Loading...
HomeMy WebLinkAboutCO 1 C.O.#1 CITY OF RENTON Page 1 of 1 Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: 2013 Street Patch and Overlay with Curb Ramps CAG-13-103 CONTRACTOR: Lakeside Industries SUMMARY OF PROPOSED CHANGE: Reason/Justification: The contract called for 3 loops to be installed on NE 10th St.. After the contract was awarded,it was noticed that the home runs from the loops on Sunset Blvd NE were cut during the grinding of NE 10th St. Also after the contract was awarded,a thin King County overlay on Renton Ave S has started to delaminate and is in need of a grind and overlay. Lakeside has agreed to use the contract bid items for these extras but requested new bid items for additional Mobilization and Traffic Control. Contract Change:Add 7 induction loops,and add grind and overlay to a portion of Renton Ave S,including additional Mobilization and Traffic Control. Add the followinp quantities to bid item plan quantities in the schedule of prices. Item Approx Units Description Unit Price Amount No. Quantity 22 7 EACH Induction Loops $750.00 $5,250.00 3 39 TON HMA Cl.1/2 IN.PG 64-22 For 2"overlay $80.00 $3,120.00 5 342 SQ YD. Removing Asphalt Concrete Pavement b Cold Planin $8.50 $2,907.00 Total $11,277.00 Add costs for additional work Item Approx Units Description Unit Price Amount No. Quanti 43 1 LS Additional Mobilization $7,000.00 $7,000.00 44 1 LS Additional Traffic Control $8,000.00 $8,000.00 Total Lump Sum items: $16,000.00 Additional cost for increases is other quantities in Contract Change above: $11,277.00 Total for this change order: $26,277.00 All work,materials and measurement to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ORIGINAL CONTRACT CURRENTCONTRACT ESTIMATE NET CHANGE ESTIMATED CONTRACT AMOUNT AMOUNT THIS ORDER TOTAL AFTER CHANGE $647,177.66 $647,177.66 $26,277.00 $673,454.66 Working Days: Two(2)additional working days are granted for the increased work due to this change SIGNATURES: Contractor: Date: Project Manager: Date: Approved By: / Date: rt n Design Engineer) Approved By: Date: (Transportation PI ing and Programming Supervisor)