Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CO 08
i AIRPORT., Renton Municipal Airport LOCATION., Renton, Washington CONTRACTOR: ICON Materials CHANGE ORDER # 8 DATE. 9 -17 -13 GRANT #: 3 -53- 0055 -024 This change order was prepared in accordance with FAA Program Guidance Letter 12 -03. A price analysis was prepared and it is recommended that the FAA accept the analysis as evidence of cost reasonableness. You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer: Item Description Unit Unit Price Quantity Amount Mobilization (Perimeter Road 1 Rehabilitation) LS $48,000.00 1 $48,000.00 2 QC Testing LS $1,600.00 1 $1,600.00 3 Construction Survey LS $3,000.00 1 $3,000.00 4 Erosion Control LS $3,000.00 1 $3,000.00 5 Asphalt Sawcutting LF $3.85 420 $1,617.00 Asphalt Pavement Grinding and 6 Disposal SY $3.75 5,440 $20,400.00 7 Adjust Manhole EA $700.00 18 $12,600.00 8 Adjust Catch Basin EA $700.00 2 $1,400.00 9 Adjust Valve Box and Cleanouts EA $450.00 6 $2,700.00 10 Pavement Preparation SY $13.00 900 $11,700.00 HMA Cl. 1/2-inch PG 64 -22 (2" 11 overlay) TON $78.00 2,240 $174,720.00 12 Bituminous Tack Coat TON $900.00 9 $8,100.00 Removing Conc. Curb and 13 Gutter LF $12.00 525 $6,300.00 Cement Conc. Traffic Curb and 14 Gutter LF $41.75 525 $21,918.75 Raised Pavement Marker 15 Removal EA $9.00 200 $1,800.00 Raised Pavement Marker (WSDOT 16 Type 1Y) HUND $660.00 8.84 $5,834.40 Fire Hydrant Raised Pavement 17 Marker EA $11.00 22 $242.00 18 Paint Striping LF $0.50 9,840 $4,920.00 19 Painted Stop Line LF $5.00 115 $575.00 20 Painted Traffic Arrow EA $71.50 5 $357.50 21 Project Temporary Traffic Control LS $30,000.00 1 $30,000.00 Subtotal $360,332.15 State Sales Tax (9.5 %) $34,231.56 This Change Order Total $394,563.71 Previous Change Order Amount ($- 15,994.78) HADOC123AIAI 0007 Renton Tws & signageVSouril Taxiway Construction \Change Orders \CO 8a.docx IM Original Contract Amount Revised Contract Total Recommended by Approved by Accepted by Accepted by 4 $5,460,424.21 $5,838,993.14 Owner, L-;. Contractor, I Aviation Administration Date: Z/ 2 /a Date: / Date: l3 Date: H: \o0CMap0 007 Renton rws a signage \south Taxiway Construction \Change Orders \CO 8a.docx The perimeter road and parking lot areas utilized for Taxiway B construction haul traffic, and identified for repair, is depicted on the airport map included within this change order. Due to the increase of haul road repair necessary exceeding the established bid item amount by more than 25 %, payment for the perimeter haul road repair and parking lot repair (as depicted on the attached map) shall not be paid out under bid item 6 -13, but shall be paid under items established within this change order. The work described in this change order is outside of the limits of the Shoreline Exemption defined in the Certificate of Exemption issued by the City of Renton dated January 3, 2013. This Exemption defines the closest point of work as "64 feet from the flood wall which is estimated to be the approximate location of the (Cedar River) OHWM." 3. Justifications for unit prices or total cost: Justification was prepared in accordance with FAA program guidance letter 12 -03. 4. The sponsor's share of this cost is available from: Port Funds 5. If this is a supplemental agreement involving more than $2,000, is the cost estimate based on the latest wage rate decision? Yes No NA X 6. Has consent of surety been obtained? Yes Not Necessary X 7. Will this change affect the insurance coverage? Yes No X 8. If yes, will the policies be extended? Yes No X 9. Has this Change Order been discussed with FAA Officials? Yes X No When 09/10/13 With Whom Peter Dom x:00C123ApUM007 Renton rwa & s;gnagek'sourn Taxiway Construction \Change Orders \CO 8a.docx .ti CHANGE ORDER # 8 AIP PROJECT NO. 3 -53- 0055 -024 AIRPORT Renton Municipal Airport LOCATION Renton, WA JUSTIFICATION FOR CHANGE This justification for change was prepared in accordance with FAA Program Guidance Letter 12 -03 1. Brief description of the proposed contract change(s) and locations(s). This change order consists of the following: 1. Pavement repair of Perimeter Road (approximately 1.3 miles) from Rainer Ave. N. to Logan Ave. N. 2. Pavement repair of the Airport Office parking lot. Reid Middleton Memorandum dated August 30, 2013, (attached) documents these revisions. 2. Reason(s) for the change(s) (Continue on reverse if necessary). The Taxiway `B' Rehabilitation project consisted of the reconstruction and rehabilitation of the existing taxiway pavements east of Runway 16 -34. The design and construction of the project was conducted within two phases. Construction commenced during May 2013 and continues through September 2013. The project anticipated some level of haul road repair on the Airport Perimeter Road due to construction truck traffic associated with the Taxiway B improvements. The level of haul road repair necessary prior to construction was not identifiable. Due to the uncertainty at bid time as to the level of haul road repair that would be necessary, a force account bid item was set up within the contract, with a force account place holder value of $75,000. During the two projects, the perimeter road and Airport office parking lot serving the airport facility has been subjected to significant truck and trailer traffic from the construction activities. Although there was some pre- existing pavement distress of the roadway and parking lot, Airport personnel has observed further deterioration of the pavement due to prolonged construction traffic, which will affect the service life of the surfaces. The road and parking lot conditions have deteriorated quicker due to Taxiway B construction activities and are in need of maintenance to sustain the pavements. The deterioration is occurring periodically over the full length of the perimeter haul route, and wide spread within the Airport office parking lot. This change order includes work items to repair the full length of the perimeter road utilized for construction haul traffic, and repair the airport office parking lot pavement subjected to construction activity during installation of the stand by generator system. H:\DOC123Ap190\007 Renton rwa & s;gnagel'sourh Taxiway Construction \Change Orders \CO 8a.docx ! I 1 Renton Airport Change Order Cost Analysis /Backup for Taxiway B System Rehabilitation — South Portion Change Order #8 This cost analysis is prepared in compliance with Program Guidance Letter 12 -03. Comparative costs have been taken from bid prices for other projects, from construction cost guides and from quotes from suppliers. The quantities to complete each of the activities listed below are small in comparison to the quantities for a typical project, therefore unit prices for the items listed will be higher than expected for a large quantity. • Pavement Repair of Perimeter Road from Rainier Ave. N. to Logan Ave. N. (Approximately 1.3 miles) and Repair of the Airport Office Parking Lot Pavement This activity consists of the following tasks. 1. Mobilization The proposed lump sum price of $48,000 for the proposed new bid item for the added work on Perimeter Road and the Airport Office Parking Lot is approximately 13% of the proposed cost for this work. For projects of this size and scope, mobilization percentages of 8% to 13% are common. Due to the break in schedule between performing the Taxiway B construction and this added work, the Contractor will de- mobilize from the Taxiway B site and re- mobilize when this pavement repair work begins. 2. QC Testing The proposed lump sum price of $1,600 for the proposed new bid item for the added work on Perimeter Road and the Airport Office Parking Lot is approximately 0.4% of the proposed cost for this work. For projects of this size and scope, QC Testing percentages of 0.25% to 0.5% are common. 3. Construction Survey The proposed lump sum price of $3,000 for the proposed new bid item for the added work on Perimeter Road and the Airport Office Parking Lot is approximately 0.8% of the proposed cost for this work. For projects of this size and scope, construction survey percentages of 0.5% to 1.0% are common. 4. Erosion Control The proposed lump sum price of $3,000 for the proposed new bid item for the added work on Perimeter Road and the Airport Office Parking Lot is approximately 0.8% of the proposed cost for this work. For projects of this size and scope, erosion control percentages of 0.5% to 1.5% are common. 5. Asphalt Sawcutting Review of unit prices for Asphalt Sawcutting indicates that unit prices for street and roadway projects for comparable quantities of sawcutting range from $3.00 to $6.00 per LF. The total cost for sawcutting 420 LF of asphalt pavement can be expected to range from $1,260 to $2,520. The Contractor's unit price of $3.85 per LF results in a cost of $1,617. 6. Asphalt Pavement Grinding and Disposal Review of unit prices for Asphalt Pavement Grinding and Disposal indicates that unit prices ( WSDOT bid item Planing Bituminous Pavement) within the WSDOT Northwest Region (King County) for comparable quantities of pavement grinding range from $1.31 to $4.10 per SY. The total cost for 5,440 SY of Asphalt Pavement Grinding and Disposal can be expected to range from $7,126 to $22,304. The Contractor's unit price of $3.75 per SY results in a cost of $20,400. 7. Adjust Manhole Review of unit prices for Adjust Manhole indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of manhole adjustment range from $260 to $750 per EA. The total cost for adjusting 18 EA manholes can be expected to range from $4,680 to $13,500. The Contractor's unit price of $700 per EA results in a cost of $12,600. 8. Adjust Catch Basin Review of unit prices for Adjust Catch Basin indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of catch basin adjustment range from $300 to $900 per EA. The total cost for adjusting 2 EA catch basins can be expected to range from $600 to $1,800. The Contractor's unit price of $700 per EA results in a cost of $1,400. 9. Adjust Valve Box and Cleanouts Review of unit prices for Adjust Valve Boxes and Cleanouts indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of valve box and catch basin adjustment range from $72 to $480 per EA. The total cost for adjusting 6 EA valve boxes and cleanouts can be expected to range from $432 to $2,880. The Contractor's unit price of $450 per EA results in a cost of $2,700. 10. Pavement Preparation Review of unit prices for Pavement Preparation (application of 1 -foot wide strip of PetroTac) indicates that unit price from the Ashland Municipal Airport project of 2011 for PetroTac was $18.00 per SY. The total cost for 900 SY of Pavement Preparation could be expected to be approximately $16,200. The Contractor's unit price of $13.00 per SY results in a cost of $11,700. 11. HMA Cl. % -Inch PG 64 -22 Review of unit prices for HMA Cl. %Z -Inch PG 64 -22 indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of HMA range from $70 to $95.80 per Ton. The total cost for paving 2,240 Tons of HMA Cl. 1/" PG 64 -22 can be expected to range from $156,800 to $214,592. The Contractor's unit price of $78.00 per Ton results in a cost of $174,720. i I , 12. Bituminous Tack Coat F] The proposed unit price of $900 per Ton for application of Bituminous Tack Coat matches the unit price established in the contract for the rehabilitation of Taxiway B. For the estimated quantity of 9 Tons of tack coat, the Contractor's unit price of $900.00 per Ton results in a cost of $8,100.00. 13. Removing Conc. Curb and Gutter Review of unit prices for Removing Cement Conc. Curb and Gutter indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of removing curb and gutter range from $2.00 to $15.00 per LF. The total cost for 525 LF of Removing Conc. Curb and Gutter can be expected to range from $1,050 to $7,875. The Contractor's unit price of $12.00 per LF results in a cost of $5,700. 14. Cement Conc. Traffic Curb and Gutter Review of unit prices for Cement Conc. Traffic Curb and Gutter indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of curb and gutter range from $9.30 to $25 per LF. The total cost for installing 525 LF of Traffic Curb and Gutter can be expected to range from $4,882 to $13,125. The Contractor's unit price of $41.75 per LF results in a cost of $21,918.75. 15. Raised Pavement Marker Removal Review of unit prices for Raised Pavement Marker Removal indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of pavement marker removal range from $2.00 to $8.50 per EA. The total cost for removing 200 EA Raised Pavement Markers can be expected to range from $400 to $1,700. The Contractor's unit price of $9.00 per EA results in a cost of $1,800. 16. Raised Pavement Marker ( WSDOT Type 1Y) Review of unit prices for Raised Pavement Markers Type 1 indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of Type 1 markers range from $225 to $550 per Hundred. The total cost for installing 8.84 Hundred of Raised Pavement Markers Type 1 can be expected to range from $1,989 to $4,862. The Contractor's unit price of $660.00 per hundred results in a cost of $5,834.40. 17. Fire Hydrant Raised Pavement Marker Review of unit prices for Fire Hydrant Raised Pavement Markers indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of fire hydrant markers range from $9.50 to $11.50 per EA. The total cost for installing 22 EA Fire Hydrant Raised Pavement Markers can be expected to range from $209 to $253. The Contractor's unit price of $11.00 per EA results in a cost of $242. too 4 18. Paint Striping Review of unit prices for Paint Striping indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of paint striping range from $0.12 to $0.50 per LF. The total cost for installing 9,840 LF of Paint Striping can be expected to range from $1,181 to $4,920. The Contractor's unit price of $0.50 per LF results in a cost of $4,920. 19. Painted Stop Line Review of unit prices for Painted Stop Line indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of stop line striping range from $1.60 to $6.00 per LF. The total cost for installing 115 LF of Painted Stop Line can be expected to range from $184 to $690. The Contractor's unit price of $5.00 per LF results in a cost of $575. 20. Painted Traffic Arrow Review of unit prices for Painted Traffic Arrow indicates that unit prices within the WSDOT Northwest Region (King County) for comparable quantities of traffic arrows range from $40.00 to $500.00 per EA. The total cost for installing 5 EA of Painted Traffic Arrows can be expected to range from $200 to $2,500. The Contractor's unit price of $71.50 per EA results in a cost of $357.50. 21. Project Temporary Traffic Control The proposed lump sum price of $30,000 for the proposed new bid item for the added work on Perimeter Road and the Airport Office Parking Lot is approximately 8% of the proposed cost for this work. For projects of this size and scope, traffic control percentages of 5% to 13% are common. Based on these line items, the cost (including SST) for Perimeter Road Repair from Rainier Ave. N to Logan Ave. N. can be anticipated to range from $318,528 to $441,746. Perimeter Road Repair from Rainier Ave. N. to Logan Ave. N. Area change order price (including SST) from ICON Materials $394,563.71 Conclusion: The requested change order amount is a fair and reasonable estimate for addition of a new work for Perimeter Road Repair from Rainier Ave. N. to Logan Ave. N. H:doc /23ap/10/007 Renton TW B & Signage /'south Taxiway Constr /Change Orders /Renton CO #8 Cost Justification.doc.mjc 61 LqkTanim 19S3-2013 728 134th Street SW, Suite 200 Everett, WA 98204 Ph: 425/741 -3800, Fax: 425/741 -3900 MEMORANDUM To: Mr. Peter Doyle — Federal Aviation Administration Northwest Mountain Region From: Kurt Addicott, P.E. — Reid Middleton, Inc. Date: August 30, 2013 File No.: 232010.007 Subject: Renton Municipal Airport — Haul Route Repairs Background The Taxiway `B' Rehabilitation project consisted of the reconstruction and rehabilitation of the existing taxiway pavements east of Runway 16 -34. The design and construction of the project was conducted within two phases. Construction commenced during May 2013 and continues through September 2013. The project anticipated some level of haul road repair on the Airport Perimeter Road due to truck traffic associated with the Taxiway B improvements. The level of haul road repair necessary prior to construction was not identifiable. Due to the uncertainty at bid time as to the level of haul road repair that would be necessary, a force account bid item was set up within the contract, with a force account place holder value of $75,000. During the projects, the perimeter road and Airport office parking lot serving the airport facility has been subjected to significant truck and trailer traffic from the construction activities. Although there was some pre- existing pavement distress of the roadway and parking lot, it has become apparent that the construction traffic along this roadway has further deteriorated the pavement and affected the service life of the surface. The road and parking lot conditions have deteriorated quicker due to Taxiway B construction activities and are in need of maintenance to sustain the pavements. The deterioration is occurring periodically over the full length of the perimeter haul route, and wide spread within the Airport office parking lot. Conclusion and Recommendation It is recommended that the Airport undertake rehabilitation of the full length of the perimeter road utilized for construction haul traffic, as well as the airport office parking lot subjected to construction activity during installation of the stand by generator installation. The perimeter road area utilized for Taxiway B construction haul traffic, and recommended to be rehabilitated, is identified on the attached airport map. The recommended rehabilitation of the full perimeter road haul route has an estimated construction value of $589,000. The recommended rehabilitation of the parking lot damage has an estimated construction value of $40,000. Reid Middleton recommends undertaking these elements of work and increasing the value of the contract haul road repair bid item. Page 1 of 1 vl- c r 0 0 cc .2 .S-- a LL CL) C_ ca (L 06 a cc 0 cr R It 'axiway B System Rehabilitation Proje Renton Municipal Airport — Clayton Scott Field Renton, Washington Perimeter Road Rehabilitation (24' Width) Basic Overlay Approach Items of Work and Materials Quantity Unit Unit Price I Total Amount Mobilization Mobilization 1 LS $ 10,000.00 $ 10,000.00 Subtotall $ 10,000.00 Site Control QC Testing 1 LS $ 5,000.00 $ 5,000.00 Construction Survey I LS $ 5,000.00 $ 5,000.00 Erosion Control 1 LS $ 5,000.00 $ 5,000.00 Subtotal $ 15,000.00 Road Rehabilitation Asphalt Sawcutting 400 LF $ 3.00 $ 1,200.00 Asphalt Pavement Grinding and Disposal 6400 SY $ 15.00 $ 96,000.00 Adjust Telephone Vault 2 EA $ 750.00 $ 1,500.00 Adjust Manhole 18 EA $ 500.00 $ 9,000.00 Adjust Catch Basin 2 EA $ 500.00 $ 1,000.00 Adjust Valve Box and Cleanouts 14 EA $ 400.00 $ 5,600.00 Pavement Preparation 10000 SY $ 3.00 $ 30,000.00 Bituminous Surface Course (2" Overlay) 2670 TON $ 85.00 $ 226,950.00 Bituminous Tack Coat 10 TON $ 1,100.00 $ 11,000.00 Removing Conc. Curb and Gutter 475 LF $ 8.00 $ 3,800.00 Cement Conc. Traffic Curb and Gutter 475 LF $ 30.00 $ 14,250.00 Raised Pavement Marker Removal 200 EA $ 1.00 $ 200.00 Raised Pavement Marker (Large Road Stud) 1 HUND $ 650.00 $ 650.00 Raised Pavement Marker (WSDOT Type IY) 1 HUND $ 475.00 $ 475.00 Fire Hydrant Raised Pavement Marker 26 EA $ 5.00 $ 130.00 Roadway Paint 12000 LF $ 1.00 $ 12,000.00 Painted Stop Line 125 LF $ 20.00 $ 2,500.00 Painted Traffic Arrow 5 EA $ 120.00 $ 600.00 Herbicide 23500 SY $ 2.00 $ 47,000.00 Subtotal $ 463,855.00 SUBTOTAL $ 488,855.00 CONTINGENCY (10 %) $ 48,885.50 SUBTOTAL $ 537,740.50 SALES TAX (9.5 %) $ 51,085.35 TOTAL. $ 588,825.85 ASSUMEI $ 589,000.00 AIP #: 3 -53- 005 -023 & -024 Renton Municipal Airport Project #: 232010.007 Page 1 of 1 Opinion of Cost Taxiway B System Rehabilitation Project Renton Municipal Airport — Clayton Scott Field Renton, Washington Airport Office Parkins Lot Rehabilitation Basic Overlay Approach Items of Work and Materials Quantity Unit Unit Price Total Amount Mobilization Mobilization 1 LS $ 2,000.00 $ 2,000.00 Subtotall $ 2,000.00 Site Control QC Testing 1 LS $ 5,000.00 $ 5,000.00 Construction Survey 1 LS 3% $ 1,000.00 Erosion Control 1 LS $ 5,000.00 $ 5,000.00 Subtotall $ 11,000.00 Road Rehabilitation Asphalt Sawcutting 100 LF $ 3.00 $ 300.00 Asphalt Pavement Grinding and Disposal 340 SY $ 15.00 $ 5,100.00 Adjust Manhole 1 EA $ 500.00 $ 500.00 Adjust Catch Basin 1 EA $ 500.00 $ 500.00 Pavement Preparation 100 SY $ 3.00 $ 300.00 Bituminous Surface Course 100 TON $ 85.00 $ 8,500.00 Bituminous Tack Coat I TON $ 1,100.00 $ 1,100.00 Removing Conc. Curb and Gutter 50 LF $ 8.00 $ 400.00 Cement Conc. Traffic Curb and Gutter 50 LF $ 30.00 $ 1,500.00 Roadway Paint 240 LF $ 1.00 $ 240.00 Herbicide 800 SY $ 2.00 $ 1,600.00 Subtotal $ 20,040.00 SUBTOTAL $ 33,040.00 CONTINGENCY (10 %) $ 3,304.00 SUBTOTAL $ 36,344.00 SALES TAX (9.5 %) $ 3,452.68 TOTAL $ 39,796.68 ASSUME $ 40,000.00 AIP #: 3 -53- 005 -023 & -024 Renton Municipal Airport Project #: 232010.007 Page 1 of 1 Opinion of Cost IM F] Taxiway B System Rehabilitation Project Renton Municipal Airport — Clayton Scott Field Renton, Washington 1. View of the Airport Office Parking Lot after the installation of the generator. 2. Damage to West Perimeter Road. AIP #: 3-53-0055-02' ) & -024 Page 1 of 4 Renton Municipal Airport Project #: 232010.007 Perimeter Road Photographs 3. New damage near previously repaired asphalt surface. 4. View of two trucks passing along West Perimeter Road. AIP #: 3 -53- 0055 -023 & -024 Page 2 of 4 Renton Municipal Airport Project #: 232010.007 Perimeter Road Photographs IM F] 5. Damage along East Perimeter Road. 6. Damage to East Perimeter Road heading east. AIP #: 3 -53- 0055 -023 & -024 Page 3 of 4 Renton Municipal Airport Project #: 232010.007 Perimeter Road Photographs 7. The intersection between Logan Avenue and East Perimeter Road. 8. Damage to East Perimeter Road along an existing pavement patch. AIP #: 3 -53- 0055 -023 & -024 Page 4 of 4 Renton Municipal Airport Project #: 232010.007 Perimeter Road Photographs UBA History of Item 0230 EASTERN Region 1 Page 1 of 7 News &Nmh Contact 1M8100T I 1M 557T Nona Unit Bid Analysis History for Standard Item 3080 Pp.._i t4 1*0 LL' in the NORTHWEST Region To view the detail information for a specfic contract click on Contract Number Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date 008439 14.0000 465.0000 740.0000 700.0000 Mar 27, 2013 008436 2.0000 250.0000 300.0000 350.0000 Mar 27, 2013 008381 1.0000 342.0000 600.0000 250.0000 Dec 12, 2012 008236 1.0000 425.0000 400.0000 400.0000 Jan 11, 2012 008140 1.0000 490.0000 500.0000 350.0000 Jun 08, 2011 008128 1.0000 1000.0000 600.0000 550.0000 May 18, 2011 008114 2.0000 345.0000 390.0000 750.0000 Apr 20, 2011 008103 118.0000 625.0000 Apr 06, 2011 0081.01 3.0000 350.0000 350.0000 350.0000 Mar 23, 2011 008053 13.0000 530.0000 325.0000 550.0000 Feb 02, 2011 008077 1.0000 400.0000 500.0000 400.0000 Feb 02, 2011 008052 1.0000 500.0000 370.0000 850.0000 Jan 05, 2011 008055 2.0000 600.0000 500.0000 450.0000 Jan 05, 2011 008051 8.0000 375.0000 625.0000 300.0000 Dec 15, 2010 007945 2.0000 375.0000 550.0000 450.0000 Jun 23, 2010 007936 8.0000 800.0000 800.0000 550.0000 Jun 09, 2010 007921 1.0000 600.0000 450.0000 750.0000 May 05, 2010 007917 3.0000 300.0000 351.8300 300.0000 Apr 14, 2010 007874 2.0000 400.0000 370.0000 300.0000 Jan 27, 2010 007653 56.0000 340.0000 485.0000 400.0000 Jan 14, 2009 007647 1.0000 600.0000 1000.0000 800.0000 Jan 07, 2009 http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfin? &Item = 3080 &xRegion = l 9/12/2013 UBA History of Item 0230 EASTERN Region 007575 6.0000 200.0000 1360.0000 500.0000 Ju109, 2008 007573 1.0000 350.0000 440.0000 1000.0000 Jun 18, 2008 007532 1.0000 1000.0000 475.0000 600.0000 Apr 30, 2008 007510 1.0000 400.0000 4000.0000 500.0000 Mar 04, 2008 007484 9.0000 450.0000 500.0000 750.0000 Feb 27, 2008 007480 25.0000 450.0000 560.0000 630.0000 Feb 06, 2008 007431 3.0000 600.0000 750.0000 580.0000 Dec 12, 2007 007426 1.0000 790.0000 500.0000 1000.0000 Nov 28, 2007 007411 1.0000 500.0000 350.0000 750.0000 Oct 17, 2007 007337 54.0000 350.0000 500.0000 550.0000 May 09, 2007 007339 1.0000 540.0000 3000.0000 May 02, 2007 007264 2.0000 300.0000 500.0000 400.0000 Feb 14, 2007 007240 5.0000 450.0000 500.0000 500.0000 Jan 18, 2007 007251 1.0000 500.0000 375.0000 500.0000 Jan 18, 2007 007192 29.0000 300.0000 450.0000 700.0000 Aug 16, 2006 007163 1.0000 1000.0000 450.0000 1500.0000 Jun 28, 2006 007157 19.0000 300.0000 750.0000 260.0000 Jun 07, 2006 007113 4.0000 400.0000 300.0000 300.0000 Mar 22, 2006 007064 9.0000 269.0000 700.0000 Jan 19, 2006 007030 28.0000 400.0000 490.0000 500.0000 Nov 30, 2005 006994 6.0000 290.0000 300.0000 650.0000 Jul 13, 2005 007006 1.0000 400.0000 400.0000 400.0000 Jun 29, 2005 006981 3.0000 500.0000 500.0000 1000.0000 May 11, 2005 006941 11.0000 350.0000 325.0000 400.0000 May 11, 2005 006974 8.0000 375.0000 375.0000 550.0000 May 11, 2005 006960 18.0000 300.0000 400.0000 440.0000 May 04, 2005 006932 7.0000 380.0000 375.0000 1250.0000 May 04, 2005 006955 38.0000 450.0000 450.0000 550.0000 Apr 20, 2005 006953 39.0000 360.0000 450.0000 450.0000 Apr 20, 2005 006913 1.0000 500.0000 400.0000 300.0000 Feb 24, 2005 006879 2.0000 500.0000 400.0000 410.0000 Feb 09, 2005 http:// www. wsdot. wa. govfbiz/oontaa/uba/ubahist.cfin? &Item = 3080 &xRegion = l Page 2 of 7 9/12/2013 UBA History of Item 0230 EASTERN Region Page 1 of 10 NW" I Sum Conhat WODOT I 1MBDOT Homy Unit Bid Analysis History for Standard Item 3100 AD J U&1S C,,AT-C 4 9-0'51N in the NORTHWEST Region To view the detail information for a specftc contract click on Contract Number Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date 008461 6.0000 525.0000 525.0000 550.0000 Apr 24, 2013 008445 6.0000 450.0000 450.0000 450.0000 Apr 03, 2013 008439 86.0000 465.0000 535.0000 500.0000 Mar 27, 2013 008414 2.0000 300.0000 400.0000 900.0000 Mar 13, 2013 008307 3.0000 600.0000 500.0000 550.0000 May 31, 2012 008290 2.0000 515.0000 465.0000 500.0000 May 23, 2012 008286 1.0000 500.0000 500.0000 866.0000 May 09, 2012 008233 1.0000 960.0000 775.0000 250.0000 Jan 05, 2012 008140 11.0000 300.0000 375.0000 325.0000 Jun 08, 2011 008128 2.0000 500.0000 425.0000 400.0000 May 18, 2011 008142 7.0000 500.0000 420.0000 400.0000 May 18, 2011 008103 104.0000 520.0000 Apr 06, 2011 008099 2.0000 450.0000 360.0000 450.0000 Mar 16, 2011 008086 2.0000 144.4500 250.0000 375.0000 Mar 02, 2011 008077 1.0000 400.0000 250.0000 250.0000 Feb 02, 2011 008053 14.0000 530.0000 370.0000 458.0000 Feb 02, 2011 008052 1.0000 500.0000 370.0000 850.0000 Jan 05, 2011 008055 2.0000 600.0000 500.0000 450.0000 Jan 05, 2011 008035 1.0000 530.0000 Nov 17, 2010 007962 2.0000 300.0000 400.0000 450.0000 Jul 14, 2010 007945 1.0000 500.0000 565.0000 450.0000 Jun 23, 2010 http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item = 3100 &xRegion =l 9/12/2013 UBA History of Item 0230 EASTERN Region Page 1 of 6 Nbws 8�Mh I Cando! WSDOT VADOT Hong CONTRACT ,, & AWARD Unit Bid Analysis History for Standard Item 6243 #Dj-4!;-r V.4LLJE� 90,0 in the NORTHWEST Region To view the detail information for a specfic contract click on Contract Number Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date 008457 3.0000 500.0000 400.0000 380.0000 Apr 24, 2013 008439 4.0000 360.0000 425.0000 425.0000 Mar 27, 2013 008416 3.0000 870.0000 Feb 21, 2013 008128 2.0000 400.0000 350.0000 325.0000 May 18, 2011 008114 3.0000 245.0000 275.0000 600.0000 Apr 20, 2011 008103 80.0000 420.0000 Apr 06, 2011 008053 17.0000 420.0000 125.0000 480.0000 Feb 02, 2011 008052 8.0000 320.0000 230.0000 700.0000 Jan 05, 2011 008055 3.0000 600.0000 500.0000 350.0000 Jan 05, 2011 008051 15.0000 225.0000 475.0000 280.0000 Dec 15, 2010 007948 1.0000 325.0000 375.0000 375.0000 Jun 09, 2010 007938 5.0000 200.0000 180.0000 269.5900 May 26, 2010 007921 1.0000 600.0000 250.0000 625.0000 May 05, 2010 007920 8.0000 310.0000 270.0000 350.0000 May 05, 2010 007859 2.0000 275.0000 200.0000 152.7500 Jan 27, 2010 007874 8.0000 300.0000 265.0000 225.0000 Jan 27, 2010 007653 68.0000 180.0000 315.0000 300.0000 Jan 14, 2009 007575 4.0000 200.0000 1360.0000 500.0000 Ju109, 2008 007532 1.0000 400.0000 146.0000 560.0000 Apr 30, 2008 007484 13.0000 72.0000 250.0000 350.0000 Feb 27, 2008 007479 1.0000 400.0000 2500.0000 1100.0000 Feb 21, 2008 http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfin? &Item = 6243 &xRegion = l 9/13/2013 UBA History of Item 0230 EASTERN Region Page 1 of 13 t Mwn I 8uirah I Cmiao# V118QOT I WSDOT Hon-a-1 Unit Bid Analysis History for Standard Item 5711 T L AAV ! V6 B 1-TGU MI V O u.S f w!i M e A) 7' in the NORTHWEST Region To view the detail information for a specfic contract click on Contract Number Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date 008461 3228.0000 2.6700 7.4500 7.5000 Apr 24, 2013 008457 57840.0000 1.9000 4.0000 3.0000 Apr 24, 2013 008438 45140.0000 2.2500 Apr 10, 2013 008423 6100.0000 2.0000 2.7000 4.1000 Apr 03, 2013 008445 33579.0000 2.1000 3.5000 4.0000 Apr 03, 2013 008436 1860.0000 3.2500 3.0000 5.0000 Mar 27, 2013 008439 113742.0000 3.2500 3.2500 3.5000 Mar 27, 2013 008414 698.0000 26.0000 32.0000 24.0000 Mar 13, 2013 008418 400.0000 14.0000 19.0000 12.5000 Feb 21, 2013 008416 1211.0000 11.0000 Feb 21, 2013 008363 1047.0000 6.0000 5.0000 7.9000 Sep 19, 2012 008314 22060.0000 3.0500 6.0000 4.6000 Jun 06, 2012 008307 490.0000 10.0000 12.0000 16.4000 May 31, 2012 008286 14771.0000 3.5000 1.8500 3.0000 May 09, 2012 008271 3230.0000 5.0000 12.2000 Apr 18, 2012 008268 62520.0000 1.8500 1.8400 1.6500 Apr 18, 2012 008269 296.0000 15.0000 16.0000 16.2500 Apr 11, 2012 008258 1628.0000 4.0000 9.1500 6.0000 Mar 28, 2012 008222 8550.0000 2.8000 3.5500 2.2000 Nov 09, 2011 008140 14027.0000 3.4000 2.6500 3.0000 Jun 08, 2011 008142 15271.0000 4.0000 5.7000 5.2000 May 18, 2011 http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.efin? &Item =5711 &xRegion =l 9/12/2013 UBA History of Item 0230 EASTERN Region Page 2 of 13 008141 1800.0000 14.0000 22.2500 17.2000 May 18, 2011 008128 35287.0000 4.0000 2.2000 3.0000 May 18, 2011 008116 5230.0000 8.5000 5.5000 9.0000 Apr 27, 2011 008114 50840.0000 1.7500 1.7000 1.8500 Apr 20, 2011 008112 73040.0000 1.6500 1.2000 1.8000 Apr 13, 2011 008103 93604.0000 1.5000 Apr 06, 2011 008099 4030.0000 3.5000 2.0000 3.2500 Mar 16, 2011 00808..9 260.0000 13.7000 18.0000 8.0000 Mar 09, 2011 008086 2170.0000 3.7500 4.0000 5.7000 Mar 02, 2011 008053 8230.0000 3.0000 3.7500 4.0000 Feb 02, 2011 008065 1950.0000 4.0000 3.2500 3.7500 Jan 12, 2011 008052 29150.0000 2.5000 2.0000 2.8000 Jan 05, 2011 008055 14860.0000 2.3500 3.3000 2.7000 Jan 05, 2011 008051 25920.0000 2.5000 2.8500 2.7000 Dec 15, 2010 008048 1010.0000 12.0000 12.0000 15.0000 Dec 08, 2010 008035 42650.0000 2.0500 Nov 17, 2010 008012 3190.0000 5.0000 3.0000 2.2000 Oct 20, 2010 007962 5450.0000 5.1500 3.5000 4.0000 Jul 14, 2010 007945 48713.0000 1.8500 3.5000 2.4000 Jun 23, 2010 007936 4940.0000 5.0000 7.0000 5.1500 Jun 09, 2010 007948 261.0000 14.0000 16.0000 17.2700 Jun 09, 2010 007938 6452.0000 2.5000 2.0000 1.3700 May 26, 2010 007921 43410.0000 1.5000 2.1000 2.3500 May 05, 2010 007941 147.0000 30.0000 28.0000 20.0000 May 05, 2010 007920 2745.0000 5.0000 2.1000 6.0000 May 05, 2010 007847 995.0000 5.0000 18.0000 16.0000 Apr 14, 2010 007917 2923.0000 3.5000 2.0500 5.0000 Apr 14, 2010 007916 5060.0000 5.0000 3.4200 5.0000 Apr 14, 2010 007911 1047.0000 5.0000 8.1400 6.0000 Mar 31, 2010 007875 74.0000 65.0000 25.0000 48.7100 Feb 03, 2010 007859 6609.0000 2.8500 2.1000 1.3100 Jan 27, 2010 http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item =5711 &xRegion =l 9/12/2013 UBA History of Item 0230 EASTERN Region Page 4 of 13 007531 980.0000 007526 10230.0000 007524 8990.0000 007484 10432.0000 007479 18970.0000 007485 4410.0000 007469 7010.0000 007480 81530.0000 007460 12980.0000 007431 2535.0000 007439 37480.0000 007424 270.0000 007411 42720.0000 007405 2960.0000 007358 320.0000 007354 510.0000 007353 850.0000 007342 312.0000 007337 31019.0000 007320 4400.0000 007315 2070.0000 007317 1119.0000 007298 320.0000 007267 979.0000 007262 355.0000 007272 1601.0000 007264 670.0000 007265 88305.0000 007242 6866.0000 007263 2246.0000 7.0000 3.8000 3.1500 2.7500 3.0000 3.0000 2.5000 2.5000 8.0000 5.0000 2.1000 20.0000 2.6000 2.0000 26.5000 12.0000 13.0000 20.0000 4.5700 5.0000 10.8000 8.0000 9.0000 10.0000 11.0000 6.0000 10.0000 2.5000 2.7500 15.2500 13.0000 11.0000 3.0000 3.5000 3.0000 4.7000 2.1000 2.0000 5.9000 1.6000 3.5000 2.2500 2.5000 7.0000 8.5000 6.8500 6.9000 3.0000 2.5000 25.0000 19.0000 3.7500 5.0000 5.0000 4.0000 18.0000 15.0000 24.0000 25.0000 19.0000 6.3500 4.9000 4.5000 8.0000 8.0000 10.0000 15.0000 9.0000 6.0000 6.0000 5.5000 7.0000 14.0000 20.0000 5.0000 6.0000 8.0000 8.0000 3.3000 3.2500 3.5000 2.3000 10.0000 Apr 23, 2008 Apr 16, 2008 Apr 09, 2008 Feb 27, 2008 Feb 21, 2008 Feb 13, 2008 Feb 13, 2008 Feb 06, 2008 Jan 24, 2008 Dec 12, 2007 Nov 28, 2007 Nov 07, 2007 Oct 17, 2007 Sep 06, 2007 Jun 20, 2007 May 23, 2007 May 23, 2007 May 09, 2007 May 09, 2007 May 02, 2007 Apr 18, 2007 Apr 11, 2007 Mar 28, 2007 Mar 21, 2007 Mar 14, 2007 Mar 07, 2007 Feb 14, 2007 Feb 07, 2007 Feb 07, 2007 Jan 31, 2007 http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item =5711 &xRegion =l 9/12/2013 Unit Bid Analysis - Standard Items Report Page 1 of 1 is== of ThwoportMon Nows I Search I Contact W800T I WSDOT Homo Bid Item Unit Price Tabulation Standard Items Region: Northwest ^Contracts awarded from 9/16/2008 thru 9/16/2013 I 1 UAll J � 1) 14S- 7X K- C0 t '_r Total records found: 8 Standard Item Unit of 10/6/2008 3.50 Job Contract Number Measure Item Description Number Number 5340 TON ASPHALT FOR FOG SEAL 08A009 007621 5340 TON ASPHALT FOR FOG SEAL 08AO22 007630 5340 TON ASPHALT FOR FOG SEAL 09A011 007738 5340 TON ASPHALT FOR FOG SEAL 09A023 007856 5340 TON. ASPHALT FOR.FOG SEAL 10A005 007902 5340 TON ASPHALT FOR FOG SEAL 1OA019 008048 5340 TON ASPHALT FOR FOG SEAL 1OA061 008116 5340 TON ASPHALT FOR FOG SEAL 12AO03 008271 NWR AVERAGE LOW BID is $896.35 State AVERAGE LOW BID is $611.94 Planned Low Second Third AD Date Quantity Bid Bid Bid 10/6/2008 3.50 $1,150.00 $2,500.00 $1,150.00 10127/2008 4.35 $2,750.00 $1,750.00 $1,200.00 4/13/2009 1.97 $1,250.00 $1,800.00 $1,200.00 11/16/2009 1.70 $1,225.00 $1,224.00 $1,350.00 2/16/2010 4.06 $665.00 $800.00 $4,500.00 11/8/2010 36.60 $595.00 $585.00 $450.00 3/21/2011 0.70 $1,200.00 $5,000.00 $2,000.00 3/19/2012 0.43 $4,500.00 $6,500.00 $0.00 Copyright WSDOT m 2001 Traffic & Roads I Site Index I Contact WSDOT I WSDOT Business I WSDOT Home http:// www. wsdot. wa .gov/biz/contaa/uba/sreport.cfm 911612013 UBA History of Item 0230 EASTERN Region Page 1 of 8 News 8gmh I CoolsoMMOT I MODOT Homy arrr Unit Bid Analysis History for Standard Item 5767 MA c). % PG 6 4 -2 2 in the NORTHWEST Region To view the detail information for a specfic contract click on Contract Number Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date 008461 3416.0000 77.0000 77.5000 80.0000 Apr 24, 2013 008457 6210.0000 69.2500 88.0000 100.0000 Apr 24, 2013 008438 4630.0000 77.0000 Apr 10, 2013 008445 4850.0000 70.5000 70.0000 76.0000 Apr 03, 2013 008423 610.0000 93.0000 95.0000 88.0000 Apr 03, 2013 008439 13230.0000 77.0000 77.0000 84.0000 Mar 27, 2013 008436 380.0000 95.0000 100.0000 100.0000 Mar 27, 2013 008414 1242.0000 138.0000 120.0000 115.0000 Mar 13, 2013 008416 760.0000 132.0000 Feb 21, 2013 008418 5696.0000 80.0000 78.0000 79.0000 Feb 21, 2013 008403 160.0000 140.0000 166.0000 146.0000 Jan 24, 2013 008397 35.0000 370.0000 325.0000 250.0000 Jan 09, 2013 008381 626.2000 136.0000 137.0000 135.0000 Dec 12, 2012 008379 764.0000 102.0000 82.0000 100.0000 Nov 15, 2012 008363 5645.0000 67.0000 65.0000 74.7500 Sep 19, 2012 008314 2223.0000 108.5000 120.0000 130.0000 Jun 06, 2012 008307 190.0000 130.0000 125.0000 115.0000 May 31, 2012 008290 4918.0000 78.0000 84.2000 85.0000 May 23, 2012 008286 15517.0000 65.0000 66.0000 68.0000 May 09, 2012 008268 7520.0000 63.0000 70.6000 66.0000 Apr 18, 2012 008269 370.0000 102.0000 107.0000 110.0000 Apr 11, 2012 http:// www. wsdot. wa .gov/biz/contaa/uba/ubahist.ef n? &Item = 5767 &xRegion =l 9/13/2013 UBA History of Item 0230 EASTERN Region 008258 308.0000 145.0000 120.0000 103.0000 008236 625.0000 98.0000 105.0000 110.0000 008222 10127.0000 68.0000 68.0000 68.0000 0081.70 309.0000 93.0000 008140 50450.0000 57.0000 55.0000 56.0000 008142 3509.0000 80.0000 80.0000 74.5000 008141 7540.0000 88.0000 79.5000 90.3000 008128 77876.0000 55.0000 71.0000 50.0000 008130 1160.0000 130.0000 139.1000 135.0000 008116 10003.0000 68.5000 70.0000 69.0000 008114 5860.0000 68.0000 68.0000 72.0000 008112 8574.5000 62.0000 58.0000 67.0000 0081.03 10580.0000 78.0000 008101 1065.0000 77.0000 80.0000 80.0000 008099 1423.0000 75.0000 75.0000 80.0000 008089 270.0000 82.9500 82.0000 83.0000 008086 4389.0000 79.7200 78.0000 80.5000 008077 7300.0000 58.5000 62.0000 70.0000 00805' ) 8024.0000 60.0000 63.0000 62.0000 008060 2045.0000 67.0000 67.0000 72.0000 008065 5304.0000 65.9000 65.9000 66.0000 008055 2999.0000 70.0000 70.0000 73.3000 008052 3891.0000 80.0000 75.0000 77.0000 008051 2720.0000 76.0000 78.8500 95.8000 008035 4410.0000 69.7500 008012 3680.0000 64.0000 65.2500 65.0000 007962 4815.0000 75.0000 67.0000 71.0000 007968 184.0000 112.0000 125.0000 125.0000 007945 25624.0000 60.5000 59.0000 60.0000 007936 25468.0000 61.0000 59.9000 59.9000 007948 6830.0000 61.0000 62.0000 68.0000 Page 2 of 8 Mar 28, 2012 Jan 11, 2012 Nov 09, 2011 Jun 22, 2011 Jun 08, 2011 May 18, 2011 May 18, 2011 May 18, 2011 May 04, 2011 Apr 27, 2011 Apr 20, 2011 Apr 13, 2011 Apr 06, 2011 Mar 23, 2011 Mar 16, 2011 Mar 09, 2011 Mar 02, 2011 Feb 02, 2011 Feb 02, 2011 Jan 12, 2011 Jan 12, 2011 Jan 05, 2011 Jan 05, 2011 Dec 15, 2010 Nov 17, 2010 Oct 20, 2010 Jul 14, 2010 Jun 30, 2010 Jun 23, 2010 Jun 09, 2010 Jun 09, 2010 http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item = 5767 &xRegion =l 9/13/2013 UBA Histo 007949 007938 007940 007941 007921 007920 00791.6 007847 007917 007919 007911. 007870 007875 007859 007874 007856 007860 007843 007801 00778.1 007775 007752 007753 007754 007765 007738 007742 007741 007717 007699 007671 ry of Item 0230 EASTER] 184.0000 125.0000 18720.0000 69.0000 220.0000 95.0000 3.12.0000 86.0000 4460.0000 62.0000 17447.0000 64.0000 4440.0000 84.0000 15921.0000 77.0000 1854.0000 66.0000 46.0000 170.0000 1650.0000 83.0000 2990.0000 88.0000 3115.0000 77.0000 12112.0000 61.8000 6260.0000 75.0000 3634.0000 75.0000 320.0000 164.7500 3570.0000 88.2000 270.0000 300.0000 40.0000 350.0000 82.0000 110.0000 11931.0000 65.0000 12400.0000 69.0000 250.0000 100.0000 310.0000 110.0000 10471.0000 66.0000 323.0000 100.0000 315.0000 115.0000 1210.0000 81.5000 351.0000 135.0000 11030.0000 73.0000 v Region 171.0000 72.0000 90.0000 86.0000 73.0000 60.8500 88.1000 100.0000 73.9300 171.0000 87.1500 90.0000 79.0000 61.5800 80.6500 74.6100 165.0000 84.0000 220.0000 235.0000 68.0000 67.0000 82.0000 135.0000 70.0000 130.0000 130.0000 81.0000 141.0000 71.0000 156.0000 70.0000 105.0000 90.0000 73.5000 62.1000 84.0000 80.0000 70.0000 181.0000 85.0000 88.0000 80.5100 64.2600 77.0000 80.0000 91.0000 250.0000 156.2500 70.0000 120.0500 110.0000 70.0000 150.0000 142.0000 90.0000 135.0000 71.0000 Page 3 of 8 Jun 03, 2010 May 26, 2010 May 12, 2010 May 05, 2010 May 05, 2010 May 05, 2010 Apr 14, 2010 Apr 14, 2010 Apr 14, 2010 Apr 07, 2010 Mar 31, 2010 Feb 10, 2010 Feb 03, 2010 Jan 27, 2010 Jan 27, 2010 Dec 16, 2009 Dec 16, 2009 Nov 18, 2009 Ju122, 2009 Jun 24, 2009 Jun 10, 2009 Jun 10, 2009 May 28, 2009 May 20, 2009 May 20, 2009 May 06, 2009 Apr 29, 2009 Apr 29, 2009 Apr 15, 2009 Mar 25, 2009 Mar 11, 2009 http: / /www.wsdot.wa.gov/ biz /contaa/uba/ubahist.cfm? &Item = 5767 &xRegion =l 9/13/2013 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION AIRPORT IMPROVEMENT PROGRAM CONTRACT CHANGE ORDER NO. 2 or SUPPLEMENTAL- AGREEMENT NO. AIRPORT S03 Ashland Nfunicpat Airport DATE 8 -23 -2011 LOCATION Ashland Oregon AIP PROJECT NO, 3- 41- 0002 -09 CONTRACTOR Knife River Materials You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the engineer: Item No. Description Unit Unit Price Quantity Amount FAA- Fligible Items 1 through 3 , 1 Petro Tac Fabric at Cracks in Overlay Area LF $2,00 1 9 0 0 M $2,160. 0 0 = ;o80 SF � 1 _ 2 Unsuitable Excavation CY $10.00 3855.36 $38,553.60 3 Quarry Spalis TN $16.00 5160.17 $82,562.72 FAA-Eligible Subtotal $123,276.32 Non- Eligible Items 4 through 6 _ 4 Replacement P -154 at Overexcav Areas CY $30.00 577 $17,310.00 �! 5 Rehandle P -154 at Overexcav Areas LS $1,371.27 1 $1,371.2.7 6 Additional QC Testing LS $2,000.00 1 $2,000.00 Non - Eligible Subtotal $20,681.2.7 All Items Total $143,957.59 Previous Chan e Orders Total $27,640.00 Revised Contract Total $1,457,566.59 The time provided for completion in the contract is unchanged. This document shall becorne an amendment to the contract and all provisions of the contract will apply. Recommended by: „I f Enginegr / Date Approved by:� Owner�j p {e Accepted by: .a t f� ,,;. CHARLB U. ROSS ` r 1 �`,...Gor►tractor i CIS ESi1 UOR Date Concurred by: State "Aeronautics (if appjicijble� Date Approved by: federal Aviation Administration Date 2.16o 1: sv 1.20 sV O SY Unit Bid Analysis- Standard Items Report Page 1 of 1 News I Burch I Contact W900T I 1MSDOT Homo state Bid Item Unit Price Tabulation Standard Items Region: Northwest Contracts awarded from 9116/2009 thru 9/16/2013 Standard 007856 11/16/2009 270.00 Item Unit of 09AO09 Number Measure Item Description 0108 L.F. REMOVING CEMENT CONC. CURB 1OA009 007921 AND GUTTER 0108 L.F. REMOVING CEMENT CONC. CURB 09A802 007936 AND GUTTER 0108 L.F. REMOVING CEMENT CONC. CURB 10A039 008055 AND GUTTER 0108 L.F. REMOVING CEMENT CONC. CURB 1OA035 008103 AND GUTTER 0108 L.F. REMOVING CEMENT CONC. CURB 1OA038 008114 AND GUTTER 0108 L.F. REMOVING CEMENT CONC. CURB 1OA034 008128 AND GUTTER 400.00 $7.00. $5.00 REMOVING CEMENT CONC. CURB 0108 L.F. AND GUTTER 103.00 $10.00 $15.00 REMOVING CEMENT CONC. CURB 0108 L.F. AND GUTTER 0108 L.F. REMOVING CEMENT CONC. CURB 12AO14 008381 AND GUTTER 0108 L.F. REMOVING CEMENT CONC. CURB 12AO28 008438 AND GUTTER 0108 L.F. REMOVING CEMENT CONC. CURB 12AO12 008439 AND GUTTER 0108 L.F. REMOVING CEMENT CONC. CURB 12AO17 008457 AND GUTTER 0108 L.F. REMOVING CEMENT CONC. CURB AND GUTTER REMOVING CEMENT CONC. CURB 0108 L.F. AND GUTTER NWR AVERAGE LOW BID is $7.99 State AVERAGE LOW BID is $6.41 Total records found: 14 Job Contract Planned Low Second Third Number Number AD Date Quantity Bid Bid Bid 09AO23 007856 11/16/2009 270.00 $2.00 $7.76 $15.00 09AO09 007920 3/15/2010 462.00 $4.00 $5.00 $4.50 1OA009 007921 3115/2010 17.00 $8.00 $25.00 $82.00 09A802 007936 4/12/2010 1,984.00 $4.00 $4.50 $4.25 10A039 008055 11/22/2010 19.00 $19.00 $9.00 $19.00 1OA035 008103 2/28/2011 3,002.00 $9.46 $0.00 $0.00 1OA038 008114 3/21/2011 942.00 $18.92 $11.00 $22.00 1OA034 008128 4/4/2011 400.00 $7.00. $5.00 $3.25 11A017 008252 2/13/2012 103.00 $10.00 $15.00 $17.00 11A009 008379 10/1/2012 30.00 $15.00 $6.00 $6.00 12AO14 008381 10/1/2012 819.00 $3.50 $3.00 $5.00 12AO28 008438 2/25/2013 169.00 $8.00 $0.00 $0.00 12AO12 008439 2/25/2013 305.00 $10.00 $87.00 $25.00 12AO17 008457 3/25/2013 271.00 $6.00 $10.00 $4.00 Copyright WSDOT © 2001 Traffic & Roads I Site Index I Contact WSDOT I WSDOT Business I WSDOT Home http:// www. wsdot. wa .govibiz/contaa/uba/sreport.cfm 9/16/2013 Unit Bid Analysis- Standard ItQWs Report Page 1 of 85 " Nswrs Sssrch Go11laet YYBDOT WBDOT Horns i Bid Item Unit Price Tabulation Standard Items Region: Northwest Contracts awarded from 9/16/2009 thru 9/16/2013 http:// www. wsdot. wa .govibiz/contaa/uba/sreport.cfm 9/16/2013 Total records found: 2508 <td class =" W" align = "left" colspan ='T' wid Standard Item Unit of Job Contract Planned Second Number Measure Item Description Number Number AD Date Quantity Low Bid Bid Third Bid 6700 L.F. CEMENT CONC. TRAFFIC 09A018 CURB AND GUTTER 007859 11/23/2009 481.00 - $12.25 $9.30 $14.82 6700 L.F. CEMENT CONC. TRAFFIC 09A021 CURB AND GUTTER 007874 12/21/2009 1,848.00 $11.20 $12.30 $13.00, 6700 L.F. CEMENT CONC. TRAFFIC 1OA007 007916 3/8/2010 1,026.00 $25.00 $18.56 $14.65 CURB AND GUTTER 6700 L.F. CEMENT CONC. TRAFFIC 09A009 CURB AND GUTTER 007920 3/15/2010 635.00 $20.00 $20.90 $18.50 6700 L.F. CEMENT CONC. TRAFFIC 10A009 007921 3/15/2010 17.00 $21.00 $30.00 $48.70 CURB AND GUTTER 6700 L.F. CEMENT CONC. TRAFFIC 09A802 CURB AND GUTTER 007936 411212010 125.00 $20.00 $40.00 $20.20 6700 L.F. CEMENT CONC. TRAFFIC 1OA010 007938 4/12/2010 3,368.00 $11.00 $9.00 $8.39 CURB AND GUTTER 6700 L.F. CEMENT CONC. TRAFFIC 1OA008 007948 4/26/2010 1,034.00 $19.00 $24.75 $11.25 CURB AND GUTTER 6700 L.F. CEMENT CONC, TRAFFIC 1OA055 CURB AND GUTTER 008051 11/15/2010 91.00 $34.00 $33.50 $58.00 6700 L.F. CEMENT CONC. TRAFFIC 10A039 CURB AND GUTTER 008055 11/22/2010 11.00 $21.00 $37.00 $21.00 6700 L.F. CEMENT CONC. TRAFFIC 1OA047 008077 1/3/2011 2,199.00 $12.50 $10.00 $12.00 CURB AND GUTTER 6700 L.F. CEMENT CONC. TRAFFIC 10A048 008086 1131/2011 60.00 $11.24 $15.00 $23.00 CURB AND GUTTER 6700 L.F. CEMENT CONC. TRAFFIC 1OA063 008099 2/22/2011 69.00 $55.00 $45.00 $46.00 CURB AND GUTTER 6700 L.F. CEMENT CONC. TRAFFIC 1 OA035 008103 2/28/2011 3,244.00 $16.75 $0.00 $0.00 CURB AND GUTTER 6700 L.F. CEMENT TRAFFIC 10A038 008114 3/21/2011 880.00 $37.99 $25.50 $24.50 CURB AND D GUTTER 6700 L.F. CEMENT CONC. TRAFFIC 1OA034 008128 4/412011 3,838.00 $16.75 $20.00 $19.00 CURB AND GUTTER 6700 L.F. CEMENT CONC. TRAFFIC 1OA046 CURB AND GUTTER 008140 4/18/2011 1,206.00 $16.25 $19.10 $25.00 6700 L.F. CEMENT CONC. TRAFFIC 1OA066 008170 5/23/2011 579.00'' $25.00 $0.00 $0.00 CURB AND GUTTER 6700 L.F. CEMENT CONC. TRAFFIC 10A042 008222 10/3/2011 976.00 $13.50 $13.00 $13.50 CURB AND GUTTER 6700 L.F. CEMENT CONC. TRAFFIC l lAO18 008233 12/5/2011 52.00 $40.00 $62.00 $35.00 CURB AND GUTTER 6700 L.F. CEMENT CONC. TRAFFIC 11A008 CURB AND GUTTER 008236 12/12/2011 920.00 $21.00 $20.00 $20.00 6700 L.F. CEMENT CONC. TRAFFIC l lAO17 008252 2/13/2012 186.00 $59.00 $50.00 $52.00 CURB AND GUTTER 6700 L.F. CEMENT TRAFFIC CURB AND D GUT TER 12AO05 GUT 008307 4/30/2012 308.00 $39.00 $30.00 $37.00 http:// www. wsdot. wa .govibiz/contaa/uba/sreport.cfm 9/16/2013 Unit Bid Analysis- Standard Itw Report Page 38 of 85 State AVERAGE LOW BID IS $30.76 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 6882 Standard HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND HUND RAISED PAVEMENT Unit of Number Measure Item Description 6882 HUND RAISED PAVEMENT MARKER TYPE 1 . 09AO23 007856 11/16/2009 1.00 $750.00 $515.00 $850.00 RAISED PAVEMENT MARKER TYPE 1 6882 HUND RAISED PAVEMENT $320.00 1OA066 MARKER TYPE 1 MARKER TYPE 1 09AO18 007859 11/23/2009 172 $280.00 $280.00 $284.88 RAISED PAVEMENT RAISED PAVEMENT $1,200.00 $2;100.00 MARKER TYPE 1 6882 HUND RAISED PAVEMENT MARKER TYPE 1 09AO27 007870 12/14/2009 12.30 $360.00 $400.00 $350.00 RAISED PAVEMENT $350.00 $400.00 12AO05 008307 4/30/2012 0.40 MARKER TYPE 1 09A009 007920 3/15/2010 6.70 $250.00 $165.00 $185.00 RAISED PAVEMENT MARKER TYPE 1 10A009 007921 3/1512010 14.27 $185.00 $185.00 $185.00 RAISED PAVEMENT MARKER TYPE 1 1 OA004 007925 3/22/2010 0.88 $750.00 $450.00 $380.00 RAISED PAVEMENT MARKER TYPE 1 09A802 007936 4/12/2010 39.00 $165.00 $165.00 $165.00 RAISED PAVEMENT MARKER TYPE 1 10A010 007938 4/12/2010 1.00 $300.00 $350.00 $300.00 RAISED PAVEMENT MARKER TYPE 1 1OA013 007940 4/12/2010 3.00 $200.00 $200.00 $239.00 RAISED PAVEMENT MARKER TYPE 1 09A030 007945 4/26/2010 5.30 $400.00 $300.00 $403.00 RAISED PAVEMENT MARKER TYPE 1 1OA022 007949 5/10/2010 1.53 $300.00 $330.00 $300.00 RAISED PAVEMENT MARKER TYPE 1 1OA020 007951 5/10/2010 5.90 $195.40 $190.00 $175.00 RAISED PAVEMENT MARKER TYPE 1 10A001 007962 5/24/2010 2.65 $300.00 $300.00 $30.00 RAISED PAVEMENT MARKER TYPE 1 1OA031 007968 6/14/2010 1.53 $315.00 $300.00 $350.00 RAISED PAVEMENT MARKER TYPE 1 1OA032 008035 10/18/2010 26.50 $275.00 $0.00 $0.00 RAISED PAVEMENT MARKER TYPE 1 1OA055 008051 11/15/2010 34.16 $160.00 $160.00 $165.00 RAISED PAVEMENT MARKER TYPE 1 1OA029 008052 11/22/2010 2.00 $450.00 $320.00 $470.00 RAISED PAVEMENT MARKER TYPE 1 10A039 008055 11/22/2010 7.00 $185.00 $350.00 $185.00 RAISED PAVEMENT MARKER TYPE 1 10A063 008099 2/22/2011 2.52 $285.00 $320.00 $285.00 RAISED PAVEMENT MARKER TYPE 1 1OA035 008103 2/28/2011 13.00 $182.00 $0.00 $0.00 RAISED PAVEMENT MARKER TYPE 1 1OA038 008114 3/21/2011 87.90 $225.00 $160.00 $145.00 RAISED PAVEMENT MARKER TYPE 1 1OA034 008128 4/4/2011 524.00 $165.00 $170.00 $165.00 Item Unit of Number Measure Item Description 6882 HUND RAISED PAVEMENT Number AD Date MARKER TYPE 1 6882 HUND RAISED PAVEMENT 10A060 008142 MARKER TYPE 1 6882 HUND RAISED PAVEMENT $320.00 1OA066 MARKER TYPE 1 6882 HUND RAISED PAVEMENT $0.00 $0.00 MARKER TYPE 1 6882 HUND RAISED PAVEMENT $1,200.00 $2;100.00 MARKER TYPE 1 6882 HUND RAISED PAVEMENT 9.08 $380.00 MARKER TYPE 1 $250.00 11 A004 RAISED PAVEMENT Job Contract Planned Second Number Number AD Date Quantity Low Bid Bid Third Bid 10A060 008142 4/25/2011 0.40 $320.00 $330.00 $320.00 1OA066 008170 5/23/2011 0.74 $575.00 $0.00 $0.00 llAO13 008211' 8/22/2011 1.74 $1,200.00 $2;100.00 $1,050.00 11 AO15 008286 4/2/2012 9.08 $380.00 $225.00 $250.00 11 A004 008290 4/9/2012 9.50 $350.00 $350.00 $400.00 12AO05 008307 4/30/2012 0.40 $1,020.00 $950.00 $1,150.00 http:// www. wsdot. wa .gov/biz/contaa/uba/sreport.cfm 9/16/2013 Unit Bid Analysis- Standard Item Report Page 39 of 85 6882 HUND MARKER TYPE 1 12AO14 008381 10/1/2012 0.80 $437.00 $425.00 $600.00 6882 HUND RAISED PAVEMENT 12AO21 008414 1/22/2013 1.30 $750.00 $870.00 $750.00 MARKER TYPE 1 6882 HUND RAISED PAVEMENT 12AO15 008416 1/22/2013 18.40 $200.00 $0.00 $0.00 MARKER TYPE 1 6882 HUND RAISED PAVEMENT 12AO18 008418 1/22/2013 1.00 $405.00 $390.00 $380.00 MARKER TYPE 1 6882 HUND RAISED PAVEMENT 12AO23 008436 2/25/2013 4.80 $300.00 $300.00 $380.00 MARKER TYPE 1 6882 HUND RAISED PAVEMENT 12AO12 008439 2/25/2013 7.66 $550.00 $325.00 $425.00 MARKER TYPE 1 6882 HUND RAISED PAVEMENT 12AO17 008457 3/25/2013 0.54 $600.00 $700.00 $500.00 MARKER TYPE 1 6882 HUND RAISED PAVEMENT 13A010 008508 6/24/2013 1.70 $550.00 $650.00 $682.50 MARKER TYPE 1 NWR AVERAGE LOW BID is $199.03 State AVERAGE LOW BID is $206.91 6884 HUND RAISED PAVEMENT 08AO34 007843 10/19/2009 3.97 $475.00 $475.00 $510.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 09A018 007859 11/23/2009 4.30 $575.00 $575.00 $585.01 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 09A027 007870 1211412009 13.80 $410.00 $460.00 $400.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 09A811 007873 12/21/2009 1.80 $500.00 $450.00 $500.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 09AO28 007881 12/28/2009 14.80 $425.00 $463.50 $440.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 10A005 007902 2/16/2010 18.90 $450.00 $350.00 $375.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 1OA003 007919 3/15/2010 0.66 $700.00 $545.00 $570.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 09AO09 007920 3/15/2010 8.70 $300.00 $385.00 $405.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 10A009 007921 3/1512010 4.42 $350.00 $305.00 $305.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 10A004 007925 3/22/2010 0.12 $1,000.00 $625.00 $532.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 09A802 007936 4/12/2010 78.90 $365.00 $365.00 $365.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 10A010 007938 4/1212010 5.00 $450.00 $500.00 $450.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 09A030 007945 4/26/2010 24.78 $450.00 $450.00 $454.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 1OA008 007948 4/26/2010 0.50 $575.00 $525,00 $1,500.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 10A022 007949 5/10/2010 0.51 $500.00 $550.00 $500.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 10A020 007951 5110/2010 3.90 $416.30 $425.00 $375.00 MARKER TYPE 2 Standard J Item Unit of Job Contract Planned Second Number Measure Item Description Number Number AD Date Quantity Low Bid Bid Third Bid 6884 HUND RAISED PAVEMENT 10A001 007962 5/24/2010 1.75 $500.00 $500.00 $550.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 1OA031 007968 6/14/2010 0.51 $530.00 $500.00 $700.00 MARKER TYPE 2 6884 HUND RAISED PAVEMENT 10A032 008035 10/18/2010 9.10 $400.00 $0.00 $0.00 MARKER TYPE 2 RAISED PAVEMENT 1OA055 008051 11/15/2010 8.19 $300.00 $300.00 $255.00 6884 HUND MARKER TYPE 2 http:// www. wsdot. wa .gov /biz/contaa/uba/sreport.cfm 9/16/2013 UBA History of Item 0230 EASTERN Region Page 1 of 12 ,_ r Q 1 111 dip Nava Search I Contact WO OT 1NBDOT Hama CONTRACT , AWARD Unit Bid Analysis History for Standard Item 6882 ilr 0 /A)7- R,'�I5'5P P#tA1 I6WTI R#Ak/t in the NORTHWEST Region To view the detail information for a specfic contract click on Contract Number Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date 008508 1.7000 550.0000 650.0000 682.5000 Jul 24, 2013 008457 0.5400 600.0000 700.0000 500.0000 Apr 24, 2013 008439 7.6600 550.0000 325.0000 425.0000 Mar 27, 2013 008436 4.8000 300.0000 300.0000 380.0000 Mar 27, 2013 008414 1.3000 750.0000 870.0000 750.0000 Mar 13, 2013 008416 18.4000 200.0000 Feb 21, 2013 008418 1.0000 405.0000 390.0000 380.0000 Feb 21, 2013 008381 0.8000 437.0000 10020 425.0000 g1010 600.0000 Ilog Dec 12, 2012 008307 0.4000 1020.0000 950. 000 1150.0000 May 31, 2012 008290 9.5000 350.0000 350.0000 400.0000 May 23, 2012 008286 9.0800 380.0000 225.0000 250.0000 May 09, 2012 008211 1.7400 1200.0000 2100.0000 1050.0000 Sep 08, 2011 008170 0.7400 5:75.0000 Jun 22, 2011 008142 0.4000 320.0000 330.0000 320.0000 May 18, 2011 008128 524.0000 165.0000 170.0000 165.0000 May 18, 2011 008114 87.9000 225.0000 160.0000 145.0000 Apr 20, 2011 008103 13.0000 182.0000 Apr 06, 2011 008099 2.5200 285.0000 320.0000 285.0000 Mar 16, 2011 008055 7.0000 185.0000 350.0000 185.0000 Jan 05, 2011 008052 2.0000 450.0000 320.0000 470.0000 Jan 05, 2011 008051 34.1600 160.0000 160.0000 165.0000 Dec 15, 2010 http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfin? &Item = 6882 &xRegion =l 9/12/2013 UBA History of Item 0230 EASTERN Region 0 11 - 11 1 1**- www" i Page 1 of 10 Msm I 8"rah I Contact VV800T I WBDOT Hoar Unit Bid Analysis History for Standard Item 6806 M10 %/ LINE in the NORTHWEST Region To view the detail information for a specfic contract click on Contract Number Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date 008508 4160.0000 1.1000 0.8000 0.8500 Jul 24, 2013 008457 22605.0000 0.2500 0.3000 0.2000 Apr 24, 2013 008438 24150.0000 0.1600 Apr 10, 2013 008423 17220.0000 0.3000 0.3000 0.3000 Apr 03, 2013 008439 49870.0000 0.1500 0.2200 0.1500 Mar 27, 2013 008436 1500.0000 1.0000 1.2500 1.0000 Mar 27, 2013 008414 9570.0000 0.4000 0.5000 0.4000 Mar 13, 2013 008397 174.0000 3.5000 3.1500 3.0000 Jan 09, 2013 008381 120.0000 1.1000 1.0500 1.2500 Dec 12, 2012 008384 1300.0000 1.0000 2.2000 2.0000 Nov 07, 2012 008363 6435.0000 0.3500 0.3000 0.3000 Sep 19, 2012 008314 200880.0000 0.1100 0.1500 0.2500 Jun 06, 2012 008290 6230.0000 0.5000 0.5000 0.6000 May 23, 2012 008286 44150.0000 0.2500 0.1500 0.1500 May 09, 2012 008271 45950.0000 0.2000 0.2000 Apr 18, 2012 008269 1330.0000 1.0000 1.0000 0.9500 Apr 11, 2012 008258 12160.0000 0.1500 0.2800 0.1200 Mar 28, 2012 008222 13380.0000 0.2500 0.2600 0.2500 Nov 09, 2011 008223 1500.0000 1.1500 1.1500 1.2500 Nov 02, 2011 008170 875.0000 1.2500 Jun 22, 2011 008141 7730.0000 0.2500 0.4000 0.3200 May 18, 2011 http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfin? &Item = 6806 &xRegion =l 9/12/2013 UBA Histoi 008128 008130 008116 008113 008112 008103 008099 008089 008077 008053 008065 008060 008052 008051 008048 008035 008012 007962 007968 007949 007951. 007938 007940 007941 007920 007916 007917 007911 007902 007875 007873 .y of Item 0230 EASTER] 95250.0000 0.1400 2400.0000 0.4500 84745.0000 0.1400 13140.0000 0.5000 43000.0000 0.1600 23114.0000 0.2000 2542.0000 0.5000 1503.0000 1.1500 12220.0000 0.3500 9000.0000 0.2500 14280.0000 0.1300 3600.0000 0.7500 14970.0000 0.2500 760.0000 0.5000 85060.0000 0.1500 13660.0000 0.2500 7760.0000 0.3000 18560.0000 0.2500 2910.0000 0.2500 2910.0000 0.2200 7880.0000 0.3000 19285.0000 0.1800 2000.0000 0.2500 630.0000 1.6000 23935.0000 0.2000 2300.0000 0.5000 4056.0000 0.2500 5240.0000 0.2700 115140.0000 0.1500 6490.0000 0.2000 2280.0000 0.5000 J Region 0.1500 0.4800 0.1400 0.3500 0.1500 1.0000 0.6000 0.3500 0.2600 0.1300 0.4800 0.5000 0.4500 0.1400 0.2900 0.2500 0.2200 0.3000 0.2800 0.2500 0.2500 1.6000 0.2000 0.5300 0.2300 0.5300 0.2000 0.2000 0.5000 0.1500 1.0000 0.1400 0.3200 0.2200 0.5000 0.5000 0.5000 0.2800 0.1500 0.5000 0.2600 0.5500 0.1400 0.3000 0.2500 0.5000 0.2500 0.2500 0.1800 0.3000 2.0000 0.2500 0.3500 0.3000 0.2700 0.1200 0.2100 0.5000 Page 2 of 10 May 18, 2011 May 04, 2011 Apr 27, 2011 Apr 20, 2011 Apr 13, 2011 Apr 06, 2011 Mar 16, 2011 Mar 09, 2011 Feb 02, 2011 Feb 02, 2011 Jan 12, 2011 Jan 12, 2011 Jan 05, 2011 Dec 15, 2010 Dec 08, 2010 Nov 17, 2010 Oct 20, 2010 Jul 14, 2010 Jun 30, 2010 Jun 03, 2010 Jun 03, 2010 May 26, 2010 May 12, 2010 May 05, 2010 May 05, 2010 Apr 14, 2010 Apr 14, 2010 Mar 31, 2010 Mar 10, 2010 Feb 03, 2010 Jan 27, 2010 http:// www. wsdot. wa. gov/bizlcontaa/uba/ubahist.cfm? &Item = 6806 &xRegion =l 9/12/2013 UBA History of Item 0230 EASTERN Region Page 1 of 2 (NMws I Burgh t ow at wwof I w9wr How& Unit Bid Analysis History for Standard Item 6858 in the NORTHWEST Region �P41Kfrin SiJP LILAC To view the detail information for a specfic contract click on Contract Number Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date 008423 32.0000 16.2500 17.0000 15.0000 Apr 03, 2013 008271 100.0000 5.0000 6.0000 Apr 18, 2012 008130 24.0000 10.0000 10.7000 15.0000 May 04, 2011 008116 203.0000 5.0000 5.0000 5.0000 Apr 27, 2011 007920 430.0000 3.0000 2.0000 2.2500 May 05, 2010 007911 60.0000 3.5000 4.7300 4.0000 Mar 31, 2010 007859 70.0000 5.0000 5.0000 5.0900 Jan 27, 2010 007342 57.0000 2.0000 2.0000 2.2500 May 09, 2007 007242 232.0000 3.0000 3.3000 3.2500 Feb 07, 2007 007127 44.0000 2.7000 3.0000 3.0000 Apr 26, 2006 006992 55.0000 5.0000 4.0000 4.0000 Jun 15, 2005 006665 99.0000 1.6000 5.0000 5.0000 Apr 14, 2004 006702 41.0000 5.0000 4.0000 5.0000 Jan 14, 2004 006543 25.0000 11.0000 Apr 02, 2003 006523 73.0000 3.5000 4.0000 4.0000 Mar 26, 2003 006294 297.0000 2.2800 2.0000 2.0000 Mar 20, 2002 006090 24.0000 10.0000 10.0000 May 09, 2001 WSDOT Home ( Unit Bid Analysis / Standard Item Table Inquiry Send owdons "comments about this page to Prolect Develoomenb Washington State DVartment of Transportadon. Pgge last updated September, 1996 Data is updated monthly hq: / /www. wsdot. wa. gov /biz/contaa/uba/ubahist.cfm? &Item = 6858 &xRegion =l 9/12/2013 UBA History of Item 0230 EASTERN Region Page I of 3 Nlwrs I ftamh I Combat W8WT I WSQOT Honit CONTRACT 'D & AWARD Unit Bid Analysis History for Standard Item 6860 `P/9,i ti -1:5 L) I'Y2 i,VW in the NORTHWEST Region To view the detail information for a specfic contract click on Contract Number Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date 008416 2.0000 136.0000 Feb 21, 2013 008379 3.0000 110.0000 110.0000 98.0000 Nov 15, 2012 008290 19.0000 65.0000 65.0000 70.0000 May 23, 2012 008113 2.0000 58.0000 60.0000 55.0000 Apr 20, 2011 007920 57.0000 60.0000 40.0000 45.0000 May 05, 2010 007925 3.0000 90.0000 54.0000 45.6000 Apr 21, 2010 007859 6.0000 40.0000 40.0000 40.7000 Jan 27, 2010 007715 2.0000 110.0000 125.0000 65.0000 Apr 29, 2009 007637 18.0000 50.0000 45.0000 50.0000 Mar 04, 2009 007631 37.0000 50.0000 50.0000 50.0000 Jan 07, 2009 007575 5.0000 500.0000 300.0000 60.0000 Ju109, 2008 007480 163.0000 32.0000 45.0000 32.0000 Feb 06, 2008 007322 8.0000 50.0000 May 02, 2007 007242 23.0000 45.0000 50.0000 50.0000 Feb 07, 2007 007192 26.0000 40.0000 40.0000 35.0000 Aug 16, 2006 007157 3.0000 70.0000 40.0000 55.0000 Jun 07, 2006 007054 6.0000 100.0000 120.0000 Nov 16, 2005 006801 3.0000 64.2500 55.0000 51.0000 Jun 16, 2004 006726 52.0000 29.0000 29.0000 30.0000 May 12, 2004 006768 6.0000 80.5300 51.0000 75.0000 Apr 28, 2004 006711 204.0000 28.0000 21.0000 22.0000 Feb 25, 2004 http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfin? &Item = 6860 &xRegion =l 9/12/2013 UBA History of Item 0230 EASTERN Region 0 W -- --- - --- i Unit Bid Analysis History Page 1 of 10 4 Ntws I tiWm -t emkit WSDDT I 1M8wr Homy for Standard Item 0208 geCmoUIIUG A#JsE D f14U6�M r- &7- I'VAIQIE�A in the NORTHWEST Region To view the detail information for a specfic contract click on Contract Number Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date 008508 6.0000 390.0000 500.0000 525.0000 Jul 24, 2013 008461 5.9000^ 210.0000 367.5000 140.0000 Apr 24, 2013 Z(bo 64 t8aS;V g2,t4.cfr .0 -2,0 008439 2.6000 850.0000 265.0000 620.0000 Mar 27, 2013 190 EA .:z,c19 008414 1.9000 200.0000 40000 350.0000 Mar 13, 2013 008379 3.8000 200.0000 210.0000 185.0000 Nov 15, 2012 008286 13.6200 160.0000 95.0000 100.0000 May 09, 2012 008252 1.2000 500.0000 1500.0000 500.0000 Mar 07, 2012 008128 188.1000 55.0000 60.0000 55.0000 May 18, 2011 008141 13.0000 280.0000 180.0000 134.0000 May 18, 2011 008112 12.2000 88.0000 50.0000 100.0000 Apr 13, 2011 008103 20.0000 104.0000 Apr 06, 2011 008055 9.0000 100.0000 125.0000 85.0000 Jan 05, 2011 008052 9.5000 65.0000 220.0000 160.0000 Jan 05, 2011 007962 4.4500 200.0000 150.0000 162.0000 Jul 14, 2010 007945 36.0000 85.0000 25.0000 86.0000 Jun 23, 2010 007936 84.9000 100.0000 100.0000 100.0000 Jun 09, 2010 007940 2.7000 125.0000 130.0000 150.0000 May 12, 2010 007921 18.6900 0.0100 100.0000 140.0000 May 05, 2010 007920 14.3000 85.0000 40.0000 110.0000 May 05, 2010 007925 1.0000 350.0000 215.0000 200.0000 Apr 21, 2010 007919 0.7700 160.0000 385.0000 403.0000 Apr 07, 2010 http:// www. wsdot. wa. gov/bizlcontaa/uba/ubahist.cfin? &Item = 0208 &xRegion =l 9/12/2013