HomeMy WebLinkAboutCO 06CHANGE ORDER # 6
AIRPORT.., Renton Municipal Airport DATE: 8 -13 -13
LOCATION: Renton, Washington GRANT #: 3 -53- 0055 -024
CONTRACTOR: ICON Materials'
This change order was prepared in accordance with FAA Program Guidance Letter 12 -03. A price
analysis was prepared and it is recommended that the FAA accept the analysis as evidence of
cost reasonableness.
You are requested to perform the following described work upon receipt of an approved copy of this
document or as directed by the Engineer:
Item Description Unit Unit Price Quantity Amount
Delete Bid Item 1 -22 (Precast -
1 Junction Box) Each ($6,400.00) 6 ($38,400.00)
Delete Bid Item 2 -33 (Precast
2 Junction Box) Each ($6,500.00) 1 ($6,500.00)
Add Bid Item CO -6 -1 (Precast
3 Junction Box) Each $4,900.00 6 $29,400.00
Add Bid Item CO -6 -2 (Precast
4 Junction Box) Each $5,000.00 1 $5,000.00
Subtotal ($10,500.00)
State Sales Tax (9.5 %)
($997.50)
This Change Order Total
($11,497.50)
Previous Change Order Amount
($- 5,066.68)
Original Contract Amount
$5.460.424.21
Revised Contract Total
$5,443,860.03
Recommended by
Engifi4er, Reid Middleton, Inc.
Approved by:
Q�i 9
n� Owner, City of JA Eton
Accepted by:
Accepted by.
Contractor, ICON feWials
Aviation Administration
Date:
Date: Z�
Date: 3 WO
Date. g Z3 /3
H IXOC'123Ap! ?01,007 Rpoto , 71v B & SigI)ag.-J So ,r, Taxiway Construction \Change Orders \CO 6.docx
CHANGE ORDER # 6
AIP PROJECT NO. 3 -53- 0055 -024
AIRPORT Renton Municipal Airport LOCATION Renton, WA
JUSTIFICATION FOR CHANGE
This justification for change was prepared in accordance with FAA Program Guidance
Letter 12 -03
l . Brief description of the proposed contract change(s) and locations(s).
This change order consists of the following:
1. Delete Bid Item 1 -22 "Precast Junction Box" at original, bid price of $6,400.00 per
each.
2. Delete Bid Item 2 -33 "Precast Junction Box" at original bid price of $6,500.00 per
each.
3. Add Bid Item CO -6 -1 "Precast Junction Box" replacing: Bid Item 1 -22 at revised
unit price of $4,900.00 per each.
4. Add Bid Item CO -6 -2 "Precast Junction Box" replacing Bid Item 2 -33 at revised
unit price of $5,000.00 per each.
RFI #001 (attached) was issued on May 29, 2013 documenting these revisions.
2. Reason(s) for the change(s) (Continue on reverse if necessary).
On 29- May -2013, ICON submitted RFI #1 regarding the need for aircraft rated
strength for the precast communication!., junction boxes on the communications duct.
All precast junction boxes were determined to be located outside of the Taxiway
Safety Area (TSA), therefore boxes rated to meet WSDOT standard H -20 loading
may be used. Because the H -20 loading boxes are to a reduced strength, a credit for
these items was negotiated.
3. Justifications for unit prices or total cost:
Justification was prepared in accordance with FAA: program guidance letter 12 -03.
4. The sponsor's share of this cost is available from: Port Funds
5. If this is a supplemental agreement involving morethan $21000, is the cost estimate
based on the latest wage rate decision? Yes No I NA X
6. Has consent of surety been obtained? es Not Necessary X
7. Will this change affect the insurance co erage? Yes NoX
8. If yes, will the policies be extended? es No X
I
9. Has this Change Order been discussed ith FAA Officials;
Yes X No When 08/01/13 kith Whom; Peter D(
KIDOCo 23ApI1010n ReWon ;we & Signag&A'So ith Taxiway Construction \Cha�ge Orders \CO 6.docx
CONTRACT -KCIA RFI Sequence
# -001
411 NA,44qk
1
REQUEST F9R RFI- 10A ❑S ❑M 'DE
INFORMATION C- CIVIL/ LANDSCAPE; A -ARCH; S- STRUC;
M- MECAMCUMB; E- ELECTRICAL/COM
t lJty t KAIa TITLE: Renton Taxiway B System Rehabilitation— South Portion Recoi
PRIME CONTRACTOR: ICON MATERIALS
RFI SUBJECT: Communication Junction Boxes
DATE SUBMITTED: 5/29/13 DATE RESPC
SUCONTRACTOR/ SUPPLIER: Innovative Electric SUCONTRAC
CONTRACT DOCUMENTS AFFECT EX46 BY THIS l
SPECIFICATIONS SECTION (S): 115 2.2
DRAWING PLATES S & DF,TAILS _(S): C4.IZ44 Detail 1 on Sheet C4.7
INFORMATION REQUESTED: r
Please review the following attached RFI #1 from Innovative Electric. I I ave included the suppl
suggestions and lead time as stated in Innovative Electrics' RFI #1
The attachments contain our standard structural design and c ,t sheet of the 233 -LA
you provided, you will be able to use our standard 233 -LA. If Vve have to go with 106
so I can get proper submittal going. This process will take app ox. 3 weeks and the i
slightly different as well. And I've been told the hatches alone t/ take 5-7 weeks tb
keep me posted on the direction you will want to go with these
'!vaults. l hope you he
Dunbar, Brian
�'�TRACTOR'S RECOMMENDATION: Review for alterna�alprovidedby nnovatii
±y,vaa�uii. 11U.
REF. NO.: #01
information below regarding
Ult. Based on our information
oading then I will need to know
ifiguration of the vaults will be
)duce and get delivered. Please
great weekend. Thanks.
COST: to be determined
❑ FIRM* ❑ R M
SCHEDULE: 0 Impact DAYS ❑ FIRM* ❑ R M *
DECISION: ❑ CRITICAL (1 -2 days) ® HIGH PRIORITY (3 -5 da s) ❑ LO VV PRIORi 1 ': 6 -10 days)
CONTRACTOR RE UESTS MOD? RE UESTOR'S NAMI i !!
YES ❑ NO SIGNATURE:
.
PRIME CONTRACTOR'S SIGNA'T'URE IF If FEW JEST BY OTHERS
❑ DEPENDS ON OWNER RESPONSE
RESPONSE:
Junction Boxes for the communication conduits on sheets C4.1 to C4.4 are located outside of the Taxi' way Safety Area and may therefore be
manufactured to meet WSDOT standard H2O loading. The specifications cle 'rly state the units shall a able of 100k loading and bid as such.
We request thecontractor to calculate the appropriate credit to the owner for the requested change to Ale standard unit and resubmit for
review. —•-- --
.
RESPONDENT'S NAME: Wade Brooks DA'1' 5/29/2013
OWNER ENDORSEMENT (IF RESPONSE BY A -E OR OTHERS): I
OWNER TO ISSUE MOD? OWNER REP..NAME: '
❑ NO
SIGNATURE:
1-1 YES DATE'
RI'1 SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT AND INFORMAL MECHANI OR RESPONDING TO
CONTRACTOR'S REQUEST FOR INFORMATION. IT DOES NOT PRO i, IDE AUTHORITY TO iOCEED WITH
WORK. IF THE CONTRACTOR CONSIDERS THE RFI RESPONSE A C iANGED CONDITIONS, I� OVIDE W ITTEN NIO ICE TO THE
CONTRACTING OFFICER'S REPRESENTATIVE IN ACCORDANCE WWI H CONTRACT PROV CIS OR PROPOSE A CHANGE
ORDER FOR THE OWNER'S APPROVAL. i' ! r• i : s
i�
r
ANOVATIVE
f�fI(�f F 425;-
E lE l`.:...- lr-2 U r� O c'.9 I1 H C11) LYON N W O
COMMERCIAL & INOUNTRIAL INNOVA7
TI
r7B03
1966
B3
!WA 98036
CL6CTRIO.COM
#1
of Renton Taxiway B System Rehabilitation
South
ration Reconstruction
.City
Project No. 0001 -2013
AIP No. 3 -53 -00
, .
024
Date: May 28, 2013
To: Reid Middleton, Project Manager Kurt Addieot
Subject: Communication 'unction box bid item 1
-22 and 2 -33
}
r.
Question: Are the communication junction boxes required to have 10
Bid Item # 1 -22 and 2 -33 as shown on drawing C4.1 -C4.4, and detail 11 c
section 130 -2.7 precast junction box, which refers to specification section
Specification section 115 -2.2 states that precast concrete structures shall t
pound aircraft loading and 250psi tire pressure. The lead time on these w
vaults are in non aircraft operations areas, in grassy are never subject to
that have been previously installed at this airport are standard load bearinj
most of them in 2003.
0 pound load ratings?
feet C4.7 and specifications
-2.2 Concrete Structures.
:signed to withstand 100,000
is extremely long. All of these
raft operations. All other vaults
alts. Innovative Electric installed
ly_main concern is the lead time for getting the 100K vaults. I hope t are not required to be 100K
.ading due to their location in non aircraft operations areas.
Submitted by: Gunnar Petzold ( ui>., i��ai -LDinnovative- el'ctric.com)
Date Reply Requested: As soon as possible
Signed:
A/E Reply:
"Signed:
A/E response shall not be construed as authorization for, Change to Contra JS 'um or Change in Contract Time
-ior to performing additional Work furnish written notification to A/E if Itment in Contract Sum or
Contract Time is deemed Necessary.
i I
Kurt Addicott
From: Coffey, Chuck (ICON, OMG Northwest) (ccoffey @old
Sent: Tuesday, July 02, 2013 5:41 PM
To: Kurt Addicott
Cc: Gent, David (ICON, OMG Northwest)
Subject: Renton Taxiway B South Electrical Vault Credit
Kurt,
ematerials.coml
As the electrical vaults have changed from Aircraft rated to an H2O rating ICON h Is .'priced the following bid items to
show a credit.
Bid Item # 1 722 Quantity (6) Original bid price $6,400.00 Ea - New Bid price $4,9 0 00 Ea.
Bid Item # 2 -33 Quantity (1) Original Bid Price $6,500.00 Ea - New Bid Price $5,0 0 00 Ea
Thanks,
Chuck
!) i
Cfaarles �E. Coffey
ICON MATERIALS
Project Manager/ 5r. Estimator
Direct (206) 574 -3906
Cell(253)261 -4443
Fax(206)57S-3207
1