVING PITS, AND OPEN CUT EXCAVATIONS.
WITH EXCAVATED MATERIAL FOR TESTING PRIOR TO LEAVING SITE, TEMPORARY
STOCKPILE OF NON -CONTAMINATED SOILS, STORAGE OF PROJECT -RELATED
DO NOT DAMAGE EXISTING VEGETATION WITHIN CURBED AREAS. DAMAGED
MATERIALS, STORAGE AND / OR TREATMENT TANKS FOR DEWATERING WATER FOR
VEGETATION SHALL BE REMOVED AND REPLACED WITH SIMILAR VEGETATION AT NO
TESTING AND ANY REQUIRED TREATMENT PRIOR TO DISPOSAL. THE CITY AND
ADDITIONAL COST TO THE CITY.
PROJECT DESIGN TEAM SHALL ALSO HAVE ACCESS TO THE CONSTRUCTION
STAGING AREAS.
DISCHARGE LOCATIONS FOR DEWATERING WELL POINTS INTO THE EXISTING
SANITARY SEWER SYSTEM. SEE PROJECT SPECIFICATIONS FOR REQUIREMENTS
PROVIDE STREET SWEEPING AT CONSTRUCTION ACCESS LOCATIONS AND ALONG
RELATED TO WELL POINT DISCHARGES.
CONSTRUCTION ROUTES AT THE END OF EACH WORKING DAY THAT COULD RESULT
IN THE TRANSPORT OF SEDIMENT FROM CONSTRUCTION VEHICLES ONTO PRIVATE
PARKING LOTS, PRIVATE OR PUBLIC EASEMENTS, OR CITY RIGHT-OF-WAY.
PROVIDE STREET SWEEPING IN AREAS OF TEMPORARY STOCKPILES AFTER
TEMPORARY STOCKPILES HAVE BEEN REMOVED.
RECONVENDED ; ❑R gEPROVAL
ByI---------------- Dates
By'---------------- Aatei--------
By, ---------------- Date:-
By)------- - - - Date:--- -- -
cr
r
a
x
rn �d
c,
� w
C
D=352907
SURVEYED: SCALE: - DATE:
IZONT I_: NAVD 1988
83/1 LAKE AVES / RAINIER AVES
ZZ HOR¢oNrAL: NAD ises/�ssi �> CITY JUNE 2011
DESIGNED: 1 n=JOB _ �I �� �J I 1 I O
J. COOP -L_ FIELD600K:
DRAWN: �� � i� E N T O N STORM. SYSTEM PAGE:
K. TAYLOR --_— DRAWING NO:
AT PULL SCALE °AT`'° Planning/Building/Public Works Dept. TEMPORARY EROSION AND SEDIMENTATION CONTROL PLAN C3
CHECKED:
NO. REVISION BY DATE APPR IF NOT CO INC.
APPROVED: SCALE ACCORDINGLY �, SHEET: 7 OF: 1 1