Loading...
HomeMy WebLinkAboutSWP2703529.7N L Cy) r N W Q W Z U vJr^ W 7 O T r n v d. J 2 LJ_ 0 I`_ ) w �/l� v W Q W Z Q W Q W Q J Parametrix 1019 39TH AVENUE SE, SUITE 100 PUYALLUP, WASHINGTON 98374 T.253.604.6600 F.253.604.6799 www.parametrix.com 0 if d f 5 EXCAVATION LIMITS, TYP 03 P LAN SCALE IN FEET 0 30 60 TEMPORARY EROSION CONTROL CONSTRUCTION NOTES: TEMPORARY EROSION CONTROL CONSTRUCTION NOTES (CONTINUED): INSTALL TESC TRIANGULAR SILT DIKES AND OTHER APPROVED MEASURES ALONG USE OF CONSTRUCTION STAGING AREAS INCLUDES: WELL POINTS AND DISCHARGE PERIMETER OF SAW CUT LIMITS PRIOR TO BEGINNING OF EXCAVATION OF JACKING PIPING TO THE SANITARY SEWER, TEMPORARY WAITING LOCATIONS FOR TRUCKS PITS, RECEIVING PITS, AND OPEN CUT EXCAVATIONS. WITH EXCAVATED MATERIAL FOR TESTING PRIOR TO LEAVING SITE, TEMPORARY STOCKPILE OF NON -CONTAMINATED SOILS, STORAGE OF PROJECT -RELATED DO NOT DAMAGE EXISTING VEGETATION WITHIN CURBED AREAS. DAMAGED MATERIALS, STORAGE AND / OR TREATMENT TANKS FOR DEWATERING WATER FOR VEGETATION SHALL BE REMOVED AND REPLACED WITH SIMILAR VEGETATION AT NO TESTING AND ANY REQUIRED TREATMENT PRIOR TO DISPOSAL. THE CITY AND ADDITIONAL COST TO THE CITY. PROJECT DESIGN TEAM SHALL ALSO HAVE ACCESS TO THE CONSTRUCTION STAGING AREAS. DISCHARGE LOCATIONS FOR DEWATERING WELL POINTS INTO THE EXISTING SANITARY SEWER SYSTEM. SEE PROJECT SPECIFICATIONS FOR REQUIREMENTS PROVIDE STREET SWEEPING AT CONSTRUCTION ACCESS LOCATIONS AND ALONG RELATED TO WELL POINT DISCHARGES. CONSTRUCTION ROUTES AT THE END OF EACH WORKING DAY THAT COULD RESULT IN THE TRANSPORT OF SEDIMENT FROM CONSTRUCTION VEHICLES ONTO PRIVATE PARKING LOTS, PRIVATE OR PUBLIC EASEMENTS, OR CITY RIGHT-OF-WAY. PROVIDE STREET SWEEPING IN AREAS OF TEMPORARY STOCKPILES AFTER TEMPORARY STOCKPILES HAVE BEEN REMOVED. RECONVENDED ; ❑R gEPROVAL ByI---------------- Dates By'---------------- Aatei-------- By, ---------------- Date:- By)------- - - - Date:--- -- - cr r a x rn �d c, � w C D=352907 SURVEYED: SCALE: - DATE: IZONT I_: NAVD 1988 83/1 LAKE AVES / RAINIER AVES ZZ HOR¢oNrAL: NAD ises/�ssi �> CITY JUNE 2011 DESIGNED: 1 n=JOB _ �I �� �J I 1 I O J. COOP -L_ FIELD600K: DRAWN: �� � i� E N T O N STORM. SYSTEM PAGE: K. TAYLOR --_— DRAWING NO: AT PULL SCALE °AT`'° Planning/Building/Public Works Dept. TEMPORARY EROSION AND SEDIMENTATION CONTROL PLAN C3 CHECKED: NO. REVISION BY DATE APPR IF NOT CO INC. APPROVED: SCALE ACCORDINGLY �, SHEET: 7 OF: 1 1