Loading...
HomeMy WebLinkAboutCO 1 CAG-14-151, CO #1-16 CITY OF RENTON CONTRACT CHANGE ORDER AGREEMENT NO. _ 1 Project Title: SW Grady Way Overlay Project CAG-14-151/Fed Aid#STPUL-1 288(004) Contractor Name and Address: Lakeside Industries,Inc. Attn:Craig Nickel,Project Manager 18808 SE 256th Street Covington,WA 98042 The Contractor is hereby directed to make the changes to the Contract as descriibed.herein. This document and all attachments are a supplement to the contract. Allwork,materials and measurements for the type of construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order. Summary of Proposed Changes: After meetings with the designer,concrete subcontractor&electrical subcontractor it was determined the ramps could not be constructed with the monolithic pour as indicated in the plans.This change drastically increased the necessary time for survey and layout,along with the concrete installation. The curb and gutter had to be installed first to establish the elevation control points fiat the pedestrian push button pole bases. Once these were installed, then the ramps and sidewalk could be completed. This required sequence of events needed 3 separate concrete pours at each ramp location. Lakeside is requesting additional working days for each ramp at no cost.This request meets the criteria of section 1-08.8 part Sa; "In Section 1-04.4 if a change increases the time to do any of the Work including unchanged Work.". Section 1-04.4 part 4"Altering the way the Work is to be done."addresses this specific situation. The Contract time is extended by 17 days. Sales Item Sch. Sec.No. Item Description Quantity Units Unit Price Total Price Tax (+1-) ($) (+/-) (Y/N) COI 1-08.5 Time Extension 1 $0.00 $0.00 N - -. - -- 1---- _ Subtotal $0.00 Washington State Sales Tax(8.8%)on applicable items $0.00 TOTAL $0.00 Base Amount Taal niter.T 1. Total Cast this CIQ _ $000 10,00 2. total Cost Previous co $0000 ;t%0o 3. Original Coosa Amount $ 84733 50 y 3 . 847„338.50 4. Raved Contract Amount $ 841.338.50 $ 84733850` This change order constitutes lull and complete compensation for all labor,equipment,materials,overhead,profit,any and all indirect costs,and time adjustment to perform the above described changes. AIS other costs are non compensible. Contractor: ctA; `� •{ ►` `a0i'S Resident Engineer„ ,, nl% g rr$e10 PrO jWr M 1101? I �� / 2 p ens i /VI fruitier: 4l!' • , Debt i f� Pw /+d l' i u-i & rerrnr ✓. 6 FLAKESIDE iNDUSTRIESINC. KENT DIVISION November 11,2015 Ronnie Bennett Senior Construction Manager 1019—39t1 Avenue SE,Suite i Puyallup WA 98374 Re: SW Grady Way Overlay Project Extension of Time Lakeside Industries requests an extension of time for this project per WSDOT specification 1-08.8. After meetings,with the designer,concrete subcontractor& electrical subcontractor it was determined the ramps could not be constructed with the monolithic pour as indicated in the plans. This change drastically increased the necessary time for survey and layout,along with the concrete installation. The curb and gutter had to be installed first to establish the elevation control points for the pedestrian push button pole bases. Once these were installed,then the ramps and sidewalk could be completed. This required sequence of events needed 3 separate concrete pours at each ramp location. Lakeside is requesting an additional 1.5 working days for each ramp;this totals an additional 24 working days. This request meets the criteria of section 1-08.8 part 5a;"In Section 1-04.4 if a change increases the time to do any of the Work including unchanged Works'. Section 1-04.4 part 4"Altering the way the Work is to be done" addresses this specific situation. While this delay was originally discussed in mid June,when direction was given by the City of Renton not requiring the monolithic pour;Lakeside is now submitting a formal request for an extension of time. Please contact me withany questions, Sincerely, Craig Nickel Project Manager 18808 S.E.2561 Street,Covington,WA 98042 (206)343-7375 •(253)630-2011/FAX AN RQJAL fNPOR71iN1TY EMPLOYER•WA.Sr.CONT.MEG.NO, L.KBSD2741D •OR CCB 108542