HomeMy WebLinkAboutCO 06CHANGE ORDER # 6 AIRPORT.., Renton Municipal Airport DATE: 8 -13 -13 LOCATION: Renton, Washington GRANT #: 3 -53- 0055 -024 CONTRACTOR: ICON Materials' This change order was prepared in accordance with FAA Program Guidance Letter 12 -03. A price analysis was prepared and it is recommended that the FAA accept the analysis as evidence of cost reasonableness. You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer: Item Description Unit Unit Price Quantity Amount Delete Bid Item 1 -22 (Precast - 1 Junction Box) Each ($6,400.00) 6 ($38,400.00) Delete Bid Item 2 -33 (Precast 2 Junction Box) Each ($6,500.00) 1 ($6,500.00) Add Bid Item CO -6 -1 (Precast 3 Junction Box) Each $4,900.00 6 $29,400.00 Add Bid Item CO -6 -2 (Precast 4 Junction Box) Each $5,000.00 1 $5,000.00 Subtotal ($10,500.00) State Sales Tax (9.5 %) ($997.50) This Change Order Total ($11,497.50) Previous Change Order Amount ($- 5,066.68) Original Contract Amount $5.460.424.21 Revised Contract Total $5,443,860.03 Recommended by Engifi4er, Reid Middleton, Inc. Approved by: Q�i 9 n� Owner, City of JA Eton Accepted by: Accepted by. Contractor, ICON feWials Aviation Administration Date: Date: Z� Date: 3 WO Date. g Z3 /3 H IXOC'123Ap! ?01,007 Rpoto , 71v B & SigI)ag.-J So ,r, Taxiway Construction \Change Orders \CO 6.docx CHANGE ORDER # 6 AIP PROJECT NO. 3 -53- 0055 -024 AIRPORT Renton Municipal Airport LOCATION Renton, WA JUSTIFICATION FOR CHANGE This justification for change was prepared in accordance with FAA Program Guidance Letter 12 -03 l . Brief description of the proposed contract change(s) and locations(s). This change order consists of the following: 1. Delete Bid Item 1 -22 "Precast Junction Box" at original, bid price of $6,400.00 per each. 2. Delete Bid Item 2 -33 "Precast Junction Box" at original bid price of $6,500.00 per each. 3. Add Bid Item CO -6 -1 "Precast Junction Box" replacing: Bid Item 1 -22 at revised unit price of $4,900.00 per each. 4. Add Bid Item CO -6 -2 "Precast Junction Box" replacing Bid Item 2 -33 at revised unit price of $5,000.00 per each. RFI #001 (attached) was issued on May 29, 2013 documenting these revisions. 2. Reason(s) for the change(s) (Continue on reverse if necessary). On 29- May -2013, ICON submitted RFI #1 regarding the need for aircraft rated strength for the precast communication!., junction boxes on the communications duct. All precast junction boxes were determined to be located outside of the Taxiway Safety Area (TSA), therefore boxes rated to meet WSDOT standard H -20 loading may be used. Because the H -20 loading boxes are to a reduced strength, a credit for these items was negotiated. 3. Justifications for unit prices or total cost: Justification was prepared in accordance with FAA: program guidance letter 12 -03. 4. The sponsor's share of this cost is available from: Port Funds 5. If this is a supplemental agreement involving morethan $21000, is the cost estimate based on the latest wage rate decision? Yes No I NA X 6. Has consent of surety been obtained? es Not Necessary X 7. Will this change affect the insurance co erage? Yes NoX 8. If yes, will the policies be extended? es No X I 9. Has this Change Order been discussed ith FAA Officials; Yes X No When 08/01/13 kith Whom; Peter D( KIDOCo 23ApI1010n ReWon ;we & Signag&A'So ith Taxiway Construction \Cha�ge Orders \CO 6.docx CONTRACT -KCIA RFI Sequence # -001 411 NA,44qk 1 REQUEST F9R RFI- 10A ❑S ❑M 'DE INFORMATION C- CIVIL/ LANDSCAPE; A -ARCH; S- STRUC; M- MECAMCUMB; E- ELECTRICAL/COM t lJty t KAIa TITLE: Renton Taxiway B System Rehabilitation— South Portion Recoi PRIME CONTRACTOR: ICON MATERIALS RFI SUBJECT: Communication Junction Boxes DATE SUBMITTED: 5/29/13 DATE RESPC SUCONTRACTOR/ SUPPLIER: Innovative Electric SUCONTRAC CONTRACT DOCUMENTS AFFECT EX46 BY THIS l SPECIFICATIONS SECTION (S): 115 2.2 DRAWING PLATES S & DF,TAILS _(S): C4.IZ44 Detail 1 on Sheet C4.7 INFORMATION REQUESTED: r Please review the following attached RFI #1 from Innovative Electric. I I ave included the suppl suggestions and lead time as stated in Innovative Electrics' RFI #1 The attachments contain our standard structural design and c ,t sheet of the 233 -LA you provided, you will be able to use our standard 233 -LA. If Vve have to go with 106 so I can get proper submittal going. This process will take app ox. 3 weeks and the i slightly different as well. And I've been told the hatches alone t/ take 5-7 weeks tb keep me posted on the direction you will want to go with these '!vaults. l hope you he Dunbar, Brian �'�TRACTOR'S RECOMMENDATION: Review for alterna�alprovidedby nnovatii ±y,vaa�uii. 11U. REF. NO.: #01 information below regarding Ult. Based on our information oading then I will need to know ifiguration of the vaults will be )duce and get delivered. Please great weekend. Thanks. COST: to be determined ❑ FIRM* ❑ R M SCHEDULE: 0 Impact DAYS ❑ FIRM* ❑ R M * DECISION: ❑ CRITICAL (1 -2 days) ® HIGH PRIORITY (3 -5 da s) ❑ LO VV PRIORi 1 ': 6 -10 days) CONTRACTOR RE UESTS MOD? RE UESTOR'S NAMI i !! YES ❑ NO SIGNATURE: . PRIME CONTRACTOR'S SIGNA'T'URE IF If FEW JEST BY OTHERS ❑ DEPENDS ON OWNER RESPONSE RESPONSE: Junction Boxes for the communication conduits on sheets C4.1 to C4.4 are located outside of the Taxi' way Safety Area and may therefore be manufactured to meet WSDOT standard H2O loading. The specifications cle 'rly state the units shall a able of 100k loading and bid as such. We request thecontractor to calculate the appropriate credit to the owner for the requested change to Ale standard unit and resubmit for review. —•-- -- . RESPONDENT'S NAME: Wade Brooks DA'1' 5/29/2013 OWNER ENDORSEMENT (IF RESPONSE BY A -E OR OTHERS): I OWNER TO ISSUE MOD? OWNER REP..NAME: ' ❑ NO SIGNATURE: 1-1 YES DATE' RI'1 SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT AND INFORMAL MECHANI OR RESPONDING TO CONTRACTOR'S REQUEST FOR INFORMATION. IT DOES NOT PRO i, IDE AUTHORITY TO iOCEED WITH WORK. IF THE CONTRACTOR CONSIDERS THE RFI RESPONSE A C iANGED CONDITIONS, I� OVIDE W ITTEN NIO ICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE IN ACCORDANCE WWI ­H CONTRACT PROV CIS OR PROPOSE A CHANGE ORDER FOR THE OWNER'S APPROVAL. i' ! r• i : s i� r ANOVATIVE f�fI(�f F 425;- E lE l`.:...- lr-2 U r� O c'.9 I1 H C11) LYON N W O COMMERCIAL & INOUNTRIAL INNOVA7 TI r7B03 1966 B3 !WA 98036 CL6CTRIO.COM #1 of Renton Taxiway B System Rehabilitation South ration Reconstruction .City Project No. 0001 -2013 AIP No. 3 -53 -00 , . 024 Date: May 28, 2013 To: Reid Middleton, Project Manager Kurt Addieot Subject: Communication 'unction box bid item 1 -22 and 2 -33 } r. Question: Are the communication junction boxes required to have 10 Bid Item # 1 -22 and 2 -33 as shown on drawing C4.1 -C4.4, and detail 11 c section 130 -2.7 precast junction box, which refers to specification section Specification section 115 -2.2 states that precast concrete structures shall t pound aircraft loading and 250psi tire pressure. The lead time on these w vaults are in non aircraft operations areas, in grassy are never subject to that have been previously installed at this airport are standard load bearinj most of them in 2003. 0 pound load ratings? feet C4.7 and specifications -2.2 Concrete Structures. :signed to withstand 100,000 is extremely long. All of these raft operations. All other vaults alts. Innovative Electric installed ly_main concern is the lead time for getting the 100K vaults. I hope t are not required to be 100K .ading due to their location in non aircraft operations areas. Submitted by: Gunnar Petzold ( ui>., i��ai -LDinnovative- el'ctric.com) Date Reply Requested: As soon as possible Signed: A/E Reply: "Signed: A/E response shall not be construed as authorization for, Change to Contra JS 'um or Change in Contract Time -ior to performing additional Work furnish written notification to A/E if Itment in Contract Sum or Contract Time is deemed Necessary. i I Kurt Addicott From: Coffey, Chuck (ICON, OMG Northwest) (ccoffey @old Sent: Tuesday, July 02, 2013 5:41 PM To: Kurt Addicott Cc: Gent, David (ICON, OMG Northwest) Subject: Renton Taxiway B South Electrical Vault Credit Kurt, ematerials.coml As the electrical vaults have changed from Aircraft rated to an H2O rating ICON h Is .'priced the following bid items to show a credit. Bid Item # 1 722 Quantity (6) Original bid price $6,400.00 Ea - New Bid price $4,9 0 00 Ea. Bid Item # 2 -33 Quantity (1) Original Bid Price $6,500.00 Ea - New Bid Price $5,0 0 00 Ea Thanks, Chuck !) i Cfaarles �E. Coffey ICON MATERIALS Project Manager/ 5r. Estimator Direct (206) 574 -3906 Cell(253)261 -4443 Fax(206)57S-3207 1