Loading...
HomeMy WebLinkAboutSWP2703645.5N N N U) 420 415 co S1. 410 m Ji .E; 0 405 m W 400 395 CELL " POND EXCAVATION 3:1 SIDE SLOPES (TYP) C� POND OUTLET W/DEBRIS BARRIER STA 0+0(Y— N 185222.53 E 1312726.70 SEE RENTON STD DETAIL 223.00 AND DETAIL 5/C-4 18" S 1 TOP OF DETENTION VOLUME, EL 411.5 - SEE PROF CB #1 TYPE STA 0+37 N 185222.80 E 1312690.58 SEE RENTON STD DETAIL 201.00 CELL 2 BERM W/3:1 SIDE SLOPES TOP OF BERM EL 404.76 SEE NOTE 2 - - - - v 0+00 0+50 ECTION _LZ`i = w H _ 1"=5'V BHC Consultants, LLC 1601 Fifth Avenue, Suite 500 Seattle, Washington 98101 206.505.3400 www.bhccon (fax) www.bhcconsultants.com w�ti�ICT OF WAS�I�C � 9 1.0 46352 'VS/GIST NAL E(26�2a BOTTOM OF EXISTING POND/ TOP OF WATER QUALITY TREATMENT VOLUME, EL 405.76 (APPROX) BOTTOM OF POND WATER QUALITY TREATMENT VOLUME, EL 398.0 1+00 O'V w 420 415 410 405 400 395 ROAD AIL 4/C-4 SEE PROFILE 1/C-3 if co I t ''' C6 00) ��� ��W _ +a Uj�— D N N IIII CONNECT TO EX w z 4�I! 4 ;° ``' �' ``' o 0 - --- - j FLOW CONTROL STRUCTURE, a, Y `� z W z ''1� I I I I I �� -.j 11 I I SEE NOTE 4 '� C STA 2+11 (APPROX) 420 415 4`1 Co Z405 w a� 0 400 W 395 390 385 TOP OF DETENTION VOLUME, EL 411.5 17 - 1 3:1 SLOPE, �- TYP CELL 2 BOTTOM OF POND WATER QUALITY TREATMENT VOLUME, EL 398.0 TOP OF BERM EL 40446 - 4-04.50 EL 400 0 20 40 Scale in Feet CONTOUR INTERVAL IS 1 FOOT. NOTES 1. POND AND BERM SIDE SLOPES SHALL BE 3:1 MAXIMUM. 2. BERM SHALJ_ BE CONSTRUCTED OF EXISTING NATIVE MATER�---- ' U; 1 ]-q PLACE. 3. EXISTING POND SLOPES REMAIN INTACT AND SHALL NOT BE MODIFG-Iri ., 4. CONTRACTOR SHALL PROTECT EXISTING FLOW CONTROL STRUCTURE, INCLUDING ALL INTERNAL PIPING AND APPURTENANCES. WATER QUALITY VOLUME L_'_ ` 14531 16890 CF 2 214.19 26:788 CF BOTTOM OF EXISTING POND/ TOP OF WATER QUALITY TREATMENT VOLUME, EL 405.76 (APPROX) EL 399 1' SEDIMENT STORAGE INSTALL QUARRY SPALLS 18" DEEP IN BOTTOM 2' OF CELL 1 CELL 1 D 364505 0+50 1 +00 1 +50 2+00 2+50 SECTION B SCALE: 1" = 20' H _ AS —BUILT ill =5'V 420 415 410 405 400 RECOMMENDED FOR APPROVAL A BY BY -- surm srxE vmcx wwo , r - CH2M HILL (1997) AS SHOWN mmzwrAiwb ilmiaal ;► CITY OF N.E. 10TH STREET AND ANACORTES AVLE I �. P. MINNINCHAM '— DETENTION POND RETROFIT DPAW SIMON — F ! N TO N PROJECT owom 5- I INFO F W TE D CITY a�a� DATUM A Q U t.T O A D N O s h OE D $Y Y o F RtT1T q G Q 2112 14 AT FUl scuF J. KRESHEL ,,� o Planning/Building/Public Works Dept. GRADING NO. REVISION BY DATE APPR A. QUYNN SCAZ NO. �� ] AND S; CTIONS W1TE: JUNE 2013 PME oROM W. C-Z SHM.. 5 OR L" u : 0 B 3 (S 14151015 z mtZI o � �~ 0 1 ootz� m� 1 � � W o zy �