CITY OF RENTON SANITARY SEWER NOTES AND SPECIFICATIONS CITY OF RENTON SURFACE WATER DRAINAGE NOTES AND SPECIFICATIONS
1. ALL WORK AND WORK MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS
AND SPECIFICATIONS OF THE CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS
DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND
SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON IN THE RENTON
STANDARD PLANS & SPECIFICAi IONS. A SET OF APPROVED PLANS SHALL BE KEPT ON
SITE AT ALL TIMES DURING CONSTRUCTION.
2. THE HOURS OF WORK IN THE STREET RIGHT OF WAY SHALL BE PER CITY
SPECIFICATIONS ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE
PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT. AN APPROVED TRAFFIC CONTROL
PLAN MUST BE OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN PUBLIC RIGHT OF
WAY.
3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS
TO AVOID DAMAGE OR DISTURBANCE.
4. A PRE -CONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED
PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING
CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE
CITY OF RENTON.) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE
PUBLIC WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL
CONSTRUCTION.
5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND
ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
7. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE
PRECEDENCE OVER ALL OTHER PLANS.
8. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING
OF THE SANITARY SEWER SYSTEM, WHICH HAS BEEN STAMPED AND SIGNED BY A
LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR.
10. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A
LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY
TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED
LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO
THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE
THE SAME AS DESCRIBED.
11. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY
SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED UNLESS
OTHERWISE APPROVED BY CITY OF RENTON PUBLIC WORKS DEPARTMENT.
12. NOT USED
13. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO
THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION
AFTER THE COMPLETION OF CONSTRUCTION.
14, ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY
OF RENTON PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION
OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED
BY THE CITY OF RENTON IN THE RENTON STANDARD PLANS & SPECIFICATIONS. THIS
SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE
FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE
WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. PIPE BEDDING SHALL
BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE.
15. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM
D 3034, SDR 35, OR DUCTILE IRON CLASS 50, UNLESS OTHERWISE APPROVED BY THE
WASTEWATER UTILITY.
16. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 12
INCHES ABOVE FINISHED GRADE OR MUST HAVE MINIMUM 2' DIAMETER CONCRETE RING
POURED AT GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH
PAVING.
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRECONSTRUCTION MEETING
MUST BE HELD WITH THE CITY OF RENTON PLAN REVIEWER.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 1996 STANDARD SPECIFICATIONS FOR
ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC
WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT.
3. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED
PLANS, WHICH ARE ON FILE IN THE PUBLIC WORKS DEPARTMENT. ANY DEVIATION FROM THE
APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF RENTON PUBLIC WORKS
DEPARTMENT, SURFACE WATER UTILITY SECTION.
4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS
IN PROGRESS.
5. NOT USED
6. ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND
BUILDING CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION
IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED.
7. NOT USED
8. GRASS SEED MAY BE APPLIED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY
OF RENTON APPROVED STANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND
APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.
9. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN
ACCORDANCE WITH SECTION 7-02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD
SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING
OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT
AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE
LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE
BEDDING SHALL BE APWA CLASS "C", WITH THE EXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL
SHALL BE COMPACTED TO MINIMUM 95% FOR PAVEMENT AND STRUCTURAL FILL AND 90%
OTHERWISE PER ASTM D-1557-70. PEA GRAVEL BEDDING SHALL BE 6 INCHES OVER AND
UNDER PVC PIPE.
10. GALVANIZED STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACILITIES SHALL HAVE
ASPHALT TREATMENT #1 OR BETTER INSIDE AND OUTSIDE.
11. STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY STORM
DRAINAGE PIPE, OR 15 FEET FROM THE TOP OF ANY CHANNEL BANK.
12. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL.
13. OPEN CUT ROAD CROSSINGS THROUGH EXISTING PUBLIC RIGHT OF WAY WILL NOT BE ALLOWED
UNLESS SPECIFICALLY APPROVED BY CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS
ADMINISTRATOR.
14. NOT USED
15. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM
DRAINAGE SYSTEM, UNLESS APPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY
SECTION. AN ACCURATELY DIMENSIONED, CERTIFIED AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM
WILL BE SUBMITTED TO THE CITY UPON COMPLETION.
16. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT
RELIEVE THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH
STORM SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY
OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING
CONSTRUCTION.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY
DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE
LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH
THE PERFORMANCE OF WORK COVERED BY THE CONTRACT. ANY WORK WITHIN THE TRAVELED
RIGHT OF WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL
PLAN APPROVE BY THE PUBLIC WORKS DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL
SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY.
18. NOT USED
5
CITY OF RENTON
Approved by: a /V4;4 Date: 3 �y 2Ot
Approved by:
Approved by:
Approved by:
S=3 67202
Date:
Date:
Date:
PLEASE CALL 811
3 Working Days
BEFORE YOU DIG
I
schemata
workshop
architect
Schemata Workshop, Inc.
1720 12th Avenue #3
Seattle, WA 98122
CONTACT: Grace Kim, AIA
v (206) 285.1589
f (206) 285.2701
e grace@schemataworkshop.com
owner
The Salvation Army
Western Territory
720 S. Tobin St.
Renton, WA 98057
CONTACT: Captain Chris Aird
v 425.255.5974
e chris.aird@usw.salvationarmy.org
DESIGN COMPANY
1205 SECOND AVE. SUITE 200
SEATTLE, WA 98101
T 206.223.0326
P 206.223.0125
www.svrdesign.com
Salvation Army
Renton Corps
Expansion
720 South Tobin Street
Renton, WA 98057
PRINT DATE 03/12/2013
REVISION SCHEDULE
U DATE DESCRIPTION
3 2/4/2013 PERMIT CORRECTIONS
® 3/11/2013 PERMIT CORRECTIONS #2
PROJECT ISSUE DATES
B CONDITIONAL USE PERMIT AUGUST 3, 2012
BUILDING PERMIT NOVEMBER 5, 2012
PERMIT CORRECTIONS FEBRUARY 4, 2013
PERMIT CORRECTIONS #2 MARCH 11, 2013
1116
Author: SS/LK
Checker: PB
Notes
C 102
r
0
z
a
N�
o
f
�z
m
x
9
0
z
1 2
3
4
Copyright Schemata Workshop, Inc.