HomeMy WebLinkAboutCO 07i CHANGE ORDER # AIRPORT.' Renton Municipal Airport LOCATION: Renton, Washington DATE: 8 -21 -13 CONTRACTOR: ICON Materials GRANT #: 3 -53- 0055 -024 This change order was prepared in accordance with FAA Program Guida� ce Letter 12 -03. A price analysis was prepared and it Is recommended that the FAA accept the analysis as evidence of cost reasonableness. You are requested to perform the following described work upon receipt of an �pproved copy of this document or as directed by the Engineer: I Item # Description Unit Unit Price. Quantity Amount Add Bid Item CO -7 -1 (L -824 -C 1 #6 5kV Cable) LF $1.30 1400 $520.00 Subtotal ' State Sales Tax (9.5 %) This Change Order Total Previous Change Order Amount Original Contract Amount Revised Contract Total Recommended by.' ineer, Reid Middleton, Inc. Approved by.- Owner, Cl f on Accepted by: Contractor, ICON erials Accepted by: deral Aviation Administration H.'IDCC22ApO01007 Rentoi 71N B & Srgnage,V'South Taxiway Constructi $520.00 $49.40 $569.40 ($- 16,564.18) $5,460.424.21 $5,444,429.43 Date: Date: 2 Date: i Date: $ 23 l - Orders \CO 7.doex 7 CHANGE ORDER # 7 AIP PROJECT NO. AIRPORT Renton Municipal Airrport LOCATION JUSTIFICATION FOR CHANGE This justification for change was prepared in accordance with Letter 12 -03 1. Brief description of the proposed contract change(s) and to This change order consists of the following: 1. Add new Bid Item M74 "L -824 -C #6 5kV Cable" at LF. RFI #006 (attached) was issued on August 21, 2013 doc 2. Reason(s) for the change(s) (Continue on reverse if necessat On 17 -July -2013, excavation activities on Taxiway B7 and ICON damaged an existing 2 -inch electrical conduit with ca taxiway edge lighting. The conduit was determined to have expected and was regarded as a changed condition. The con project bid item, however there is not project bid item for th This change order establishes installation and payment for re 3. • Justifications for unit prices or total cost: Justification was prepared in accordance with FAA program 4. The sponsor's share of this cost is available from: Port Fund 5. If this is a supplemental agreement involving more than $2,( based on the latest wage rate decision? Yes No l 6. Has consent of surety been obtained? Yes Not Neces 7. Will this change affect the insurance coverage? Yes t 8. If yes, will the policies be extended? Yes No X 9. Has this Change Order been Yes X No When 08/21/13 with FAA Officials? .With Whom Program !Guidance S). bid pride of $1.30 per i nting these revisions. ljacent to Runway 34 by le providing power to hallower cover than uit was replaced using a required #6 *V cable. luired the cable. ,uidance letter 12 -03. 10, is the cost estimate A X ry X X H:Inoc�2s,4p001007 Renton Tvv e & S;yraageVsa.hh Ta iway Construction \Change Orders \CO 7.docx • • Renton Airport Change Order Cost Analysis /Backup for Taxiwa B System Rehabilitation — South Portion Change Order #7 I This cost analysis is prepared in compliance with Program Guidance Letter 12 -03. Comparative costs have been taken from bid prices for other projec s, from construction cost guides and from quotes from suppliers. The quantities to complete each of the 'activities listed below at small in om'parison to the quantities for a typical project, therefore unit pri 'es for the items listed will be higher than expected for a large quantity. 1) Add L -828 -C #6 5kV Cable This activity consists of the following tasks. • Add #6 5kV Cable The proposed unit price of $1.30. per LF for the I 5kV Cable was reviewed by the electrical design attached email from electrical designer dated A The net increase for installation of ap from ICON Materials Conclusion: The requested change order bid item for L -824 -C #6 5kV Cable. )sed new bid item ford the addition of L -824 -C #6 id determined to be fair and reasonable. See t 2, 2013. 0 LF of new L -824 -C #6 5kV Cable at.$1.30 per LF $569.40 a fair and reasonable estimate for addition of a new H:doc /23ap/10/007 Renton TW B & Signage /'south Taxiwa ConsJ C a ge Orders /Renton CO #7 Cost Justification.doc.mic CONTRACT -KCIA RFI Sequence # - 006 REQUEST INFORMAT RFI- []C []A ❑S' ❑M RE C- CIVIL/ LANDSCAPE; A -ARCH; SSTRUC; M- MECH/PLUMB; E- ELECPRICAUCOM CONTRACT TITLE: Renton Taxiway B System Rehabilitation— South Portion Reconstruction PRIME CONTRACTOR: ICON MATERIALS RFI SUBJECT: Innovative Electric Cost Proposals #1 and #3 DATE SUBMITTED: 7/29/13 DATE RESPONSE REQUIRED: ASAP SUCONTRACTOR/ SUPPLIER: Innovative Electric SUCONTRACTOR'S REF. NO.: #01 CONTRACT DOCUMENTS FIFECTED BY THIS RFI: SPECIFICATIONS SECTION Cost proposal DRAWING PLATES S & DETAILS (S): INFORMATION REQUESTED: Please review the following cost pe ICON will provide a formal cost proposal with appropriate markup., 3 osals i i I i #1 & #3 from Innovative Electric4fter review and approval CONTRACTOR'S RECOMMENDATION: I I I l COST ❑ FIRM* RC IM * SCHEDULE: 0 Impact DAYS ❑ FIRM* ROM * DECISION: ❑ CRITICAL (1 -2 days) ® HIGH PRIORITY (3 -5 ay) ❑ LOW PRIORITY (6 -10 days) CONTRACTOR REQUESTS MOD? RE UESTOR'S NA, t Chuck Coffey F_1 I YES I ❑ NO SIGNATURE: Char a 4 Coffey PRIME CONTRA 'S SIGNATURE IF REQUEST BY OTHERS) ❑ DEPENDS ON OWNER RESPONSE RESPONSE: The L -824 -C #6 5kV Cable proposed for installation is accepted. i �I RESPONDENT'S NAME: Michael J. Creeden, PE T : 8/21113 OWNER ENDORSEMENT (IF RESPONSE BY A -E OR OTHERS) i :. OWNER TO ISSUE MOD? OWNER REP. NA ❑ NO SIGNATURE: ❑ YES DATE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT, AN CONTRACTOR'S REQUEST FOR INFORMATION. IT DOES NOT I WORK. IF THE CONTRACTOR CONSIDERS THE RFI RESPONSE CONTRACTING OFFICER'S REPRESENTATIVE IN ACCORDANCI ORDER FOR THE OWNER'S APPROVAL. [[N A �C I I .FORMAL MECHANISM FOR RESPONDING TO 1IDE AUTHORITY TO PROCEED WITH ADDITIONAL ANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE rH CONTRACT PROVISIONS OR PROPOSE A CHANGE i w 4:ZB -S1�03 NOVAI 1 E 06 . I!0 Pox 67#0 A.VHWWOOo,"WA 9.8036. a.0 M M CAC 1 A.L f. 1 N b V O" q Lw-1. INNO VA'1"IVE- 6LtOTRfQ.�TOM CHANGE EST QRDER #3. City of`Rent'on Taxiway,B System South Portion. Reeoust 'ruetion Project No. 0001 -2 13 AIP No. 3- 5- 00'S5�b24 l�.ate :July'��y;2013 To' Reid Middleton, Project Manager Kurt Add cof Sztblec # L 824-C *6 SKY airport cable ad i "tio Change order'request: We are being directed to 'ns it L -824 -C #b :SKY cnsl�s t match;.the exstiw. runway circuiting. The bld schedule ,does not have a4ine:item for %-824-G, #6 SK.V cable ". 'I am' reque ing. .-awamount of $1..13 a LF ir[stalled for #6 cables The 'existtng i#6 cables were not long enough after t ey ad been; removed because the' viing went; fhrougt: fixture D41,.flush,runway light which. was removed during demo: Submitted by: G.:unnar.Petzold ( nar nnovativ =e1 ctri.c.com) i Date, R�eply.Requested: As soon as passible Signed.:. A!E Reply:. A%E response'shall include authorization for Change "to :trac' Sum and or Change ,in Contract Time Prior to contractor: perforirting, additional work A/E shall furnis tten nbti cation to contmdtoi ft r.attrttstnid is M Contract Sum or,Gontract Time. ICON pats ' 4 gas s: 10 ' aieaflne Ave. SE Pacifc WA 98047 (206) 575-3200 4 Fax (206) 5 5 -0319 _ vnmiconmateriah.com sri DINiCvuae, v,w.,; toNioetgK Cost Detail with Categories Project Name: Renton Airport Taxiway "B" ustomer: City Of Renton Job Number: 513302 filling Address: 3555 NE 2ND STREET Bid As: PRIME Renton, WA 98056 Estimator: David Gent f 10hone: 425- 430.7400 Project Address: Renton, WA contact: Completion Date: I Description Quantity UM Dirpo Unit Cost Total Direct Cost Unit.Price Total Price MU% 901 - Add #6 5KV Cable 1.00 LF 1.16 $1.16 $1.30 $1:30 12:07% Labor Wuh2men Material Sub7mGcted TruckIIIg Miscellaneous Plug. Unit: $0.00 $0.00 $0.00 $1.16 $0.00 $0.00 $0.00 Total: $0.00 $0.00 $0.00 $1.16 $0:00 $0.0 $0:00 CEC - 8/1/2013 4:00 PM: ICON Markup for subcontracted work 120)9 =$ .14 (D Innovative Electric 1.00 LS 1:16 $1.16 JobCost]D 50:460 8/1/2013 4:01:33 PM Page I of 2 • 811/2013 4:01:33 PM. Renton Airport Taxiway "B" Page Zof 1 Percent of Amount Direct Cost Labor: $0.00 0.00% EquipmentOwned: $0.00 0100% Equipment Rented: $0.00 0.00% Materials Owned: $0.00 0.00% Materials Purchased: $0.00 0.00% Subcontracted: $1.16 100.00% Trucking Owned: $0.00 0.00% Trucking Hired: $0.00 Miscellaneous: $0.00 0.00% Plug: $0.00 0.00% Direct Cost: $1.16 Percent of Amount Bid Price Total Direct Cost: $1.16 89.23% Total DC Adds /Cuts: $0.00 0100010i Total Indirect Cost: $0:00 0.00 %' Total Bond: $0.00 0.00% Total Overall Cost: $1.16 89.23% Total Overhead: $0.00 0.000/0 Total Profit: $0.14 10.77% Total Margin: $0.14 10.77% Total Bid Price: $1.30 811/2013 4:01:33 PM. Renton Airport Taxiway "B" Page Zof 1 • INNOVATIVE P'428.290.7BC3 F. 42 5 -3 5 &- 16165 lz 1 Fg: f U l -1 r !T3, .0 Im u� P.o. Box 4399 _ EVERETT, WA.98204 COMMERCIAL i I N O LI'd T R I A L INNOVATIVE' ELECT RIC.COM TO: ICON Materials ADDRESS: 1508 Valentine Ave. SE CITY & STATE: Pacific, WA 98047 PHO N E:206- 574 -3906 ATTN: Chuck Coffey. EMAIL: ccoffey@otdcastlematerials.com • DATE: August 1, 201 ,3 JOB: City of Renton Taxiway B System Rehabilitation South Portion Reconstruction AIP No. 3 -537.0055-024 PROJECT NO: 0001 -2013 (Change Order #3 Add #6.5KV cable to bid schedule Labor Hours Labor markup Material Costs Material markup Permit Costs Sub contract work Prime Cost Total Small Tool Allowance Sub -Total Bonds, Permits, Ins. Sales tax 0.0045 Hours @ $66.38 29% 0% of sub total $$ % of TOTAL TOTAL PRICE 21% 3.00% 0.0% CHANGE LARnP Amn UATG.RIAI ROCAtennuum ce%o -rule nuw.Lnrnenrn Subtotal Additive 131 DESCRIPTION QUANITY MATERIAL MATERIAL LABOR. LABOR EACH EACH TOTAL EACH TOAL #6 5KV Cable 1 IFT 1 $0.60 $0.60 0.003 0.003 Misc material 11. $0.02 $0.02 0.0015 0.0015 Total material cost $0.62 Total labor hours 0.0045 0 0 Mike Creeden From: Dean Ralphs <DRalphs @elcon.com> Sent: Friday, August 02, 2013 8:22 AM To: Mike Creeden Cc: Kurt Addicott Subject: RE: Cost proposal for added #6 5KV cable If this is the installed price, then it is a good one. Dean Ralphs 206 -267 -304.7 From: Mike Creeden [ mailto :mcreeden @reidmiddleton.com] Sent: Thursday, August 01, 2013 4:32 PM To: Dean Ralphs Cc: Kurt Addicott; Mike Creeden Subject: FW: Cost proposal for added #6 5KV cable Dean, Attached is ICON's cost proposal to establish the per foot unit price for #6 5kV cable for the project. Please review and give us your response on the reasonableness of their proposal. Thank you. Michael.J. Creeden, PE Project Engineer Reid Middleton, Inc. (425) 741 -5005 From: Coffey, Chuck (ICON, OMG Northwest) [ mailto :ccoffey @oldcastlematerials.com] Sent: Thursday, August 01, 2013 4:20 PM To: Mike Creeden Cc: Kurt Addicott; Babick, Gary (ICON, OMG Northwest); Gent, David (ICON, OMG Northwest) Subject: Cost proposal for added #6 5KV cable Mike, Attached is ICON's Proposal for the #6 5KV cable. Currently there is no bid item for this product. Thanks, Chuck C&atfes E. Coffey ICON MATERIALS Project Manager/ Sr. Estimator Direct (206) 574 -3906 Cell (253) 261 -4443 1