HomeMy WebLinkAboutCO 1 CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG 13-037 Emergency Power for CCTF 2013 C.O.# 1
CONTRACTOR: High Mountain Electric, Inc.
SUMMARY OF PROPOSED CHANGE:
Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra
work as outlined below:
Additional Items Under This Change Order Unit Quantity Unit Price Total Price
_-..__...................
ITEM 10: ........ �................... ............--.-..................._. ...._.....�.......__._�............................,..
Change Order#1 LS 1 $5,316.20 $5,316.20
Additional work to add a propane gas detection and automatic shut off
system in the Fluoride Building(safety upgrade)and to extend the
generator exhaust system beyond the Fluoride Building soffit to eject
the exhaust vertically upward(protection of public).
Total ITEM 10 $5,316.20
Sales Tax(9.5%) $505.04
Total Additional Work $5,821.24
ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL
AMOUNT AMOUNT THIS ORDER AFTER CHANGE
$131,838.00 $131,838.00 $5,821.24 $137,659.24
SIGNATURES:
Contractor: Lee R.Barnsley,President Date: December 30,2013
Project Engineer: /��✓vtr� Date: 61 2-01
Approved By: 6jk,/ Date: Joh 201144
(utilities System Director)
H:\File Sys\WTR-Drinking Water Utility\WTR-27-Water Project Files\WTR-27-3583 Emergency Power CCTF 2012\Contractor Payment\CO#l.doc