Loading...
HomeMy WebLinkAboutCO 6 CAG-14-090, CO #6-15 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG-14-090 SW 7th St/Naches Ave SW Storm System Improvement C.O.# 6 Project—Phase 1 CONTRACTOR: Road Construction Northwest, Inc. SUMMARY OF PROPOSED CHANGE: Contract Expiration Date Extension The contract expiration date in the City Clerk's records was set by the City's Contract Checklist as December 31,2015. The contract expiration date is a date that the City expects that all physical and paperwork for a project will be completed. It is not the same as the contract working days. The project is considered substantially complete and working days are no longer being tracked. The only construction work remaining is to complete the reconstruction and testing of the irrigation system. That work is expected to be completed in January 2016. After all work is completed it may take three to four months (about May 2016)to process the Final Pay Estimate,complete project acceptance,and to receive all state releases for the retainage. This change order changes the contract expiration date in the City Clerk's records to December 31, 2016. There are no additional costs for this change order. There are no additional working days for this change order. TOTAL CHANGE ORDER COST= $0.00 Additional Working Days added to the Contract for this Change Order: none ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $1,975,032.00 $2,092,720.04 $0.00 $2,092,720.04 SIGNATURES: Contractor: 4 e' Jeffrey M. Kanyer/President Date: 12—S•" -j S Project Engineer: ^ Date: /2- 71.5 Approved By: / 4 i Date: Oil s Director) �} / Approved By: 9�� � �WM in stator) Date) // H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3570 Hardie Ave-SW 7th\1604 Change Orders\2015-1400 C0-6 DRAFT SW 7th-Time Extend.doc\OCtp