Loading...
HomeMy WebLinkAboutAdden 1 ANIL CAG-14-074, Adden #1-15 Washington State VAf Department of Transportation Supplemental Agreement Organization and Address Number1 Universal Filed Services, Inc. 111 Main Street#105 Original Agreement Number Edmonds,WA 98020 CAG-14-074 Phone: 425-673-5559 Project Number Execution Date Completion Date 5/6/2014 5/31/15 Project Title New Maximum Amount Payable SE 176th St SE @ SE Benson Dr(SR165) Carr Rd $ 15,042 Description of Work Right of Way Acquisition and Relocation Services The Local Agency of City of Renton desires to supplement the agreement entered into with Universal Field Services, Inc. and executed on 5/6/2014 and identified as Agreement No. CAG-14-074 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: 1 Section 1, SCOPE OF WORK, is hereby changed to read: See Exhibit A - Provide appraisal review and negntiatinn cervices fnr Wect and Song Tnwing parcel See Fxhihit A fnr the list of Ardrditinnal Wnrk Cnmpleterd I1 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: III Section V, PAYMENT, shall be amended as follows: See Exhihit R - Supplement amnunt of,�4,1 QS (4,3 277 for new wnrk to cmmplete»lns 91 R fnr ad ditinnal work completed;original contract amount$10,847 plus this supplement amount of$4,195 = $15,042). as set forth in the attached Exhibit B, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By. Universal Field Services, Inc . By. Gregg Zimmerman, Public Works Administrator p/ , Region ManagerZMM 01 dn-! sultant Signature roving Authori y Signature March 10, 2015 DOT Form 140-063 EF Date Revised 9/2005 February 27,2015 *4✓ tirrr CAG-14-074 rZ#tSRL EXHIBIT A � � Scope of Work Sub-Task B SW 43rd St/ SE Carr Rd SE 176"' St / SE Petrovitsky Rd Corridor Safety Project Task Element- Right of Way Services for West and Sons Towing Offer Background The City of Renton (CITY) has had meetings with West and Sons Towing (WEST) to gauge their willingness to sell their parcel to the CITY and subsequently purchase the adjacent fire District parcel as a replacement site. To date, WEST has stated they have no interest in purchasing the fire District property and would only be interested in a property swap with no money out of pocket. As such, the CITY has asked Universal Field Services, Inc. (UFS) to provide this Scope of Work (SOW) to make a written offer and provide the minimal required negotiations to purchase a portion of the WEST'S parcel for the project. If WEST is still uninterested, the CITY may elect to put the project on hold. Additional Work Completed A previous SOW was presented for Sub-Task B of the project which included right of way services for all parcels. Due to the uncertainty involving the WEST parcel, the CITY was unwilling to fund the entire SOW for services that may not be needed. The CITY acknowledged that additional work must continue while developing the appropriate SOW and strategy for the project. The CITY committed to reimburse UFS for the additional items outlined below. • Plan right of way schedule with KPG • Revision of SOW, Fee Estimates and Supplemental Agreement • Revise subconsultant agreements (appraiser and review appraiser • Participate in discussions with CITY staff on WEST acquisition strategy The costs associated with these work items are included in the fee estimate presented with this SOW. Property Rights to be Acquired The CITY acknowledges that the appraisal and written offer to WEST will be made prior to receiving a letter from FHWA authorizing the use of federal funds to acquire Right of Way. As such, FHWA reimbursement for right of way services associated with this SOW may not be available and condemnation cannot be used for the acquisition of the property and/or property rights. Based on the Right of Way Plan dated October 2013, review of schematic drawings and exhibits and discussions with CITY staff, property and/or property rights will be required from the WEST parcel as shown in Table A below. Additional parcels or real property rights other than those shown in Table A will require an amendment to this scope of work and related fee estimate. This scope of work is based on the following: I.) Discussions with CITY staff. 2.) Recent tour of the project limits 3.) Review of limited public on-line information (mapping/ ownership information) 4.) Right of Way plans, Schematic Drawing and Exhibits 1 of 3 February 27,2015 '�✓ `rr�' CAG-14-074 Preparation and Administration - Discuss, strategize and plan overall process with CITY, UFS and other consulting staff. Attend up to two (2) progress meetings via telephone conference. Provide one (1) monthly progress report indicating the work completed for the invoiced month, anticipated work for the following month, and identify issues requiring the CITY's input or assistance. Deliverables: • Attend two (2) teleconference Progress Meetings • Provide one (1) Monthly Progress Report • Prepare parcel acquisition file for negotiations 2 Appraisal—Appraisal of the property has been completed by CITY under separate contract with the appraiser. 3 Appraisal Review — UFS will subcontract and manage the Appraisal Review process with an appraisal firm previously qualified by WSDOT and certified by the State of Washington. The Appraisal Review report will be prepared in accordance with the Uniform Standards of Professional Appraisal Practices, Washington State Department of Transportation (WSDOT) Local Agency Guidelines, current WSDOT Right of Way Manual (in particular, Chapters 4 and 5), and the URA. It is assumed one (1) Appraisal Review report will be required. Deliverables: • One (1) Appraisal Review report in accordance with the Uniform Standards of Professional Appraisal Practices, Washington State Department of Transportation (WSDOT) Local Agency Guidelines, current WSDOT Right of Way Manual (in particular, Chapters 4 and 5), and the URA. 4 Acquisition Negotiation — UFS will provide services for the acquisition of real property rights from one (1) separate tax parcel as shown in Table A below. The Appraisal Review will be submitted to the CITY for written approval establishing the amount of Just Compensation to the property owner. Upon written approval from the CITY, UFS will prepare the offer package and promptly present offer to purchase all the required real property interests. Offer will be presented via certified mail and regular US mail. Negotiations will be limited to making three (3) significant contacts with the property owner in accordance with statutory and regulatory requirements. If the property owner shows willingness to negotiate in good faith, the CITY and UFS will supplement this SOW to include further right of way services. Negotiations shall not be deemed to have failed until at least three significant meaningful contacts have been made and documented with the owner and/or their representative through direct personal contacts. If negotiations reach an impasse, UFS will provide the CITY with written notification. Deliverables: • Acquisition Negotiation services with owner of one (1) separate tax parcel. • Parcel file including necessary records of all Right of Way Acquisition services. 5 Relocation — It is assumed WEST may be eligible for relocation as a result of this project. Therefore, relocation assistance and advisory services may be required if the project proceeds. Relocation services are not a part of this SOW and fee estimate. Relocation services will require an amendment to this SOW. Deliverables: • None. For informational purposes only. 6 Parcel Closeout — Escrow Closing — This SOW does not include parcel closeout and escrow closing. 2 of 3 February 27,2015 NOW CAG-14-074 Deliverable: • None. For informational purposes only. Additional Work - If other tasks are required to be performed or there are changes in pertinent information or if negotiations exceed the industry standard for a good faith effort to negotiate (three "in- person" landowner contacts), UFS reserves the right to request additional compensation as an equitable adjustment. UFS shall not be responsible for delays caused beyond its control. CITY will provide the following I. Right of Way Plans and Drawings, Maps, Exhibits, Right of Way Staking, etc., as necessary. 2. Legal descriptions in electronic format for all real property rights to be acquired. 3. Form approval, in electronic format, of all legal conveyance documents prior to use (i.e. offer letters, purchase and sale agreements, escrow instructions, easements, deeds, leases and permits). 4. Review and approval of determination of value, established by the project appraisers, and provide written authorization prior to offer being made to property owners. 5. Payment of any and all compensation payments to property owners, recording fees, relocation payments, legal services and any incidental costs which may arise necessary to complete each transaction. �54 c o b E � P w O u 41 No. Tax Parcel No Taxpayer/ Owner Current Use .R N u wE E ' c i CL N E � E Ou d CL 0 2 292305-9110 West,James L.etal Towing Company X X X X 3of3 *ftw *4404, February 19, 2015 EXHIBIT B City of Renton SW 43rd St/SE Carr Rd -SE 176th St/SE Petrovitsky Rd Corridor Safety Improvements Consultant Fee Determination Sub-Task B West and Sons Towing Offer DIRECT SALARY COSTS(DSC) Personnel Hours Rate Cost 1 Quality Assurance 3 X $52.00 = $ 156 2 Project Manager 14 X $42.00 = $ 588 3 Acquisition Specialist 11 X $38.00 = $ 418 4 Relocation Specialist 0 X $38.00 = $ - 5 Sr Administrative Specialist 3 X $29.00 = $ 87 Total Hours 31 Subtotal Direct Salary Costs(DSC)= $ 1,249 Overhead(OH) 48.09% of(DSC+SE)= $ 601 Fixed Fee(FF) 30% of(DSC+SE)= $ 375 TOTAL DSC= $ 2,224 DIRECT NONSALARY COSTS(DNSC) Mileage 60 miles @ $ 0.575 $ 35 Miscellaneous Expenses(see note 4 below) $ 100 TOTAL(DNSC)= $ 135 SUBCONSULTANTS Appraisals(none) Appraisal Reviews(1 each) The Granger Company $ 900 Administrative Fee 2.0%(B&O Taxes, etc.) $ 18 TOTAL SUBCONSULTANT FEES= $ 918 Outstanding invoices for additional work(see Note 6) $ 918 TOTAL ESTIMATED AMOUNT = $ 4,195 Notes: 1.) Universal reserves the right to re-negotiate estimate total if Notice to Proceed not provided within 180 days from the date of this estimate. 2.) Mileage to be billed at$0.575/mile or the approved IRS rate at the time mileage is incurred. 3.) See Table A in the Scope of Work for list of parcels impacted and the real property rights to be acquired from each. 4.) Reimbursable miscellaneous expenses including but not limited to, mapping, photos, postage, parking printing, long distance telephone, etc., at cost-no markup. 5.) It is assumed federal funds are participating in the right of way acquisition phase. 6.) Additional work is listed in the Scope of Work. 1%W 1,1111111111110" February 27,2015 City of Renton SW 43rd St SE Carr Rd -SE 176th St/SE Petrovitsky Rd Corridor Safety Improvements Right of Way Services-Estimated Hours and Mileage Sub-Task B West and Sons Towing Offer Rights to be Acquired Negotiation Hours Relocation Hours Penn Tom Pn PM Neu Admin 's' Sidewalk& I Reconstruction ... 10111-04, L PAID Utilly Es" Pe No. Tax Pcl No. Owner Current Use Simple rnilt East typo 2 292305-9110 JW Towing Company X X X X 2 10 10 2 60 Complete 1 monthlymonthlyprogress reports 0 1 1 1 Attend up to 2 telephone Progress Meetings 0 2 0 0 0 Prepare sub-consulant agreements;management of 0 0 0 1'rotal Hours&Mileage 7�a"�j 11-4 —11-1--3 60 1 0 1 0 1 0 1 0 1 0 Payment of unpaid invoices for aditional work-$918 2