CHANGE ORDER
aWNER City of Renton
:ARCHITECTS
CITY OF RENTQN, CONTRACTOR. irisEgnia Sign,Inc,-
Project Name City i611-Sign Replacement
Project,-Address 1d55:5outh Grady:Way,
R'entonj WA, Date.1'5 Jul 13:
Change o�#er Nv 1
GontractorOame, Insignia"Sign,'Inc.,
&Address: PO-Box 2849. Gitt►GAG No. CAO a-604,
Renton'W.A:98056
'The Contract is hereby amended;as tolicws:
Additional permit'fees'and tax
Add 175 0I'
Subtotal
Washington State Sales'Tax at 0.50/6:
$ 1A:6!.:
'TOTAL coksTRUCTIoN;COST"IMPACT."t)F THIS.GHANGE.ORDER i..; x Add $; 191 G4
The change order shall'include:a8'Contractor,(4 iabor, material;overhea.-d;:piOfit,and;ait direct andfor indirect costs
allocated,With the Change in Scope of'Wo"rk Excluding Bond Premiul is
This Chshoo,Order.W W,Valid units$signed by the Awner and COntracti5r
The original Cointtact`Sum rime ...........................
...._ .,
S 1"1;255:04
Nett hangeby.pfeviouslyauthorized`Cha(ige;Ordet(s)was; .,,.,... ---- .01
The'Coiltract,5urn pride to;tt is Change Order was:::: :...:..:. ....
...... .....:... ........: =- - S 11,255:00
The Contract Sum will be revised by this Change t5rder i fthe artiount,af.: $
The new:`Contrect Sutra incorpbrating,this Change Oeder wtti be S 1.2,515;87
The Corittadt Tlrne wiil,:be:changed by o days
The Substantial.:Gomple#ion Date including this CfiSftge'Order
4d E:The above summary .does not include any changes in the`=Contract S6#1t6r Cortitrgct Tilde which have beenapproved
by Constru.ction Change Directhre°:or Field birectivevforrns:.
CaWNEt7 CONTRACTOR
t:Ay of Renton Insignia'Sign inc;
Corrimurilty'Sery ces dept: PO.Box 2840
1065"South Grady,Wdy 'Renton,WA,98066;
Renton;Washington"657`
t.
/4 3
-� l3