Loading...
HomeMy WebLinkAboutSWP2703529.9N LO co N CIL U) w C � G z w I— U W V J r ^ 7 O T ft� W �J J r ^ 2 IL r O r �r^ rU) VJ w a w Z Q oC cn w Q w Q gEY L.cl �� pF WA s� f 0 1019 39TH AVENUE SE, SUITE 100 PUYALLUP, WASHINGTON 98374 QT.253.604.6600 F.253.604.6799 z www.parametrix.com W RECOf!MF CBS' 06� 9PPf��1��L. By'---------------- Datet--------- By'---------------- Date, - Byl_ Date; _------- Byi---------------- Dater_ ------ NO. PHASE 1 B: START OE OPEN CUT PHASE 1 C: END OE OPEN CUT 1. ADJUST WORK AREA FENCING TO NEW LOCATION. RE -OPEN RECEIVING PIT 1 1. ADJUST WORK AREA FENCING TO NEW LOCATION. AS REQUIRED. 2. START OPEN CUT AT EAST END OF PROJECT, EXCAVATE AND INSTALL NEW 2. START OPEN CUT AT WEST END OF PROJECT, EXCAVATE AND INSTALL NEW STORM SYSTEM WITHIN LIMITS INDICATED. STORM SYSTEM WITHIN LIMITS INDICATED. 3. PREPARE AREA FOR ASPHALT RESTORATION. MATCH EXISTING SLOPES AND 3. AS NEW SYSTEM IS INSTALLED, BACKFILL EXCAVATION TO SURFACE AND MOVE GRADE TO DRAIN TO CATCH BASINS. PLACE ASPHALT RESTORATION. FENCING TO EAST TO ALLOW FOR CAR DISPLAY ALONG WEST FRONTAGE. 4. DEMOBILIZE ALL EQUIPMENT AND FENCING FROM WALKER PROPERTY. 4. ON WEEKENDS, MOVE CONTRACTOR VEHICLES AND MATERIALS TO STORAGE/PARKING AREA ON EAST SIDE OF WALKER PROPERTY. RELOCATE 5. CONTRACTOR MAY RETURN LATER TO PLUG AND ABANDON EXISTING 24" FENCING TO ALLOW FOR CAR DISPLAY ALONG FRONTAGE, AS POSSIBLE, STORM PIPE. FENCING SHALL BE SIMILAR TO THIS PHASE. WORK SHALL BE RE-ESTABLISH WORK AREA FENCING AT START OF WORK WEEK. ACCOMPLISHED QUICKLY AND ALL EQUIPMENT AND FENCING SHALL BE REMOVED WHEN WORK IS COMPLETED. 5. INSTALL TEMPORARY PYPASS PUMPING SYSTEM IN VICINITY OF CB-2 UNTIL TEMPORARY CONNECTION IS MADE IN ACCORDANCE WITH SHEET Cl, 6. ON WEEKENDS, MOVE CONTRACTOR VEHICLES AND MATERIALS TO CONSTRUCTION NOTE 3. STORAGE/PARKING AREA ON EAST SIDE OF WALKER PROPERTY. RELOCATE FENCING TO ALLOW FOR CAR DISPLAY ALONG FRONTAGE. RE-ESTABLISH WORK AREA FENCING AT START OF WORK WEEK. EOR ALL PHASES: 1. MAINTAIN CUSTOMER ACCESS FROM/TO SOUTH 3RD STREET AT ALL TIMES. 2. PROVIDE TRAFFIC CONTROL FLAGGERS AS REQUIRED FOR CONSTRUCTION AND CUSTOMER VEHICLE INGRESS AND EGRESS TO SOUTH 3RD STREET. 3. PROVIDE TEMPORARY BYPASS AND/OR PUMPING OF EXISTING STORM SYSTEM LEGEND AROUND WORK AREA. BYPASS MUST BE CAPABLE OF HANDLING ALL STORM FLOWS WITHOUT CAUSING FLOODING. _ _ _ _ _ _ _ _ _ TEMPORARY FENCING AS DEWATERING SYSTEM IS INSTALLED 4. SEE SHEET G4 FOR OVERALL DESCRIPTION OF GENERAL CONSTRUCTION SEQUENCING. TEMPORARY FENCING DURING X X x CONSTRUCTION PHASE TYPE 3 BARRICADE WITH R 1 1 -2 'ROAD CLOSED' (42%30") SIGN D=352909 SURVEYED: SCALE: DATE: VERTICAL: NAVD 1988 3/1 LAKE AVE S / RAINIER AVE S 2 ,t > HORIZONTAL: NAD 1983/1991 ,) CITY 0 r J U N E L 0 1 1 DESIGNED: 1 "- 40 �� Ir. J. COOP FIELD800K: DRAWN: R E �\ I T O E\ I STORM SYSTEM PAGE: K. TAYLOR ONE INCH s I\ I V I I V DRAWING NO: AT FULL SGALE DATUM Punning/Building/Public Works Dept. WALKER PROPERTY TEMPORARY PHASING, (J cj CHECKED_ IF NOT ONE INCH REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY FENCING, AND TRAFFIC CONTROL PLAN SHEET: 9 OF: 1 1 BI-131512191019