HomeMy WebLinkAboutAdden 3 stop AG Ji•,r',it,�"
i� � a CAG-13-019, Adden #3-15
e wltlll at'n =Iit an- Local Agency A Bement Supplement
Agency Supplement Number
City of Renton 3
Federal Aid Project Number Agreement Number CFDA No. 20.205
CM-1292 002 LA 7917 (Catalog of Federal Domestic Assistance
The Local Agency requests to supplement the agreement entered into and executed on 03/07/2013
All provisions in the basic agreement remain in effect except as modified by this supplement.
The changes to the agreement are as follows:
Project Description
Name S 7th St at Shattuck Ave S Improvements Length 0.0 mi
Termini S 7th St west and east of Shattuck Ave S
Description of Work ®No Change
Reason for Supplement
To obligate construction funds.
3 YAW/$r
Does this change require additional Right of Way or Easements? ❑Yes ®No Advertisement Date: F �15
Estimate of Funding
Type of Work (1) (2) (3) (4) (5)
Previous Supplement Estimated Total Estimated Agency Estimated
A reement/Su I. pp Project Funds Funds Federal Funds
PE a.Agency 16 000.00 10.000.00 26,000.00 3,510.00 22 490.00
86.5 0/0 b.Other Consultant 165,503.00 -68,403.00 97,100.00 13,108.00 83,992.00
c.Other non-participation 13,041.00 105,699.00 118,740.00 118 740.00
Federal Aid d.State
Participation 3,468.00 3,468.00 468.00 3,000.00
Ratio for PE e.Total PE Cost Estimate(a+b+c+d) 198 012.00 4729600 245,308.00 135,826.00 109,482.00
Right of Way f.Agency
.Other
Federal Aid h. Other non-participation
Participation 3000000 30,00000 3000000
Ratio for RW i.State
J.Total RAN Cost Estimate(f+g+h+i) 30.000.00 30.000.00 30.000.00
Construction k.Contract 350.000.00 350,000.00 47,250.00 302,750.00
I. Other Consultant 70.000.00 70,000.00 9,450.00 60550.00
86.5 % m.Other non-participation 560,985.00 560,985.00 560.985.00
Federal Aid n.Other
Participation o.Agency 28,466.00 28.466.00 3.843.00 24,623.00
Ratio for CN State 3.000.00 3,000.00 405.001 2.595.00
q.Total CN Cost Estimate k+l+m+n+o 1 012 451.00 110121451.00 621 933.00 390 518.00
r.Total Project Cost Estimate(e+q) 198,012,001 1,089,747.00 1,287,759,00,_787,759,001 500,000.00
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
to payment of the deral funds obligated, it accepts and will comply with the applicable provisions.
Agency Offi I I Washington State Dqpfirtment of Tr portation
By y�ja ®F R > �2//i By .
Title Denis Mayor A' \ 2 director of Local Programs
ATTEST: - MAR O 3 2015
Date Executed
Chris L . Chau, Dep ye
DOT Form 140-041 EF :
Revised 03/2014 ^
ro
. AM
I MW MEN
State cal Agency Federal Aid
-„ biffUllints of TMaillNbehtation Project Prospectus
Prefix Route Date 1/15/2015
Federal Aid DUNS Number
Promect Number CM-1292(002) 092278894
Local Agency (WSDOT 1 Federal Employer
Pmift Number LA 7910 `Use Only) Tax ID Number 916001271
Agency CA Agency Federal Program Title
City of Renton ®Yes ❑No ® 20.205 ❑ Other
Project Title
S 7th St at Shattuck Ave S Improvements Start Latitude N 47°28'25" Start Longitude W 122°12'51"
End Latitude N 47028'25" End Longitude W 122'12'46"
Project Termini From-To Nearest City Name Project Zip Code(+4)
S 7th St west of Shattuck S 7th St east of Shattuck Renton 98057
From To Length of Project Award Type
0.0 mi ® Local ❑ Local Forces ❑ State ❑ Railroad
Federal Agency City Number County Number County Name WSDOT Region
® FHWA ❑ Others 1070 17 Kin Northwest Region
Congressional District Legislative Districts Urban Area Number
9 11 and 37 PSRC
Total Local Agency Phase Start
Phase Estimated Cost Funding Federal Funds Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P.E. $245,300 $135 800 $109.500 06/2013
R/W $30,000 $30000
Const. $1,012,500 $622000
$390,500 02/2015
Total $1,287,800 $787,800 $500,000
Description of Existing-Facility( (Existing Design and Present Condition
Roadway Width Number of Lanes
44 feet varies- 2+ 1 left turn lane NB on S 7th St
S 7th St at Shattuck Ave S has one lane of traffic in each direction,plus a left turn lane from S 7th St into northbound Shattuck
Ave S. Daily traffic volume is 16,000 vehicles.
Description of Proposed Work
Description of Proposed Work(Attach additional sheet(s)if necessary)
This project includes a new traffic signal at S 7th St and Shattuck Ave S,near the South Renton Park&Ride, improving transit
access and transit routing circulation around the Park&Ride. The project will benefit transit routes accessing the Park&Ride.
The new traffic signal will be synchronized to the other existing traffic signals in the corridor and will include Transit Signal
Priority(TSP).The project also includes reconfiguring a RT bus lane to increase radius for better transit access to the South
Renton Park&Ride and reconstructing curb radii to be compliant to ADA standards.
Local Agency Contact Person Title Phone
Juliana Fries Program Development Coordinator 425-430-7232
Mailing Address City State Zip Code
1055 S Grady Way Renton WA 98057
By
Project Prospectus Approval Approving Authority
Title Transportation Design Manager Date ra
DOT Form 140-101 EF Page 1 of 3 ♦ Previous diti ns Obsolete
Revised 04/2014
Agency *4+fProject Title Date
City of Renton S 7th St at Shattuck Ave S Improvements 1/15/2015
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
® New Construction ❑ Path/Trail ❑ 3-R 44 feet 2 +RT lane
❑ Reconstruction ® Pedestrian/Facilities ❑2-R
❑ Railroad ❑ Parking ❑ Other
❑ Bridge
Geometric Design Data
Description Through Route Crossroad
❑ Principal Arterial ❑ Principal Arterial
Federal ® Urban ® Minor Arterial ® Urban ❑ Minor Arterial
El Collector ❑ Rural
Functional ❑ Rural ® Collector
❑ NHS ❑ Major Collector ❑ NHS El Major Collector
Classification ❑ Minor Collector ❑ Minor Collector
❑ Local Access ❑ Local Access
Terrain ® Flat ❑ Roll ❑Mountain ® Flat ❑ Roll ❑Mountain
Posted Speed 25 mph 25 mph
Design Speed 25 m h 25 m h
Existing ADT 13,600 2,300
Design Year ADT N/A N/A
Design Year N/A N/A
Design Hourly Volume(DHV) N/A N/A
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
Consultant 99 % 1 %
Construction Will Be Performed By Contract Agency
Contract 100 % %
Environmental Classification
❑ Class I-Environmental Impact Statement(EIS) ® Class II-Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ® Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III-Environmental Assessment(EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
Environmental Considerations
DOT Form 140-101 EF Page 2 of 3
Revised 04/2014
Agency Project Title Date
City of Renton S 7th St at Shattuck Ave S Improvements 1/15/2015
Right of Way
❑ No Right of Way Required ® Right of Way Required
All construction required by the ® No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
No relocation is anticipated.
FAA Involvement
Is any airport located within 3.2 kilometers(2 miles)of the proposed project? ® Yes ❑ No
Remarks
This project will have no affect on the airport operations.
This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and
is not inconsistent with the agency's comprehensive plan for community development.
Agency
City of Renton
Date I ( � I �% By
Denis Law, Mayor
DOT Form 140-101 EF
Revised 04/2014 Page 3 of 3 ♦ Previous Editions Obsolete
y �
St
t� , ` ani s �s��° Z _ •,€ILE
Ull
W. t "
TH
�a2 a
�ti �_ €�J_ .i� ' ♦ f„ paper,�a
st
NN
~ ;—y�C�x tl i < f ;
t'=- --D 1 cT > N
`o
LLJ
i,.. _ N St P
11 IN I
28t -S P - -_ DQ3 J� JL NE 4th St
sl
St
Sk
` -
5733rdSt tlr � TT
E< NAi ay ;Tti.]I
J/ 52�dSt DDS /
f l/
L
CD
Project Location
�
,flesh-
\ :e*t 03
[16th st
>
w
S
g � J ��m `DAN �9et Dr
—eu• �
w
a
D
`1 Cn
a SW 271SI
A C7!:";\�h StD
> � WCO
�
ai 3 r�
Ui
LU v—fG� -1S
SW 34 St
oI i--T1
Renton - S 7th St at Shattuck Ave S Improvements
Vicinity Map
c,ry or,,
�r" m
3
-c
164 k'
iu
N
C
00
w
Q
J "'C W
4Q
t � c
(U a
Lm
R � �
tj
co
a
n n
�c v
4