Loading...
HomeMy WebLinkAboutCO 11 r.r+ CAG-13-015 , CO #11-14 CHANGE ORDER # 11 AIRPORT.-Renton Municipal Airport DATE: 12-02-13 LOCATION:Renton,Washington GRANT#.3-53-0055-024 CONTRACTOR:ICON Materials CAS IZ--0\j' This change order was prepared in accordance with FAA Program Guidance Letter 12-03.A price analysis was prepared and it is recommended that the FAA accept the analysis as evidence of cost reasonableness. You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer: Item Description Unit Unit Price Quantity Amount Add Bid Item CO-11-1 (Manual 1 Low Step Control Modification) LS $2,078.57 1 $2,078.57 Subtotal $2,078.57 State Sales Tax(9.5%) $197.46 This Change Order Total $2,276.03 Previous Change Order Amount $464,605.61 Original Contract Amount $5.460.424.21 Revised Contract Total $5,927,305.85 Recommended by.• Date: -' ngineer, Reid Middleton, Inc. Approved by x I 'r: Date: Owner, ity of Rent n' l3Accepted by: V I�---� � `�� Date: 12-- +` Contractor, ICON Mate also I- L Accepted by: Date: f ral Aviation Administration { Taxiway Construction'Change Orders`CO I Ix.docx N.s✓ CHANGE ORDER # 11 AIP PROJECT NO. 3-53-0055-024 AIRPORT Renton Municipal Airport LOCATION Renton, WA JUSTIFICATION FOR CHANGE This justification for change was prepared in accordance with FAA Program Guidance Letter 12-03 1. Brief description of the proposed contract change(s) and locations(s). This change order consists of the following: 1. Add Bid Item CO-I 1-I "Manual Low Step Control Modification"for electrical revisions as depicted on revised plan sheet E4.4 and new plan sheets E4.5,E4.6, and E4.7. Design Directive#11 (attached)was issued on September 9, 2013 documenting these revisions. 2. Reason(s) for the change(s) (Continue on reverse if necessary). During construction of the Taxiway `B' Rehabilitation—North Portion Reconstruction project, the electrical subcontractor(Colvico) for that project determined that the existing electrical system was not progressing properly through the steps of light intensity for the airport edge lights. Change Order#7 (attached) for that project(FAA approval date of August 6,2013) directed Colvico to perform a troubleshooting exercise to determine existing wiring conditions of the electrical system. Because the time remaining in the North Portion construction project did not allow for Colvico to perform corrective measures and because the South Portion project contained a bid item for Airfield Control Modification,Airport staff decided that Colvico's troubleshooting findings would be implemented as part of the South Portion project by the contractor's electrical subcontractor(Innovative). 3. Justifications for unit prices or total cost: Justification was prepared in accordance with FAA program guidance letter 12-03. 4. The sponsor's share of this cost is available from: Port Funds 5. If this is a supplemental agreement involving more than$2,000, is the cost estimate based on the latest wage rate decision? Yes No NA X 6. Has consent of surety been obtained? Yes Not Necessary X 7. Will this change affect the insurance coverage? Yes No X Taxiway Construction\Change Orders\CO I 1 x.docx +r✓ 8. If yes, will the policies be extended? Yes No X 9. Has this Change Order been discussed with FAA Officials? Yes X No When 11/14/13 With Whom Peter Doyle a Taxiway Construction\Change Orders\CO I Ix.docx '44WW wi Renton Airport Change Order Cost Analysis/Backup for Taxiway B System Rehabilitation—South Portion Change Order##11 This cost analysis is prepared in compliance with Program Guidance Letter 12-03. Comparative costs have been taken from bid prices for other projects,from construction cost guides and from quotes from suppliers. The quantities to complete each of the activities listed below are small in comparison to the quantities for a typical project,therefore unit prices for the items listed will be higher than expected for a large quantity. 1) Add"Manual Low Step Control Modification" bid item This activity consists of the following tasks. • Add "Manual Low Step Control Modification" The cost for the proposed addition of"Manual Low Step Control Modification"was reviewed by the electrical designer and determined to be fair and reasonable. See attached email from electrical designer dated November 26, 2013. The net increase for addition of"Manual Low Step Control Modification"from ICON Materials $2,276.03 Conclusion: The requested change order amount is a fair and reasonable estimate for adding"Manual Low Step Control Modification". H:doc/23ap/10/007 Renton TW B&SignagePsouth Taxiway Constr/Change Orders/Renton COM Cost lustification.doc.mjc Mike Creeden From: Dean Ralphs <DRalphs@elcon.com> Sent: Tuesday, November 26, 2013 2:06 PM To: Mike Creeden Cc: Kurt Addicott Subject: RE: Renton AP -TW 8 South; FW: Design Directive#11 Cost Proposal Mike, Costs look appropriate to me. Dean Ralphs " 206-267-3047 From: Mike Creeden [mailto:mcreeden@reidmiddleton.com] Sent: Monday, November 25, 2013 3:08 PM To: Dean Ralphs Cc: Kurt Addicott; Mike Creeden Subject: Renton AP-TW B South; FW: Design Directive #11 Cost Proposal Dean, Attached for your review and response is the Cost Proposal from ICON and Innovative Electric to perform the Manual Low Step Control Modifications as described in Design Directive#11 dated September 9,2013. If you find this proposal acceptable,we shall proceed with preparing the Change Order for this work. Thank you. Michael J. Creeden, PE Project Engineer Reid Middleton 728 134th Street SW, Suite 200 Everett, WA 98204 (425)741-3800 (main) (425) 741-3900 (tax) (425) 741-5005 (direct) www.reidmiddleton.com Engineers I Planners I Surveyors From:Coffey,Chuck(ICON,OMG Northwest) [mailtoxcoffey@oldcastlemate ria ls.com] Sent: Monday, November 25,2013 1:40 PM To: Mike Creeden Cc:gunnarC@innovative-electric.com Subject: Design Directive#11 Cost Proposal Mike, 1 *saw DESIGN DIRECTIVE DD Number. 11 Owner. Renton Municipal Airport Contract No. 3-53-0055-24 Contractor. ICON Materials Engineer. _Reid Middleton,Inc. Engineer's File No.: 232010.007.005 Project: Taxiway B System Rehabilitation-South Portion Reconstruction DIRECTIVE { Specification Section: Para:_ Drawing Ref. E4.4.E4.5.E4.6 and E4.7 Detail: 1 Plan Sheet E4.4(revised)and sheets E4.5,E4.6,and E4.7(new)depict modifications to control wiring in the Air Traffic Control Tower for operation of the airfield electrical systems. The design is revised as follows(see'attached sheets): • Delete investigation and field design for implementation of the Taxiway B 10 step control via radio. Controls are fully as-built • Add new wire connections and switch label replacement in the Tower cabinet for enabling manual Taxiway B 10 step control from the L-821 control panel. Bid item quantity adjustments per schedule will be reconciled as part of progress estimate adjustments. Contractor shall submit intended adjustments to individual bid items for reconciliation with engineer. Signed by tittdla 2lCYe de4l/ Date 9/09/13 F CONTRACTOR RESPONSE (Select ane) _____ -- No Cost Change Order _ Change Order with Cost Adjustment Anticipated E � 1 Response from: Date Returned: 13 Attachments --" h:doctformslconstructionVzone est for interpretation.doc cc: Owner ICO ,, ,,ials , 1508 V a#eatine Ave. SE Pacific IVA 98047 (206) 575-3200 0 Fax (206) 575-0319 JftiaQuote vnnv iconmateriakcom Xt!].aasvcwt•tnee Cae..c•ec, Cost Detail with Categories Project Name: Renton Airport Taxiway"B" Customer. City Of Renton Job Number: 513302 Billing Address: 3555 NE 2ND STREET Bid As: PR1ME Renton,WA 98056 Estimator: David Gent Phone: 425-430-7400 Project Address: Renton,WA Contact; Completion Date: Items Unit Total Description Quantity UM Direct Cost Direct Cost Unit Price Total Price MU% 808-Design Directive#11 1,00 LS $1,855.87 Manual Low Step Modifications #1,855.87 $2,078.57 $2,078.57 12.00% Labor Equipme Material Sij¢contracted Trucking Miscellaneous pig Unit: $0.00 $0.00 $0.00 $1,855.87 $0.00 $0.00 $0.00 Total: $0.00 $0.00 $0.00 $1,855.87 $0.00 $0:00 $0.00 CEC-11/25/20131:27 PM: DD#II Cost$1855.87 ICON Allowed Markup on subcontracted work 12%=$222.70 Total cost for DD#11=$2078.57 Sj Innovative Electric 1.00 LS $1,855.87 $1,855.87 30bCostlD: 50.460 11/25/2013 1:30:16 PM Page 1 of 2 7 Percent of ` Amount Direct Cost Labor. $0.00 0.000/0 Equipment Owned: $0.00 0.00% Equipment Rented: $0.00 0.00% Materials Owned: $0.00 0.00% Materials Purchased: $0.00 0.00% Subcontracted: $1,855.87 100.000/0 Trucking Owned: $0.00 0.000/0 Trucking Hired: $0.00 0.00% Miscellaneous: $0.00 0.00% Plug: $0.00 0.00% Direct Cost: $1,855.87 Percent of Amount Bid Price 7Total Direct Cost: $1,855.87- 89.29% Total DCAdds/Cuts: $0.00 0.000/0 Total Indirect Cost: $0.00 0.000/0 Total Bond: $0.00 0.00% Total Overall Cost: $1,855.87 89.29% Total Overhead: $0.00 0.00% Total Profit: $222.70 10.71% Total Margin: $222.70 10.71% Total Bid,Price: $2,078.57 11/25/2013 1:30:16 PM Renton Airport Ta)away"E' Page 2 of 2 V*N.r 1"✓ lNNOVAYIVE vozs2so-ooa9 E i 433.396.1909 fi0.6oX 4999 CVCRCTf.WA 90204 OLIM�COCIw�. LINUU<1 MIAL I�INOVATIYC-C I.CCTOIC.CON i TO:ICON Materials DATE:September 21,2013 ADDRESS:1508 Valentine Ave.SE CITY&STATE:Pacific.WA 88047 PHONE:206-574-3906 ATTN:Chuck Coffey EMAIL.:ccoffey@oldcastlematerials.com JOB.City of Renton Taxiway B System Rehabilitation South Portion Reconstruction AIP No.3.53-0055-024 PROJECT NO: 0001-2013 Design Directive 911 Manual Low Stop Control modifications. Labor Hours 17_75 Hours @ $66.38 51.178.25 Labor markup 29% $341.69 Material Costs $203.76 Material markup 21% $42.79 Permit Costs $0.00 Sub contract work $0.00 Prime Cost Total Subtotal $1.766.49 Small Too[AIIowance 2%of sub total SS S35.33 Sub-Total $1,801.82 Bonds,Permits,Ins. %of TOTAL 3.00% $54.05 Sates tax 0.0% $0.00 TOTAL PRICE FOR THIS CHANGE $1,865.87 LABOR AND MATERIAL BREAKDOWN FOR THIS CHANGEORDER DESCRIPTION MATERIAL LABOR EACH TOTAL Demolish existing controls for 7M CCRS $0.00 3.5 Verify and label all existing control wires $26.85 4 Decommission K2 Relay $0.00 0.4 Remove Kt relay and all correcting wires $0.00 0.5 Demolish existing taxiway control relay $0.00 0.25 Restore coil connection to TB3 $0.00 0.1 Remove existing terminal strip 50.00 0.5 Vedry REIL remains operable on B100 8 tower $0.00 0.5 Provide new conduit between wire way $8.35 0.8 Provide new relay and socket and wire $67.60 2.25 Provide new terminal strip and labels $45.66 1.2 Replace step label with new $25.30 0.5 Modify tower controls In cab $5.00 1.25 Mobilize $25.00 2 Total new controls $203.76 17.75 ■:Wn-msnW.f.y,a1+.J1 a-ae-ts oenm uw« f�."„"'�ti�^�1•�•ti�-r1ti1�^'r1"'�•'•..11�"��.ti1.\•"`.�"�.�"�-^•..'r.\-��.��1'�•1�...�,1.1.1.1-�.11.�."'`-1�.�.\^1•'1-•�^�.�•'�..�11�"v� • R s R � R ) I R ER as W 23 aR ) en tel € E a s k I.t im — Ct4 S• ) ex iii E ) I R 8 B O s m its R s ) i M im } Mk x S it it 3 e 1 eywi ! a 4 w 107 ) x R .n 113 )1 m I s k 8 w In s O as >M txz fn � # 3 R R :I r w4m x I GK-1K I r4 ) I t c I TJ R - I � i R Cie) ) 0f loll a 1 feel 11 1 ! ) j CSY OF IMMM-KWm mt^CPAL AjrMe 3 1/13 pt CaKPW MaDM T" Z SOUTH TAXIWAY 8 SYSTEM REHA81 rxnON [ ELOON o ' t Aur 3ksE R•Li aD i. �'+°^ CONTROL DIAGRAMS 5�a�� +,�•�,� i I' kmm-M k�lM]-6)0.mWRrW�'Jt 9-M-ll 0!.%sn Yrsn r-�•�.1�\.-�'�.\•'�^v1"Y\\1�•Y'1'ti1\-^vim•\.•\"�.\1^�.\'1�\�\•\\��\•\.\'\�•��1.\•ti\^.�11�\.�•\.1\•"�1•1.-��\.��•\.\...��1'\•Y1�\� I ! ! sr a E f ■ 9 � i , , � t . I E_ R a Z ¢ a 2 I 1 � I �I a a j 3 ( 8 al !3� ! # R 84 cti w tss ) w]et } w tm f!E � M t14 J �• w to >R } O- wnc E s E su w too — � g w to j w ns s! a E i aE a w w] 2 R w 113 ..m 7 f V� w ts y as w to!7 3 ) i $U/AK a3 e m $ I oyrt . I a4 tlE st 1 i x F t pylic C 8 g J a f I ! I ( 1 I } ! I � I i } 1 I } ! ! J I• ! I ! 1 i ! } ! I 4 .•p J I o � EliI f vv zu Au 100 a t f € cm'of MW-WMM WNICrk MrORf R ] Sj1�DII 07ORMS MODWATan $ SOUTH TAXIWAY B SYSTEM REHASIUTAT)ON � € A tte.a>EwSmPC GM=.E ,- 1 CONTROL DIAGRAMS im uw%w sr•siA %64%.mm 1 At 43 -M R\SNI-W601V.MW_W./t f-OS-AS 6k�M. YY�. \•"'�.\1.1\•1'\•1'\•1.11"'X11.-�1•\•\1'\-\.�•\.1'^�.'\.�'•r'�-�.'\�•1�\1'^.ti•\\-ti ..1\•'\'�•\.-..-�.\ �-1-�'•�\\-�"'�-'Y-�•\-'�•\1�-1 I � } ) R t Ex j a 1 f } • w,m j 115ft1 E# F } # s# g w„a a E !^!fin F -•— s b g# � # f i avat _ $ R 1 � I o • s { I } I i I I ) L------ —J # R # $ cm { I Cs 3 I I s " I I ( i f ( I j G I s v a vv N SRA I it Hf I O arc cF mm)m-wm)N►uecrx ANWM . , ,,,) m,Ma,s MODFCATM F SOUTH TAXIWAY E! SYSTEM REHABILMATION EkCDN cru arn ) iurna.�rs4a.A. _ f :P. $Q CONTROL DUtGRA►AS �4i.xw a ! rn ; kraa,-M 1. �w FC�l06)-0XDI�,tV.t�N)JI hM-1] Qkt}IT Ya�N K -BLACK su -BLUE " cr _GREY OR -DWwGE 78) -RED V N -VCLEE TM -WHR 11100 x -TEUDW (Km} ES00 810 % .. WKFE SWE h K 0m K K h K IN % S 2 i ♦ ] 2 1 j RR ]@520, W32=1I •.� 10-310-31"m7IPA ivR ORyO-M ,0-70-t'o %y 8 S s 6 5 a 1 K K tQ K K O 840 L s f p� 1 FHamcmL K AD 08/OFT % K % K K c 1 % K K FA FOSS M f8R to j 1166 Lao NLT 4WE �• (N0,IRED} rMt]a K K K 1D K Po K 110 K t 7}j L-W CWMM NY41 CDV.N FIRM MMM FU&MZNQ I Wk 5112 GNtE i7(ti CABLE avc 1 14 cl INK 1 ifI 1E2 } Eli tf No K K 21 EV in E]e e0/m am a fm Et0o38 x % K y K NK BLD x K K 12M K t � IX S K 54 K R M On 8U K C lkOc lOLW ti ,m It K ]C 57 8D SE ! E4 1111 eU x SE ( of K K K K K i) Ml]/811 W K Y ]V eY p8 K 118[ K 71 air $ Et06 8100 x f( K „ a K 7E p 1/ 7C /( f KMI 8o K ' f K 111 K E _ 1 fI1 ux m EI L NOTESy r I. 5II ELt Ea.f Pott mmWtx �E, r 1 L-021 CWTIM PAND 6 tOCA]m MAP 0� Pi WIC C.MBti TAU CAN. W KEYED NOTES: Is gamD6 MD MIN:.fER m m S!7 g • , wii L ON 8 O0 in mic foo. SID COMM SM1�Ol m r Si 1 (a fu1xE tLaKT sm WrFnmL saml LAND. S S K Www WF1N Mc Ors{p8g sm1 L-821 WIRING DIAGRAM 1 six 1a522 WFC p 1D-ri,OD t2LOM0} SMALL. Mrs K� `1 F • E 2 CfPE OF IENM-NNW U1ffCPX M rOkT f H ON ASSOCIATE.INC S`E/is oft COwns t100E1C TIEW S SOUTH TAXIWAY 8 SYSTEM REHABUUTATION ENca+Ees-c�rslLTua]s } L-821 WIRING DIAGRAM Um N-Sh a # v } Bit 0 141-30 •c CHANGE ORDER # 7� AIRPORT. Renton Municipal Airport DATE:7-24-13 LOCATION:Renton,Washington GRANT#:3-53-0055-023 CONTRACTOR:ICON Materials This change order was prepared In accordance with FAA Program Guidance Letter 12-03.A price analysts was prepared and It Is recommended that the FAA accept the analysis as evidence of cost reasonableness. You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer. Item# Description Unit Unit Price Quantity Amount Inspection and Testing of Existing Radio 1 Controls to Tower L.S. $4,210.10 1 $4,210.10 Subtotal $4,210.10 State Sales Tax(9.5%) $399.96 This Change Order Total $4,610,06 Previous Change Order Amount $71,905,06 Original Contract Amount $2,364.463,61 Revised Contract Total $2,440,978.73 Recommended by. Date:Z Z-�' �l En eer, eld Middleton, Inc. Approved by., Date:_7_ 30 (3 Owner,C t n L Accepted by _ Date: Contractor, ICON rials Accepted by. Date: 6 F rat Aviation Administration K DOCk23ApM1007 Penton 7W8 a Sipagel'Noat,Taxiway Const\Change Orders\CO 7.docx CHANGE ORDER# 7 AIP PROJECT NO. 3-53-0055-023 - AIRPORT Renton Municipal Aimort LOCATION_Renton, WA JUSTIFICATION FOR CHANGE This justification for change was prepared in accordance with FAA Program Guidance Letter 12-03 1. Brief description of the proposed contract change(s)and locations(s). This change order consists of the following: During installation of the new Taxiway B.edge light system,the electrical subcontractor determined that the existing electrical system was not progressing properly through the steps of light intensity for the airport edge lights. At the Airport's request, the electrical subcontractor, with the assistance of a local ADB technician, reviewed the electrical operations.of Runway 16/34, Taxiway A,and Taxiway B to determine the cause of this improper operation. This troubleshooting exercise was performed over parts of 4 days. This change order addresses the Iabor to perform the troubleshooting exercise and requests a 2 calendar day time extension. 2. Reason(s) for the change(s) (Continue on reverse if necessary). See#I above. 3. Justifications for unit prices or total cost: Justification was prepared in accordance with FAA program guidance letter 12-03. 4. The sponsor's share of this cost is available from:Port Funds 5. If this is a supplemental agreement involving more than$2,000, is the cost estimate based on the latest wage rate decision? Yes No NA X ' 6. Has consent of surety been obtained? Yes Not Necessary X 7. Will this change affect the insurance coverage? Yes No X 8. If yes, will the policies be extended? Yes No X 9. Has this Change Order been discussed with FAA Officials? Yes X No When 07/24/13 With Whom Peter Doyle R-00C123ApS10007 Renton 7W B&Signaget'Nodh Taxiway Const\Change Orders\CO 7.docx Renton Airport ,*„l *ars'` Change Order Cost Analysis/Backup for Taxiway B System Rehabilitation—North Portion Reconstruction and Airfield Signage Modifications Change Order#7 'This cost analysis is prepared in compliance with Program Guidance Letter 12-03. Comparative costs have been taken from bid prices for other projects,from construction cost guides and from quotes from suppliers. The quantities to complete each of the activities listed below are small in comparison to the quantities for a typical project,therefore unit prices for the items listed will be higher than expected for a large quantity. 1) Inspection and Testing of Existing Radio Controls to the Tower This actiVity consists of the following tasks. • ADB Technician A'techniclan from ADB assisted Colvico with performing the troubleshooting activities over parts of 4 days. The technician spent a total of 13 hours on this task. The technician incurred allowable expenses for travel,tools and supplies, coordination,and equipment. Typical cost for this activity would be expected to range between$1,500 and$2,000. The ADB technician's portion of cost for troubleshooting is$1,727.63. • Colvico Electrician A Colvico electrician performed troubleshooting activities.over parts of 4 days. The electrician spent a total of 15 hours on this task. The electrician incurred allowable expenses for coordination and equipment. 'Typical cost for this activity would be expected to range between$1,700 and$2,300. Colvico's portion of cost for troubleshooting Is$2,031.39. Inspection and Testing of Existing Radio Controls to the Tower change order price from ICON Materials (including allowable mark-ups) $4,210.10 -Conclusion: The requested change order.amount is a fair and reasonable estimate for inspecting and testing radio controls to the tower. H.doc/23ap/10/007 Renton TW 8&Signage/Worth Taxiway Constr/Change Orders/Renton CO#7 Cost lustiflcation.docmJc