CHANGE ORDER # 11
AIRPORT.-Renton Municipal Airport DATE: 12-02-13
LOCATION:Renton,Washington GRANT#.3-53-0055-024
CONTRACTOR:ICON Materials CAS IZ--0\j'
This change order was prepared in accordance with FAA Program Guidance Letter 12-03.A price
analysis was prepared and it is recommended that the FAA accept the analysis as evidence of cost
reasonableness.
You are requested to perform the following described work upon receipt of an approved copy of this
document or as directed by the Engineer:
Item Description Unit Unit Price Quantity Amount
Add Bid Item CO-11-1 (Manual
1 Low Step Control Modification) LS $2,078.57 1 $2,078.57
Subtotal $2,078.57
State Sales Tax(9.5%) $197.46
This Change Order Total $2,276.03
Previous Change Order Amount $464,605.61
Original Contract Amount $5.460.424.21
Revised Contract Total $5,927,305.85
Recommended by.• Date: -'
ngineer, Reid Middleton, Inc.
Approved by x I 'r:
Date:
Owner, ity of Rent n'
l3Accepted by: V I�---� � `�� Date: 12-- +`
Contractor, ICON Mate also
I-
L
Accepted by: Date: f
ral Aviation Administration
{
Taxiway Construction'Change Orders`CO I Ix.docx
N.s✓
CHANGE ORDER # 11
AIP PROJECT NO. 3-53-0055-024
AIRPORT Renton Municipal Airport LOCATION Renton, WA
JUSTIFICATION FOR CHANGE
This justification for change was prepared in accordance with FAA Program Guidance
Letter 12-03
1. Brief description of the proposed contract change(s) and locations(s).
This change order consists of the following:
1. Add Bid Item CO-I 1-I "Manual Low Step Control Modification"for electrical
revisions as depicted on revised plan sheet E4.4 and new plan sheets E4.5,E4.6, and
E4.7.
Design Directive#11 (attached)was issued on September 9, 2013 documenting these
revisions.
2. Reason(s) for the change(s) (Continue on reverse if necessary).
During construction of the Taxiway `B' Rehabilitation—North Portion Reconstruction
project, the electrical subcontractor(Colvico) for that project determined that the existing
electrical system was not progressing properly through the steps of light intensity for the
airport edge lights. Change Order#7 (attached) for that project(FAA approval date of
August 6,2013) directed Colvico to perform a troubleshooting exercise to determine
existing wiring conditions of the electrical system.
Because the time remaining in the North Portion construction project did not allow for
Colvico to perform corrective measures and because the South Portion project contained
a bid item for Airfield Control Modification,Airport staff decided that Colvico's
troubleshooting findings would be implemented as part of the South Portion project by
the contractor's electrical subcontractor(Innovative).
3. Justifications for unit prices or total cost:
Justification was prepared in accordance with FAA program guidance letter 12-03.
4. The sponsor's share of this cost is available from: Port Funds
5. If this is a supplemental agreement involving more than$2,000, is the cost estimate based
on the latest wage rate decision? Yes No NA X
6. Has consent of surety been obtained? Yes Not Necessary X
7. Will this change affect the insurance coverage? Yes No X
Taxiway Construction\Change Orders\CO I 1 x.docx
+r✓
8. If yes, will the policies be extended? Yes No X
9. Has this Change Order been discussed with FAA Officials?
Yes X No When 11/14/13 With Whom Peter Doyle
a Taxiway Construction\Change Orders\CO I Ix.docx
'44WW wi
Renton Airport
Change Order Cost Analysis/Backup for Taxiway B System Rehabilitation—South Portion
Change Order##11
This cost analysis is prepared in compliance with Program Guidance Letter 12-03. Comparative costs
have been taken from bid prices for other projects,from construction cost guides and from quotes from
suppliers. The quantities to complete each of the activities listed below are small in comparison to the
quantities for a typical project,therefore unit prices for the items listed will be higher than expected for
a large quantity.
1) Add"Manual Low Step Control Modification" bid item
This activity consists of the following tasks.
• Add "Manual Low Step Control Modification"
The cost for the proposed addition of"Manual Low Step Control Modification"was reviewed by the
electrical designer and determined to be fair and reasonable. See attached email from electrical
designer dated November 26, 2013.
The net increase for addition of"Manual Low Step Control Modification"from ICON Materials
$2,276.03
Conclusion: The requested change order amount is a fair and reasonable estimate for adding"Manual
Low Step Control Modification".
H:doc/23ap/10/007 Renton TW B&SignagePsouth Taxiway Constr/Change Orders/Renton COM Cost lustification.doc.mjc
Mike Creeden
From: Dean Ralphs <DRalphs@elcon.com>
Sent: Tuesday, November 26, 2013 2:06 PM
To: Mike Creeden
Cc: Kurt Addicott
Subject: RE: Renton AP -TW 8 South; FW: Design Directive#11 Cost Proposal
Mike,
Costs look appropriate to me.
Dean Ralphs "
206-267-3047
From: Mike Creeden [mailto:mcreeden@reidmiddleton.com]
Sent: Monday, November 25, 2013 3:08 PM
To: Dean Ralphs
Cc: Kurt Addicott; Mike Creeden
Subject: Renton AP-TW B South; FW: Design Directive #11 Cost Proposal
Dean,
Attached for your review and response is the Cost Proposal from ICON and Innovative Electric to perform the Manual
Low Step Control Modifications as described in Design Directive#11 dated September 9,2013.
If you find this proposal acceptable,we shall proceed with preparing the Change Order for this work. Thank you.
Michael J. Creeden, PE
Project Engineer
Reid Middleton
728 134th Street SW, Suite 200
Everett, WA 98204
(425)741-3800 (main)
(425) 741-3900 (tax)
(425) 741-5005 (direct)
www.reidmiddleton.com
Engineers I Planners I Surveyors
From:Coffey,Chuck(ICON,OMG Northwest) [mailtoxcoffey@oldcastlemate ria ls.com]
Sent: Monday, November 25,2013 1:40 PM
To: Mike Creeden
Cc:gunnarC@innovative-electric.com
Subject: Design Directive#11 Cost Proposal
Mike,
1
*saw
DESIGN DIRECTIVE
DD Number. 11
Owner. Renton Municipal Airport Contract No. 3-53-0055-24
Contractor. ICON Materials
Engineer. _Reid Middleton,Inc. Engineer's File No.: 232010.007.005
Project: Taxiway B System Rehabilitation-South Portion Reconstruction
DIRECTIVE
{ Specification Section: Para:_ Drawing Ref. E4.4.E4.5.E4.6 and E4.7 Detail:
1 Plan Sheet E4.4(revised)and sheets E4.5,E4.6,and E4.7(new)depict modifications to control wiring in the Air Traffic Control
Tower for operation of the airfield electrical systems.
The design is revised as follows(see'attached sheets):
• Delete investigation and field design for implementation of the Taxiway B 10 step control via radio. Controls are fully
as-built
• Add new wire connections and switch label replacement in the Tower cabinet for enabling manual Taxiway B 10 step
control from the L-821 control panel.
Bid item quantity adjustments per schedule will be reconciled as part of progress estimate adjustments. Contractor shall submit
intended adjustments to individual bid items for reconciliation with engineer.
Signed by tittdla 2lCYe de4l/ Date 9/09/13
F CONTRACTOR RESPONSE (Select ane) _____ --
No Cost Change Order
_ Change Order with Cost Adjustment Anticipated
E � 1
Response from: Date Returned:
13 Attachments --"
h:doctformslconstructionVzone est for interpretation.doc
cc: Owner
ICO ,, ,,ials ,
1508 V a#eatine Ave. SE
Pacific IVA 98047
(206) 575-3200 0 Fax (206) 575-0319 JftiaQuote
vnnv iconmateriakcom
Xt!].aasvcwt•tnee Cae..c•ec,
Cost Detail with Categories
Project Name: Renton Airport Taxiway"B" Customer. City Of Renton
Job Number: 513302 Billing Address: 3555 NE 2ND STREET
Bid As: PR1ME Renton,WA 98056
Estimator: David Gent Phone: 425-430-7400
Project Address: Renton,WA Contact;
Completion Date:
Items
Unit Total
Description Quantity UM Direct Cost Direct Cost Unit Price Total Price MU%
808-Design Directive#11 1,00 LS $1,855.87
Manual Low Step Modifications #1,855.87 $2,078.57 $2,078.57 12.00%
Labor Equipme Material Sij¢contracted Trucking Miscellaneous pig
Unit: $0.00 $0.00 $0.00 $1,855.87 $0.00 $0.00 $0.00
Total: $0.00 $0.00 $0.00 $1,855.87 $0.00 $0:00 $0.00
CEC-11/25/20131:27 PM:
DD#II Cost$1855.87
ICON Allowed Markup on subcontracted work 12%=$222.70
Total cost for DD#11=$2078.57
Sj Innovative Electric 1.00 LS $1,855.87 $1,855.87 30bCostlD: 50.460
11/25/2013 1:30:16 PM Page 1 of 2
7 Percent of `
Amount Direct Cost
Labor. $0.00 0.000/0
Equipment Owned: $0.00 0.00%
Equipment Rented: $0.00 0.00%
Materials Owned: $0.00 0.00%
Materials Purchased: $0.00 0.00%
Subcontracted: $1,855.87 100.000/0
Trucking Owned: $0.00 0.000/0
Trucking Hired: $0.00 0.00%
Miscellaneous: $0.00 0.00%
Plug: $0.00 0.00%
Direct Cost: $1,855.87
Percent of
Amount Bid Price
7Total Direct Cost: $1,855.87- 89.29%
Total DCAdds/Cuts: $0.00 0.000/0
Total Indirect Cost: $0.00 0.000/0
Total Bond: $0.00 0.00%
Total Overall Cost: $1,855.87 89.29%
Total Overhead: $0.00 0.00%
Total Profit: $222.70 10.71%
Total Margin: $222.70 10.71%
Total Bid,Price: $2,078.57
11/25/2013 1:30:16 PM Renton Airport Ta)away"E' Page 2 of 2
V*N.r 1"✓
lNNOVAYIVE vozs2so-ooa9
E i 433.396.1909
fi0.6oX 4999
CVCRCTf.WA 90204
OLIM�COCIw�. LINUU<1 MIAL I�INOVATIYC-C I.CCTOIC.CON
i
TO:ICON Materials DATE:September 21,2013
ADDRESS:1508 Valentine Ave.SE
CITY&STATE:Pacific.WA 88047
PHONE:206-574-3906
ATTN:Chuck Coffey
EMAIL.:ccoffey@oldcastlematerials.com
JOB.City of Renton Taxiway B System Rehabilitation South Portion Reconstruction
AIP No.3.53-0055-024 PROJECT NO: 0001-2013
Design Directive 911 Manual Low Stop Control modifications.
Labor Hours 17_75 Hours @ $66.38 51.178.25
Labor markup 29% $341.69
Material Costs $203.76
Material markup 21% $42.79
Permit Costs $0.00
Sub contract work $0.00
Prime Cost Total Subtotal $1.766.49
Small Too[AIIowance 2%of sub total SS S35.33
Sub-Total $1,801.82
Bonds,Permits,Ins. %of TOTAL 3.00% $54.05
Sates tax 0.0% $0.00
TOTAL PRICE FOR THIS CHANGE $1,865.87
LABOR AND MATERIAL BREAKDOWN FOR THIS CHANGEORDER
DESCRIPTION MATERIAL LABOR
EACH TOTAL
Demolish existing controls for 7M CCRS $0.00 3.5
Verify and label all existing control wires $26.85 4
Decommission K2 Relay $0.00 0.4
Remove Kt relay and all correcting wires $0.00 0.5
Demolish existing taxiway control relay $0.00 0.25
Restore coil connection to TB3 $0.00 0.1
Remove existing terminal strip 50.00 0.5
Vedry REIL remains operable on B100 8 tower $0.00 0.5
Provide new conduit between wire way $8.35 0.8
Provide new relay and socket and wire $67.60 2.25
Provide new terminal strip and labels $45.66 1.2
Replace step label with new $25.30 0.5
Modify tower controls In cab $5.00 1.25
Mobilize $25.00 2
Total new controls $203.76 17.75
■:Wn-msnW.f.y,a1+.J1 a-ae-ts oenm uw«
f�."„"'�ti�^�1•�•ti�-r1ti1�^'r1"'�•'•..11�"��.ti1.\•"`.�"�.�"�-^•..'r.\-��.��1'�•1�...�,1.1.1.1-�.11.�."'`-1�.�.\^1•'1-•�^�.�•'�..�11�"v�
• R s R � R )
I R ER as W 23 aR )
en tel
€ E a
s k I.t im — Ct4 S• )
ex iii E )
I R 8 B O s m its R s )
i M im }
Mk x S
it it 3
e 1 eywi ! a 4 w
107 )
x R .n 113 )1
m I s k 8 w In s
O as >M txz
fn
� # 3 R R :I
r w4m
x I GK-1K
I r4 )
I
t
c I
TJ R -
I �
i
R
Cie) )
0f loll
a 1
feel 11
1
! ) j CSY OF IMMM-KWm mt^CPAL AjrMe 3 1/13 pt CaKPW MaDM T"
Z SOUTH TAXIWAY 8 SYSTEM REHA81 rxnON [ ELOON
o ' t Aur 3ksE R•Li aD i. �'+°^
CONTROL DIAGRAMS 5�a�� +,�•�,�
i I' kmm-M
k�lM]-6)0.mWRrW�'Jt 9-M-ll 0!.%sn Yrsn
r-�•�.1�\.-�'�.\•'�^v1"Y\\1�•Y'1'ti1\-^vim•\.•\"�.\1^�.\'1�\�\•\\��\•\.\'\�•��1.\•ti\^.�11�\.�•\.1\•"�1•1.-��\.��•\.\...��1'\•Y1�\�
I !
! sr a E f ■ 9 � i , , � t . I
E_
R a Z ¢ a 2
I
1 � I
�I a
a j
3 ( 8 al !3�
! # R 84 cti w tss )
w]et }
w tm f!E �
M t14 J
�• w to >R }
O- wnc E s
E su w too —
� g w to
j w ns s! a E i
aE a w w]
2 R w 113
..m 7 f V� w ts
y as w to!7
3 ) i
$U/AK
a3 e
m $ I oyrt . I a4 tlE st 1
i x F t pylic C 8 g J
a
f I
!
I ( 1
I }
! I �
I i }
1 I }
! ! J
I• !
I ! 1
i ! }
! I 4 .•p J
I o �
EliI f
vv
zu
Au 100 a
t f € cm'of MW-WMM WNICrk MrORf R ] Sj1�DII 07ORMS MODWATan
$ SOUTH TAXIWAY B SYSTEM REHASIUTAT)ON � € A tte.a>EwSmPC GM=.E ,-
1
CONTROL DIAGRAMS im uw%w sr•siA
%64%.mm
1
At 43 -M
R\SNI-W601V.MW_W./t f-OS-AS 6k�M. YY�.
\•"'�.\1.1\•1'\•1'\•1.11"'X11.-�1•\•\1'\-\.�•\.1'^�.'\.�'•r'�-�.'\�•1�\1'^.ti•\\-ti ..1\•'\'�•\.-..-�.\ �-1-�'•�\\-�"'�-'Y-�•\-'�•\1�-1
I � }
)
R t
Ex
j
a 1
f }
• w,m j
115ft1
E# F }
# s#
g w„a a E
!^!fin F -•— s b g#
�
# f i
avat _
$ R 1
� I
o
• s { I }
I i
I I )
L------ —J # R # $
cm
{ I Cs
3 I
I s "
I I
( i
f
( I j
G I s
v a vv
N SRA I it Hf I
O
arc cF mm)m-wm)N►uecrx ANWM . , ,,,) m,Ma,s MODFCATM
F SOUTH TAXIWAY E! SYSTEM REHABILMATION EkCDN cru arn )
iurna.�rs4a.A.
_ f :P. $Q CONTROL DUtGRA►AS �4i.xw a
! rn ; kraa,-M 1. �w
FC�l06)-0XDI�,tV.t�N)JI hM-1] Qkt}IT Ya�N
K -BLACK
su -BLUE "
cr _GREY
OR -DWwGE
78) -RED V
N -VCLEE
TM -WHR 11100
x -TEUDW (Km} ES00 810 %
.. WKFE SWE h K 0m K K h K IN %
S 2 i ♦ ] 2 1 j
RR ]@520, W32=1I •.�
10-310-31"m7IPA ivR ORyO-M
,0-70-t'o %y
8 S s 6 5 a 1
K K tQ K K O
840 L s f
p� 1
FHamcmL
K AD 08/OFT %
K %
K K c 1
%
K
K FA
FOSS
M f8R to j
1166 Lao NLT 4WE �•
(N0,IRED} rMt]a
K K K 1D K Po K 110 K
t
7}j
L-W CWMM NY41 CDV.N FIRM MMM FU&MZNQ I
Wk
5112 GNtE
i7(ti CABLE
avc 1
14 cl INK
1
ifI 1E2 }
Eli
tf No K K 21 EV in E]e e0/m am a
fm Et0o38 x %
K y K
NK BLD x
K K 12M K t
� IX S
K 54 K R M On 8U
K C lkOc lOLW ti ,m It
K
]C 57 8D SE ! E4 1111 eU x
SE ( of
K K K K
K i) Ml]/811 W K
Y ]V eY p8 K
118[ K 71 air
$ Et06 8100 x f(
K „ a
K 7E p 1/
7C /(
f KMI 8o K
' f K 111 K E
_ 1
fI1
ux m EI L NOTESy
r
I. 5II ELt Ea.f Pott mmWtx
�E, r 1 L-021 CWTIM PAND 6 tOCA]m MAP
0� Pi WIC C.MBti TAU CAN.
W KEYED NOTES:
Is gamD6 MD MIN:.fER m m S!7
g • , wii L ON 8 O0 in mic foo.
SID COMM SM1�Ol m
r Si 1
(a fu1xE tLaKT sm WrFnmL saml LAND. S
S K Www WF1N Mc Ors{p8g sm1
L-821 WIRING DIAGRAM 1 six 1a522 WFC p 1D-ri,OD t2LOM0}
SMALL. Mrs
K� `1
F
• E 2 CfPE OF IENM-NNW U1ffCPX M rOkT f H ON ASSOCIATE.INC S`E/is oft
COwns t100E1C TIEW
S SOUTH TAXIWAY 8 SYSTEM REHABUUTATION ENca+Ees-c�rslLTua]s }
L-821 WIRING DIAGRAM Um N-Sh a
# v } Bit 0 141-30 •c
CHANGE ORDER # 7�
AIRPORT. Renton Municipal Airport DATE:7-24-13
LOCATION:Renton,Washington GRANT#:3-53-0055-023
CONTRACTOR:ICON Materials
This change order was prepared In accordance with FAA Program Guidance Letter 12-03.A price
analysts was prepared and It Is recommended that the FAA accept the analysis as evidence of
cost reasonableness.
You are requested to perform the following described work upon receipt of an approved copy of this
document or as directed by the Engineer.
Item# Description Unit Unit Price Quantity Amount
Inspection and Testing of Existing Radio
1 Controls to Tower L.S. $4,210.10 1 $4,210.10
Subtotal $4,210.10
State Sales Tax(9.5%) $399.96
This Change Order Total $4,610,06
Previous Change Order Amount $71,905,06
Original Contract Amount $2,364.463,61
Revised Contract Total $2,440,978.73
Recommended by. Date:Z Z-�' �l
En eer, eld Middleton, Inc.
Approved by., Date:_7_ 30 (3
Owner,C t n
L
Accepted by _ Date:
Contractor, ICON rials
Accepted by. Date: 6
F rat Aviation Administration
K DOCk23ApM1007 Penton 7W8 a Sipagel'Noat,Taxiway Const\Change Orders\CO 7.docx
CHANGE ORDER# 7
AIP PROJECT NO. 3-53-0055-023 -
AIRPORT Renton Municipal Aimort LOCATION_Renton, WA
JUSTIFICATION FOR CHANGE
This justification for change was prepared in accordance with FAA Program Guidance
Letter 12-03
1. Brief description of the proposed contract change(s)and locations(s).
This change order consists of the following:
During installation of the new Taxiway B.edge light system,the electrical
subcontractor determined that the existing electrical system was not progressing
properly through the steps of light intensity for the airport edge lights. At the
Airport's request, the electrical subcontractor, with the assistance of a local ADB
technician, reviewed the electrical operations.of Runway 16/34, Taxiway A,and
Taxiway B to determine the cause of this improper operation. This troubleshooting
exercise was performed over parts of 4 days.
This change order addresses the Iabor to perform the troubleshooting exercise and
requests a 2 calendar day time extension.
2. Reason(s) for the change(s) (Continue on reverse if necessary).
See#I above.
3. Justifications for unit prices or total cost:
Justification was prepared in accordance with FAA program guidance letter 12-03.
4. The sponsor's share of this cost is available from:Port Funds
5. If this is a supplemental agreement involving more than$2,000, is the cost estimate
based on the latest wage rate decision? Yes No NA X '
6. Has consent of surety been obtained? Yes Not Necessary X
7. Will this change affect the insurance coverage? Yes No X
8. If yes, will the policies be extended? Yes No X
9. Has this Change Order been discussed with FAA Officials?
Yes X No When 07/24/13 With Whom Peter Doyle
R-00C123ApS10007 Renton 7W B&Signaget'Nodh Taxiway Const\Change Orders\CO 7.docx
Renton Airport
,*„l *ars'`
Change Order Cost Analysis/Backup for Taxiway B System Rehabilitation—North Portion
Reconstruction and Airfield Signage Modifications
Change Order#7
'This cost analysis is prepared in compliance with Program Guidance Letter 12-03. Comparative costs
have been taken from bid prices for other projects,from construction cost guides and from quotes from
suppliers. The quantities to complete each of the activities listed below are small in comparison to the
quantities for a typical project,therefore unit prices for the items listed will be higher than expected for
a large quantity.
1) Inspection and Testing of Existing Radio Controls to the Tower
This actiVity consists of the following tasks.
• ADB Technician
A'techniclan from ADB assisted Colvico with performing the troubleshooting activities over parts of 4
days. The technician spent a total of 13 hours on this task. The technician incurred allowable expenses
for travel,tools and supplies, coordination,and equipment. Typical cost for this activity would be
expected to range between$1,500 and$2,000. The ADB technician's portion of cost for
troubleshooting is$1,727.63.
• Colvico Electrician
A Colvico electrician performed troubleshooting activities.over parts of 4 days. The electrician spent a
total of 15 hours on this task. The electrician incurred allowable expenses for coordination and
equipment. 'Typical cost for this activity would be expected to range between$1,700 and$2,300.
Colvico's portion of cost for troubleshooting Is$2,031.39.
Inspection and Testing of Existing Radio Controls to the Tower change order price from ICON Materials
(including allowable mark-ups) $4,210.10
-Conclusion: The requested change order.amount is a fair and reasonable estimate for inspecting and
testing radio controls to the tower.
H.doc/23ap/10/007 Renton TW 8&Signage/Worth Taxiway Constr/Change Orders/Renton CO#7 Cost lustiflcation.docmJc