Loading...
HomeMy WebLinkAboutWWP2703626.14ELECTRICAL NOTES ELECTRICAL BUILDING INTAKE LOUVER FI OVU AAFTFR H° °F WASI; 0 11. SEE DWG N0. E02 FOR ELECTRICAL EQUIPMENT AND INSTRUMENTATION SCHEDULE. xxx 2, SEE DWG N0. E02 FOR CONDUIT/CONDUCTOR SCHEDULES. 3 3. MOTOR CONTROL CENTER, 'MCC'. SEE DWG NO. E04 FOR DETAILS. 4 4. AUTOMATIC TRANSFER SWITCH, 'ATS'. 5 5. TELEMETRY PANEL, 'RTU'. PROVIDED BY CITY OF RENTON. CONTRACTOR SHALL INSTALL THE 'RTU' AND CONNECT ALL FIELD. SEE APPENDIX FOR TELEMETRY PANEL DRAWINGS. 6 6. TO EXISTING PAD -MOUNT TRANSFORMER. SEE ELECTRICAL SITE PLAN FOR CONTINUATION. I� 7. GROUND ROD PER N.E.C. (TYPICAL). USE EXOTHERMIC WELD CONNECTION AT THE GROUND ROD. SEE DWG N0. E06 FOR ADDITIONAL DETAIL. LOCATE GROUND RODS 2' MINIMUM FROM BUILDING FOUNDATION. 8 ,� 18. CONNECTION TO REINFORCEMENT GRID (TYPICAL OF 2 LOCATIONS). SEE DWG NO. E06 FOR ADDITIONAL DETAIL. 9. PROVIDE STAINLESS STEEL CALUMS CORD GRIP BASE (CGB) AT CONDUIT PENETRATION INTO WET WELL, TYPICAL OF ALL CONDUIT PENETRATIONS INTO WET WELL. Al 1 10. SEE DWG NO. E02 FOR LIGHTING FIXTURE SCHEDULE. 11. LOCATE ALL LIGHT FIXTURES, SWITCHES AND DEVICES IN LOCATION SHOWN ON THE PLANS USING ENGINEERING SCALE. ADJUST LOCATION AS NECESSARY TO AVOID INTERFERENCE WITH OTHER EQUIPMENT. 2 12. CONTRACTOR SHALL AIM LIGHTS TO ILLUMINATE WET WELL AND VAULT HATCH OPENINGS. F 13. MOUNT SWITCH ON PRIMARY LEAF OF ACCESS HATCH (TYPICAL). 4 14. CONTRACTOR SHALL PROVIDE ANTENNA, CONDUIT, AND CABLE FOR PROPOSED ANTENNA ON LIGHT POLE. CONTRACTOR SHALL REMOVE EXISTING ANTENNA AFTER PROPOSED LIFT STATION IS IN SERVICE. �:� 15. LIGHT SWITCH FOR SITE LIGHTING NOT SHOWN. PROVIDE LIGHT SWITCH IN BUILDING NEAR SHOWN LIGHT SWITCHES FOR MANUAL OPERATION. FORCEMAIN VALVE VAULT. INTERIOR OF VAULT IS UNCLASSIFIED ASPHALT ROLLED CURB FLOWMETER TRANSMITTER "RTU" OPENING MOTOR "^' 1^r- 1 f A \1r%1 1^1 f- nf-r D 'FA LIGHT POLE. SEE DWG NO. E07 FOR DETAILS REVISED T© CONFORM OO CONSTRI.ICTION RECORDS R42 ENGINEERING INC, DATE INTRUSION DISABLE KEY SWITCH TO NEW ANTENNA ON LIGHT POLE FLOAT/LEVEL TRANSMITTER SPLICE HANDHOLE. SEE DETAILS ON DWG NO. E06 "MCC' "MCC" "RTU" "RTU" (TYP) Won Abiff 44R'TiErn M 4 W I UL C�SHATCH ENIN WE T WELL tf GENERATOR RECEPTACLE "RTU" "MTS'f HLff C8 "ATS" . C7 I P18 i1)M362 1 4 VENT PIPE STANDBY GENERATOR, SEE NO. E08 FOR DETAILS. CONCRETE PAD. SEE DWG NO. E08 FOR DETAILS. EXHAUST FAN WITH - LOUVER. SEE DWG. NO E05 FOR DETAILS MAIN SERVICE DISCONNECT SWITCH UTILITY METER REASED PER CONSTRUCTION RECORDS GAD MLM NO, REVISION BY REVIEW 16727 ���► I S T 8gi'O� IONAL SIGNED. 01118113 SIGNED. 01118113 Z W Zb W z U Q Z� J 0 � a � w H W o U) cc a LAft� 0 CM) y Ix ci ftwft .j W Uj J 'ICEwaft C Z J ' Oudj ENGINEERS PL..ANNERS SCIENTISTS RH2 ENGINEERING, INC. hittp://www.rh2.com m:a,fbox@rh2,com 1,800.720.80'- 3ELLINGHAM 36o.676.o 4:54 West Horton Road BOTHELL 425.$5 >2722 29th Drive SE, Suite EAST WENATCHEE 5. "00 Simon 'street. Suite 5 ' 14 Columbia Point Drive, Suite aILVERDALE 3 '021 NW Mhyre Rd, Suite l(J TACOMA 621 Pacific Avenue Sui _ _ SCALE: SHOWN 0 1» 2 a: DRAWING IS NOT TO SCALE IF BAR IS NOT 2" LONG PLOT: 1 DWG No. ENGINEER: CCA E03 REVIEWED MLM DATE: Nov 11, 2014 SHEET No, 14 CLIENT: REN 07/16/14 JOB NO.: 112-023 Y20 DATE FILENAME LIND-D-E-SITEPLAN.DWG • {Z z C 10 C z M m M O D Cn D C O D O O 0 C O C-D �cn D �m z� C �_ COO M-0 0K r�D� m co 0 D n 0 M z 0 Z C K co 11 m D C 0 CDC Tc