HomeMy WebLinkAboutCO 10U J CHANGE ORDER # 10 AIRPORT..- Renton Municipal Airport DATE: 10 -09 -13 LOCATION: Renton, Washington GRANT #: 3 -53- 0055 -024 CONTRACTOR: ICON Materials This change order was prepared in accordance with FAA Program Guidance Letter 12 -03. A price analysis was prepared and it is recommended that the FAA accept the analysis as evidence of cost reasonableness. You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer: Item Description Taxiway B Edge Light 1 Adjustment Subtotal State Sales Tax (9.5 %) This Change Order Total Previous Change Order Amount Original Contract Amount Revised Contract Total Recommended by: d' GZz Approved by. Accepted by. Accepted by. Unit Unit Price Quantity Amount LS $1,230.31 1 $1,230.31 JVngineer, Reid Middleton, Inc. $1,230.31 $116.88 $1,347.19 $463,258.42 $5.460.424.21 $5,925,029.82 Date: l 611 /3 Date: 1� l Date: Date: H:\D0C\23ApV0\007 Renton Twe & Signagel south Taxiway Construction \Change Orders \CO 10.docx CHANGE ORDER # 10 AIP PROJECT NO. 3 -53- 0055 -024 AIRPORT Renton Municipal Airport LOCATION Renton, WA JUSTIFICATION FOR CHANGE This justification for change was prepared in accordance with FAA Program Guidance Letter 12 -03 Brief description of the proposed contract change(s) and locations(s). This change order consists of the following: 1. Raise the edge light at Sta. 28 +57 (Left) approximately 6- inches to match the grade constructed in the South project. 2. Re -grade the soil adjacent to this edge light to match the adjusted base of the edge light. Reid Middleton Design Directive #12 dated September 16, 2013, (attached) documents these revisions. 2. Reason(s) for the change(s) (Continue on reverse if necessary). When this edge light was installed as part of the Taxiway `B' Rehabilitation North Portion project, this edge light matched the grade of the surrounded terrain. The Taxiway `B' Rehabilitation South Portion project plans should have included a construction note directing the Contractor to adjust the edge light at Station 28 +57 (Left) to match the re- grading in this area that was part of the South project. This note was not identified on the plans due to an oversight during the design process. This change order corrects this oversight. Re- grading of soil adjacent to this edge light is required so that the adjusted edge light base is flush with the soil. 3. Justifications for unit prices or total cost: Justification was prepared in accordance with FAA program guidance letter 12 -03. 4. The sponsor's share of this cost is available from: Port Funds 5. If this is a supplemental agreement involving more than $2,000, is the cost estimate based on the latest wage rate decision? Yes : No NA X 6. Has consent of surety been obtained? Yes Not Necessary X 7. Will this change affect the insurance coverage? Yes No X 8. If yes, will the policies be extended? Yes No X H:00C�23ApM007 Renton Tw B & signageVsouth Taxiway Construction \Change Orders \CO l0.docx J 9. Has this Change Order been discussed with FAA Officials? Yes X No When 09/10/13 With Whom Peter Dom H:\D0C\23Ap\1M007 Renton TW B & signageVSoutn Taxiway Construction \Change Orders \CO l0.docx Air- Renton Airport Change Order Cost Analysis /Backup for Taxiway B System Rehabilitation — South Portion Change Order #10 This cost analysis is prepared in compliance with Program Guidance Letter 12 -03. Comparative costs have been taken from bid prices for other projects, from construction cost guides and from quotes from suppliers. The quantities to complete each of the activities listed below are small in comparison to the quantities for a typical project, therefore unit prices for the items listed will be higher than expected for a large quantity. Taxiway B Edge Light Adjustment This activity consists of the following tasks. 1. Raise Taxiway Edge Light The work for raising (adjusting) a taxiway edge light is approximately the same work and level of effort for labor as the WSDOT bid item "Adjust Valve Box ". Review of the unit bid prices for "Adjust Valve Box" indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of valve box adjustment range from $250 to $625 per each. Total cost for adjusting one taxiway edge light can be expected to range between $250 and $625. The Contractor's lump sum price for this work is $572.80. 2. Soil Re- grading Adjacent to Edge Light This item consists of crew labor and equipment required to re -grade around the adjusted taxiway edge light. No materials were required. Labor rates are at the rates established for the contract. Equipment rates are at the standard rates established for the contract. The Contractor estimates a total time of 6 hours (3 person crew at 2 hours each) for performing this task. The Contractor's lump sum price for this work is $463.85. The total cost for raising the taxiway edge light and re- grading adjacent to the edge light can be expected to range from approximately $715 to $1,090 plus allowable mark -up. ICON's proposal for adjusting one taxiway edge light and re- grading soil around the edge light $1,036.65 plus allowable mark -up Conclusion: The requested change order amount is a fair and reasonable estimate for raising one taxiway edge light and re- grading adjacent to the edge light. H:doc /23ap/10/007 Renton TW B & Signage /'south Taxiway Constr /Change Orders /Renton CO #10 Cost Justifi cation. doc.mjc DD Number: Owner: Contractor: Engineer: Project: EM DESIGN DIRECTIVE 12 Renton Municipal Airport Contract No. ICON Materials 3 -53- 0055 -24 Reid Middleton, Inc. Engineer's File No.: 232010.007.005 Taxiway B System Rehabilitation - South Portion Reconstruction DIRECTIVE Specification Section: Para.: _ Drawing Ref: C6.3 Detail:• Plan Sheet C6.3 depicts the limits of installation and adjustment of Taxiway B edge lights. The design depicted on this sheet should have included adjustment of an edge light installed as part of the Taxiway B North project at approximate Station 28 +57 (Left). When installed in the North project, this edge light matched grade at that time; however when the South project raised the grade in this area, this edge light should be been adjusted to match new grade, but was not identified due to an oversight during the design process. The design is revised as follows (see attached Sheet C6.3 with red line revisions): • Raise the edge light at Sta. 28 +57 approximately 6- inches to match grade constructed in the South project. • Re -grade soil adjacent to this edge light to match the adjusted top of edge light and the surrounding grade. Bid item quantity adjustments per schedule will be reconciled as part of progress estimate adjustments. Contractor shall submit intended adjustments to individual bid items for reconciliation with engineer. Signed by: MLC�Cree e►v Date: 9/16/13 ❑ Attachments h: \doc\ forms \construction \izone\request for interpretation. do c cc: Owner Reid Middleton 09 Ir( SU 4d N'dld in NLLH9f1 3903 AVMIXVl 40196 n w ;AS X Ia,9S 4llCl 9Z! Nouvi I8VH3 W31SAS 8 AVMIXdl H1f10S IMUMV NdIOIN(1N NO N3a - NOLN38 30 /•NO '13 LS LS Wm x m Z-N. + I\ L i w cli 00 Cl I 9g v w V 1N •(b,��' 11 1 11 I� � N 1.L.I I 2n 1 W z a� `\- Z•90 133HS 33S OS+9 VZ 1S 3NI-IHO1VW bw��n -zoos ure:-wmax� � w^rz:e Hari Cahn ICON 'Hate i 15 1:508 Valentine Ave. SE euPacific WA. 9804" (206) 573 -3200 8 Fax (206) 373 -0319 .mvivAconmateriah.com Cost Detail with Categories MOM Project Name: Renton Airport Taxiway "B" Unit Customer: City Of Renton Sob Number: 513302 Quantity UM Billing Address: 3555 NE 2ND STREET Bid As: PRIME 807 - Design Directive #12 1.00 LS Renton, WA 98056 Estimator: David Gent a $1,230.31 18.68 /o Phone: 425- 430 -7400 Project Address: Renton, WA $8.00 Contact: Match Existing Grade. Completion Date: $63.19 $126.38 Labor Skilled 2.00 HR Total Allowable Markup = $193.66 General Labor Crew 1.00 HR $463.85 $463.85 JobCostID: 50.300 Labor Equipment Material aubmLltfac ee Trucking Miscellaneous plug Unit: $343.85 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total: $343.85 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Break Bulk Crew 1.00 DY Unit Total (2.00 PH /DY, 0.25 DY) Description Quantity UM Direct Cost Direct Cost Unit Price Total Price MU% 807 - Design Directive #12 1.00 LS $1,036.65 ;1,036.65 $1,230.31 a $1,230.31 18.68 /o Raise Edge Light Sta.28 +57 To $34.00 Plate Compactor 2.00 HR $8.00 $16.00 Match Existing Grade. 2.00 HR $63.19 $126.38 Labor Skilled 2.00 HR Labor Equip1J en Materisll Subcontracted Truckf�nc Miscellaneous p q Unit: $343.85 $120.00 $0.00 $572.80 $0.00 $0.00 $0.00 Total: $34185 $120.00 $0.00 $572.80 $0.00 $0.00 $0.00 CEC - 10/7/2013 9:56 AM: ICON Allowable Markup as Follows: Labor @ 29% =$ 99.72 Equipt @ 21% = $25.20 Sub @ 120/c = $68.74 Total Allowable Markup = $193.66 General Labor Crew 1.00 HR $463.85 $463.85 JobCostID: 50.300 Labor Equipment Material aubmLltfac ee Trucking Miscellaneous plug Unit: $343.85 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total: $343.85 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Break Bulk Crew 1.00 DY $463.85 $463.85 (2.00 PH /DY, 0.25 DY) JD 410 /Cat 426 Backhoe (7 2.00 HR $35.00 $70.00 MTons) i Tn Flatbed 2.00 HR $17.00 $34.00 Plate Compactor 2.00 HR $8.00 $16.00 Operator Foreman 2.00 HR $63.19 $126.38 Labor Skilled 2.00 HR $47.79 $95.58 Operator Skilled 2.00 HR $60.94 $121.89 J Innovative Electric Quote 1.00 LS $572.80 $572.80 JobCostID: 50.460 10/7/2013 10:06:28 AM Page 1 of 2 J Total Bid Price: $1,230.31 10/7/2013 10:06:28 AM Renton Airport Taxiway 'B" Page 2 of 2 Percent of Amount Direct Cost Labor: $343.85 33.17% Equipment Owned: $120.00 11.58% Equipment Rented: $0.00 0.000/0 Materials Owned: $0.00 0.000/0 Materials Purchased: $0.00 0.000/0 Subcontracted: $572.80 55.26% Trucking Owned: $0.00 0.00% Trucking Hired: $0.00 0.00% Miscellaneous: $0.00 0.00% Plug: $0.00 0.00% Direct Cost: $1,036.65 PIUM Percent of Amount Bid Price Total Direct Cost: $1,036.65 84.26% Total DC Adds /Cuts: $0.00 0.00% Total Indirect Cost: $0.00 0.00% Total Bond: $0.00 0.000/0 Total Overall Cost: $1,036.65 84.26% Total Overhead: $0.00 0.00% Total Profit: $193.66 15.74% Total Margin: $193.66 15.74% Total Bid Price: $1,230.31 10/7/2013 10:06:28 AM Renton Airport Taxiway 'B" Page 2 of 2 LM INNOVATIVE 2iQMMY W G:IA�. s � NIi�U b�f R. a4 TO: ICON Materials ADDRESS: 1508 Valentine Ave. SE CITY & STATE: Pacific, WA 98047 PHONE:206- 574 -3906 ATTN: Chuck Coffey EMAIL: ccoffey @oldcastlematerials.com P 425 - 290.74403 V 425- 359.19h5 P.O. Box 4399 E-ar Tr, WA 90204 1 rvNt7YAT IYS'C4CGT'Pt >C.CTOM P] DATE: September 21, 2013 JOB: City of Renton Taxiway B System Rehabilitation South Portion Reconstruction AIP No. 3 -53 -0055 -024 PROJECT NO: 0001 -2013 Design Directive #12 Raise edge light at Sta 28 +57 6 inches to match existing grade Labor Hours Labor markup Material Costs Material markup Permit Costs Sub contract work Prime Cost Total Small Tool Allowance Sub -Total Bonds, Permits, Ins. Sales tax 3.45 Hours @ $66.38 29% 21% 0% of sub total $$ % of TOTAL 3.00% 0.0% Subtotal $229.01 $66.41 $215.45 $45.24 $0.00 $0.00 $556.12 $0.00 $556.12 $16.68 $0.00 TOTAL PRICE FOR THIS CHANGE $572.80 LABOR AND MATERIAL BREAKDOWN FOR THIS CHANGEORDER DESCRIPTION QUANITY MATERIAL MATERIAL LABOR LABOR EACH EACH TOTAL EACH TOAL 24" SonoTube 12' 1 $107.76 $107.76 0.5 0.5 Dowel existing base 5 $2.25 $11.25 0.1 0.5 Base extension 1 $194.05 $194.05 0.2 02 Concrete for base ext. 1 $9.90 $9.90 2.25 2.25 Heat shrink 2 $3.76 $0.25 0.2 0.4 R &R edge light 1 $0.00 $0.00 0.1 0.1 Total material cost $215.45 Total labor hours 3.45 Unit Bid Analysis - Standard Items Report Page 1 of 1 0 Soarch Contact WSDO WSDOT Homo 19 .p..... of Trwaporftflon T Alm_ E`IC .S ftGi DS Ri).: =t_ TS G;.SIfJESS Etd'�IRC ?', ;'Er.Tr L ;`A.FS ;AT:�, F0_ Bid Item Unit Price Tabulation Standard Items Region: Northwest Contracts awarded from 10/8/2008 thru 10/8/2013 Total records found: 17 1 New Search Standard Item Unit of Job Contract Planned Low Second Third Number Measure Item Description Number Number AD Date Quantity Bid Bid Bid 6243 EACH ADJUST VALVE BOX 08A026 007653 12/15/2008 68.00 $180.00 $315.00 $300.00 6243 EACH ADJUST VALVE BOX 09A0181 007859 11/23/2009 2.00 $275.00 $200.00 $152.75 6243 EACH ADJUST VALVE BOX 09AO21 007874 12/21/2009 8.00 $300.00 $265.00 $225.00 6243 EACH ADJUST VALVE BOX 09AO09 007920 3/15/2010 8.00 $310.00 $270.00 $350.00 6243 EACH ADJUST VALVE BOX 1 OA009 007921 3/15/2010 1.00 $600.00 $250.00 $625.00 6243 EACH ADJUST VALVE BOX 1 OA010 007938 4/12/2010 5.00 $200.00 $180.00 $269.59 6243 EACH ADJUST VALVE BOX 1OA008 007948 4126/2010 1.00 $325.00 $375.00 $375.00 6243 EACH ADJUST VALVE BOX 1OA055 008051 11/15/2010 15.00 $225.00 $475.00 $280.00 6243 EACH ADJUST VALVE BOX 1 OA029 008052 11/22/2010 8.00 $320.00 $230.00 $700.00 6243 EACH ADJUST VALVE BOX 10A017 008053 11/22/2010 17.00 $420.00 $125.00 $480.00 6243 EACH ADJUST VALVE BOX 1OA039 008055 11/22/2010 3.00 $600.00 $500.00 $350.00 6243 EACH ADJUST VALVE BOX 1 OA035 008103 2/28/2011 80.00 $420.00 $0.00 $0.00 6243 EACH ADJUST VALVE BOX 1OA038 008114 3/21/2011 3.00 $245.00 $275.00 $600.00 6243 EACH ADJUST VALVE BOX 1 OA034 008128 4/4/2011 2.00 $400.00 $350.00 $325.00 6243 EACH ADJUST VALVE BOX 12AO15 008416 1/22/2013 3.00 $870.00 $0.00 $0.00 6243 EACH ADJUST VALVE BOX 12AO12 008439 2/25/2013 4.00 $360.00 $425.00 $425.00 6243 EACH ADJUST VALVE BOX 12AO17 008457 3/25/2013 3.00 $500.00 $400.00 $380.00 NWR AVERAGE LOW BID is $325.35 State AVERAGE LOW BID is $326.06 New Search Copyright WSDOT © 2001 Traffic & Roads ( Site Index I Contact WSDOT I WSDOT Business I WSDOT Home http: / /www.wsdot.wa.gov /biz/contaa/uba /sreport.cfm 10/8/2013