GENERAL NOTES
ALL WORK AND WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS,
AS APPROVED AND MODIFIED BY THE CITY OF RENTON IN THE RENTON STANDARD PLANS & SPECIFICATIONS. A SET OF APPROVED
PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION.
THE HOURS OF WORK IN THE STREET RIGHT OF WAY SHALL BE PER CITY SPECIFICATIONS ON WEEKDAYS UNLESS OTHERWISE
APPROVED IN WRITING BY THE PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT. AN APPROVED TRAFFIC CONTROL PLAN
MUST BE OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN PUBLIC RIGHT OF WAY.
ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
A PRE -CONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION.
(INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON.) IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO NOTIFY THE PUBLIC WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION.
N
5.
CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION
AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE.
W
6.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
U)
Q
7.
PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT, SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS.
=
8.
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9.
THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE
SANITARY SEWER SYSTEM, WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL
=
ENGINEER OR LICENSED PROFESSIONAL SURVEYOR.
I-
10.
BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE
AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO
O
95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE
z
DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE
THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED.
11.
OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE
BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED UNLESS OTHERWISE APPROVED BY THE
CITY OF RENTON. CUTS INTO THE EXISTING ASPHALT SHALL BE NEATLINE CUT WITH SAW IN A CONTINUOUS LINE.
w
A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION. A PERMANENT HOT MIX
Z
PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS.
12.
DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988 METERS, AND FOR HORIZONTAL CONTROL
SHALL BE NORTH AMERICAN DATUM 1983/1991 METERS UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON PUBLIC WORKS
DEPARTMENT. REFERENCE BENCHMARK AND ELEVATIONS ARE NOTED ON PLANS.
13.
ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE
SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION.
14.
ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN
ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS
DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND
MODIFIED BY THE CITY OF RENTON IN THE RENTON STANDARD PLANS & SPECIFICATIONS. THIS SHALL INCLUDE NECESSARY
LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION
OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON
A UNIFORMLY DENSE, UNYIELDING BASE. PIPE BEDDING SHALL PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
15.
SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50,
16.
IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 12 INCHES ABOVE
FINISHED GRADE OR MUST HAVE MINIMUM 2 FOOT DIAMETER CONCRETE RING POURED AT GRADE.
IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING.
2" CLAS
*2„ .
CLA
CLA
MIN IMIN MIN, MIN MIN
I- 6.5' M I N . -i
2" DEPTH OF
GRIND OR SAWCUT AND REMOVE
* SEE DWG# HR-05 FOR MINIMUM STANDARDS
OF CURB OR
OF PAVEMENT
2" CLASS 'B'
:ENTER LINE OR
ANE LINE
6.5' MIN.
1' 1' 2.5' 1' 1'
MIN MIN MIN I MIN MIN
\-*ACP CLASS 'E' OR 'B'
6" CRUSHED
SURFACING TOP COURSE
CRUSHED ROCK,
FLOWABLE FILL
OR
AS REQUIRED BY ENGINEER
TYPICAL PATCH FOR FLE3UBLE PAVEMENT
WHEN PERPENDICULAR TO
ROADWAY CENTERLINE
p ADOPTED
CUT OF 10N9'ON
,p STANDARD PL►Ns
N 1 LST DATE: 12/96
DWG. NAME: HR-23 SP PAGE: H032A
TYPICAL PATCH FOR FLEXIBLE PAVEMENT
N.T.S.
OFFE ENGINEERS
13932 SOUTHEAST 159TH PLACE
RENTON, WASHINGTON 98058
PHONE: 425-260-3412
CONTACT: DARRELL OFFE, P.E.
PROPERTY LINE
Q FUTURE
rTEE6'WITH
BUILDING SEWER PIPE -I BUILDING SEINER
w
�2""x 4" STUD MARKING POST PAINTED
6" SIDE OUTLET '' 6'X6"X6. WYE WHITE WITH THE WORD "SEWER' STENCILED
SURFACE CLEANOUT WITH CAST IRON RING & COVER IN 3" HIGH BLACK LETTERS AND6 WIRE
WRAPPED AROUND THE STUD AND
(EAST JORDAN IRON WORKS
2975 OR APPROVED EQUAL, EXTENDED TO THE TOP OF THE STUD.
SPECIFY "SEWER' ON LID,
6" ODE SEWER AND BUILDING SEWER SEE STD. PLAN 403.1 FOR
INSTALLATION)
ACCEPTABLE PROCEDURES FOR SIDE SEWER CONNECTIONS TO MAIN
LINES ARE AS FOLLOWS:
A. VITRIFIED CLl ° MAIN -- CUT IN A NEW SECTION OF SEWER MAIN WITH
A NEW TEE USING FLEXIBLE COUPLINGS
(FERNCO OR APPROVED EQUAL).
8. CONCRETE MAIN - CUT IN A NEW SECTION OF SEWER MAIN WITH
A NEW TEE USING FLEXIBLE COUPLINGS
(FERNCO OR APPROVED EQUAL).
C. PVC MAIN - CORE -DRILLED WITH A ROMAC SADDLE (OR APPROVED
EQUAL) OR CUT IN A NEW TEE USING RIGID COUPLINGS.
D. DUCTILE IRON MAIN - CORE -DRILLED WITH A ROMAC SADDLE (OR
APPROVED EQUAL)
E. MANHOLE CONNECTION ALL CONNECTIONS TO MANHOLES SHALL BE
AT MANUFACTURED KNOCK -OUTS OR THE
STRUCTURE SHALL BE CORE -DRILLED.
60" ALLOWABLE MAX.
FOR CAST IRON PIPE
OR DUCTILE IRON PIPE.
1:3:5 MIX '
CONCRETE
BLOCKING
�,rN 2C�yG4� 2% MIN SLOPE
HORIZONTAL
6" SIDE OUTLET TEE
SEWER
6" MIN. MAIN SEWER MAIN
CONCRETE BLOCKING ANGLE
OF TEE AT�AN EVER 25 TYPICAL SIDE SEWER ELEVATION
ELEVA11ON
UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE:
A MINIMUM 2.5" COVER AT PROPERTY LINE OR 3-5` LOWER
THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER.
PUBLIC WORK STANDARD .TIDE SEWER SM. PLAN '°'• °�
♦I ,� INSTALLATION
DEPARTMENT (SaWER MAIN TO PROPERTY LINE) J'A UARY 2013
SURVEYED
a e ti e� DESIGNED:
b D.L. OFFE, P.E.
• DRAWN:
27460
D.L. OFFE, P.E.
°'
/ R O CHECKED:
OFss d N A L ° G\ APPROVED:
12/04/2014 NO. REVISION BY DATE APPR
W (SEE NOTE 7) --�1 LIMITS of PIPE ZONE
BEDDING MATERIAL FOR
SANITARY SEWER PIPE
(SEE NOTE 5)
FOUNDATION LEVEL /
i
9EDDING FOR SANITARY SEWER PIPE
NOTES:
1. PROVIDE UNIFORM SUPPORT UNDER BARREL,
2. HAND TAMP UNDER HAUNCHES.
3. COMPACT BEDDING MATERIAL TO 95% MAX. DENSITY EXCEPT DIRECTLY
OVER PIPE. HAND TAMP ONLY.
4. PIPE INSTALLATION SHALT. BE PER SECTION 7-08 OF THE
STANDARD SPECIFICATIONS,
5. PIPE ZONE MATERIAL SHALL BE "GRAVEL BACKFILL FOR DRAINS"
AS SPECIFIED IN THE AGGREGATES SECTION OF THE STANDARD
SPECIFICATIONS OR PEA GRAVEL.
6. PIPE MIDST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW
LINE IS MAINTAINED.
7. TRENCH WIDTH SHALL BE PER SECTION 2-09.4 OF THE
STANDARD SPECIFICATIONS.
PUBLIC WORKS RIPE BEDDING
* DEPARTMENT FOR SANITARY SEWERS OCTOBER 2012
SCALE HORIZONTAL NAD 1983/1991
ONE INCH DATU M
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
CITY OF
m AN RENTON
Planning/Building/Public Works Dept.
S=3 77102
RECOMMENDED FOR APPROVAL
By: Date:
By: Date:
By: Date:
By. RI�iQys Date: 0._1 s�461
NE 7th NORTH PHASE 2
SCOTT DONOGH HOMES, INC.
SANITARY SEWER DETAILS & NOTES
3518 NE 7th Street
12/04/2014
FIELDBOOK;
PAGE:
SHEET: 9 OF: 13
71F-
O
D
z
C
m
33
z
m
v
�z c
1
o =
N
`Z7
a
1
m
I N
I
r
D
T
o
13
0°o
D
,mo
lob
s
W u1
G
i<