HomeMy WebLinkAboutCO 1 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 13-114 Renton Hill Alley Sewer Replacement 2013 C.O.# 1 CONTRACTOR: R.L. ALIA COMPANY SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price 016. NEW ITEM:Additional time and materials perforce account work performed LS 1 $12,476.83 $12,476.83 as outlined in the documentation provided by the contractor via letters dated November 8 and 13,2013. Sub Total $12,476.83 Sales Tax (9.5%) $1,185.30 Total $13,662.13 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $188,317.01 /'$1817.01 $13,662.13 $201,979.14 SIGNATURES: Contractor: Date: 111-5-13 Project Engineer: Date: //- /5-/3 Approved By: Date: (Uti hies Sys' Director) H:FileSys\W W P-Wastewater\W W P-27-3678\CO-1-Renton Hill Alley Sewer Repl 2013/JDH R R. L. AL COMPAi4Y GENERAL CONTRACTORS PUMPING STATIONS 107 WILLIAMS AVENUE SOUTH ROAD CONSTRUCTION RENTON,WA 98057 E-MAIL: gjpank @rlalia.com CONCRETE STRUCTURES (425)226-8100 OFFICE dpank @rlalia.com UNDERGROUND UTILITIES (425)226-8649 FAX LARGE DEWATERING EQUIPMENT November 13, 2013 City of Renton 1055 South Grady Way Renton, WA 98057 Re: Renton Hill Sewer Replacement Project Additional Work Performed ATTN: John Hobson John, Please find attached the invoice from Hot Mix Pavers for making the asphalt adjustments around the manholes. As you can see per the spreadsheet, this comes to $2,285.47 including the allowed markup. Let us know if you have any questions. Please include for payment on the next pay estimate. Thank you, R. L. Alia Company Richard L. Alia President CONTRACTOR'S LICENSE NUMBER RL-AL-IC*104PT R. L. Alia Company Work for City of Renton 10/24/2013 Renton Hill Sewer Added Work MH adjustments LABOR Hrs/Units Rate Subtotal Total Superintendent $67.99 $0.00 Foreman $63.22 $0.00 Operator $61.83 $0.00 Pipelayer $50.37 $0.00 Truck Driver $56.00 $0.00 Carpenter $60.02 $0.00 Flagger $41.94 $0.00 0.00 $0.00 29% markup $0.00 $0.00 COMPANY EQUIPMENT 200 Komatsu $64.86 $0.00 938 Loader $52.81 $0.00 Pup Trailer $11.58 $0.00 10 CY Dump Truck $35.96 $0.00 1-Ton $12.39 $0.00 8'X 10'Steel Plates 4 each $1.67 $0.00 JD 160 $58.17 $0.00 Mecahnic 1-Ton $17.00 $0.00 12'X 4'Trench Box $7.85 $0.00 3000 Watt genset&2" pump $9.00 $0.00 $0.00 21% markup $0.00 $0.00 SUCONTRACTORS Hot Mix Pavers 1 $2,040.60 $2,040.60 $0.00 0.00 $2,040.60 12% markup $244.87 $2,285.47 f MATERIALS. RENTALS, OTHER $0.00 $0.00 $0.00 $0.00 0.00 $0.00 21% markup $0.00 $0.00 Total $2,285.47 HOT MIX PAVERS, INC. Invoice 4400 SOUTH 131ST PLACE TUKWILA,WA 98168 DATE INVOICE# PH: 206-324-0106 10/25/2013 14254 FX: 206-325-4473 BILL TO R.L.ALIA COMPANY 107 WILLIAM AVE S RENTON,WA 98057 TERMS ATTENTION PROJECT Net 30 Gary Pankiewi Renton Hill 7th Ave Alley DESCRIPTION QTY U/M RATE AMOUNT 10/24/13 Time& Material ASPHALT PAVING AS DIRECTED 2,040.60 2,040.60 Icon Ticket#53129929 Thanks for your business. Have a nice day! Total $2,040.60 R K R. Lm AL COMPA*IY GENERAL CONTRACTORS PUMPING STATIONS 107 WILLIAMS AVENUE SOUTH ROAD CONSTRUCTION RENTON,WA 98057 E-MAIL: gjpank @rlalia.com CONCRETE STRUCTURES (425)226-8100 OFFICE dpank @rlalia.com UNDERGROUND UTILITIES (425)226-8649 FAX LARGE DEWATERING EQUIPMENT November 8, 2013 City of Renton 1055 South Grady Way Renton, WA 98057 Re: Renton Hill Sewer Replacement Project Additional Work Performed ATTN: John Hobson John, Vito told us that he performed several additional items of work on this project and asked us to price them out and get them to you. Per the attached, these include: • Removed concrete walkway, sidewalk and driveway on 10/14 and 10/16 - $1,798.79 • Grading, compacting and setting forms for all concrete on 10115 - $1,381.61 • Poured concrete and raised manholes on 10/16 - $3,619.68 • Raised manholes, stripped forms and placed culvert apron on 10/17 - $2,352.13 • Build rockery- $320.67 • Culvert replacement - $393.93 • Place remaining topsoil in manhole 5 yard - $324.55 Combined, these total $10,191.36. Let us know if you have any questions. Please include for payment on the next pay estimate. Thank you, R. L. Alia Company Richard L. Al' , President CONTRACTOR'S LICENSE NUMBER RL-AL-IC*104PT R. L. Alia Company Work for City of Renton Date 10/14/2013 Renton Hill Sewer 10/16/2013 Added Work Removed concrete walkway, sidewalk, and driveway. One hour extra for truck driver, dump truck and trailer, plus Renton Recycle ticket for 10/16/13 work. LABOR Hrs/Units Rate Subtotal Total Superintendent $67.99 $0.00 Foreman 5 $63.22 $316.10 Operator 5 $61.83 $309.15 Pipelayer $50.37 $0.00 Cement Mason $59.99 $0.00 Truck Driver 6 $56.00 $336.00 Laborer $49.45 $0.00 Carpenter $60.02 $0.00 Flagger $41.94 $0.00 0.00 $961.25 29% markup $278.76 $1,240.01 COMPANY EQUIPMENT 200 Komatsu $64.86 $0.00 Takeuchi TB Mini Ex $22.76 $0.00 938 Loader $52.81 $0.00 580 Case 5 $24.84 $124.20 10 CY Dump Truck 6 $35.96 $215.76 1-Ton $12.39 $0.00 8'X 10' Steel Plates $1.67 $0.00 JD 160 $58.17 $0.00 Mecahnic 1-Ton $17.00 $0.00 3/4 Ton $9.63 $0.00 Trailer 1 $11.59 $11.59 Jackhammer/Compressor $8.00 $0.00 $351.55 21% markup $73.83 $425.38 SUCONTRACTORS $0.00 0.00 $0.00 12% markup $0.00 $0.00 MATERIALS, RENTALS, OTHER Renton Concrete Recyclers 14 $7.50 $105.00 Renton Concrete Recyclers (Disposal Fee) 1 $5.25 $5.25 $0.00 $0.00 0.00 $110.25 21% markup $23.15 $133.40 Total $1,798.79 ca INVOICE RENTON CONCRETE RECYCLERS LLC w� °'a 22121 17TH AVE S E #117 Cuoxner::::;; 0000008 BOTHELL WA 98021-7404 � .0 425-481-9101 PHONE rctiE `'� �`� ��� 0021 °c,Aj C .: 425-486-3346 FAX uv" 10n6/13 ................................................. ................................................. ................................................. ................................................ ................................................. ................................................. OCT 2 9 2013 Frlor ;;1;111; 0077653 jiff R L ALIA CO 10b RENTON 7v 107 WILLIAMS AVE S fescnponi RENTON,WA 98055 Plant Renton Tctef Rate:; 10/16/13 ...................... ........................................... >#ei # .. .:iDsscrfpUOn ke rct,#Reference;.... Quantify Pfce Total .. 000011 3/4" MINUS 211545 9.50 8.00 76.00 000071 CON HAULBACK 2'-SM 211544 14.00 7.50 105.00 000800 WASTE DISPOSAL SURCH 211544 .00 .00 5.25 ... ....._........ ... ......................._............ .... .......... ...... _...__ ......... ufal Tax ...::.. T�rt� 186.251 .00 186.25 ustomer opy R. L. Alia Company Work for City of Renton Date 10/15/2013 Renton Hill Sewer Added Work Grading, compacting, and setting forms for all concrete LABOR Hrs/Units Rate Subtotal Total Superintendent $67.99 $0.00 Foreman $63.22 $0.00 Operator 5 $61.83 $309.15 Pipelayer $50.37 $0.00 Cement Mason $59.99 $0.00 Truck Driver $56.00 $0.00 Laborer $49.45 $0.00 Carpenter 2 Each 10 $60.02 $600.20 Flagger $41.94 $0.00 0.00 $909.35 29% markup $263.71 $1,173.06 r COMPANY EQUIPMENT 200 Komatsu $64.86 $0.00 Takeuchi TB Mini Ex $22.76 $0.00 938 Loader $52.81 $0.00 580 Case 5 $24.84 $124.20 10 CY Dump Truck $35.96 $0.00 1-Ton $12.39 $0.00 8'X 10' Steel Plates $1.67 $0.00 JD 160 $58.17 $0.00 Mecahnic 1-Ton $17.00 $0.00 3/4 Ton 5 $9.63 $48.15 Trailer $11.59 $0.00 Jackhammer/Compressor $8.00 $0.00 $172.35 21% markup $36.19 $208.54 SUCONTRACTORS $0.00 0.00 $0.00 12% markup $0.00 $0.00 MATERIALS, RENTALS, OTHER $0.00 $0.00 $0.00 $0.00 0.00 $0.00 21% markup $0.00 $0.00 Total $1,381.61 1,30/.!00 R. L. Alia Company Work for City of Renton Date 10/16/2013 Renton Hill Sewer Added Work Poured concrete and raised manholes LABOR Hrs/Units Rate Subtotal Total Superintendent $67.99 $0.00 Foreman 8 $63.22 $505.76 Operator 8 $61.83 $494.64 Pipelayer $50.37 $0.00 Cement Mason $59.99 $0.00 Truck Driver $56.00 $0.00 Laborer $49.45 $0.00 Carpenter 2 Each 16 $60.02 $960.32 Flagger $41.94 $0.00 0.00 $1,960.72 29% markup $568.61 $2,529.33 f COMPANY EQUIPMENT 200 Komatsu $64.86 $0.00 Takeuchi TB Mini Ex $22.76 $0.00 938 Loader $52.81 $0.00 580 Case 6 $24.84 $149.04 10 CY Dump Truck $35.96 $0.00 1-Ton 6 $12.39 $74.34 8'X 10' Steel Plates $1.67 $0.00 JD 160 $58.17 $0.00 Mecahnic 1-Ton $17.00 $0.00 3/4 Ton 6 $9.63 $57.78 Trailer $11.59 $0.00 Jackhammer/Compressor 6 $8.00 $48.00 $329.16 21% markup $69.12 $398.28 r SUCONTRACTORS $0.00 0.00 $0.00 12% markup $0.00 $0.00 MATERIALS. RENTALS, OTHER Stoneway Concrete#811800 1 $571.96 $571.96 $0.00 $0.00 $0.00 0.00 $571.96 21% markup $120.11 $692.07 Total $3,619.68 STONEWA INVOICE NCRET Payment . 9125 - 10th Avenue South' ACCOUNTING: 9125 TENTH AVENUE SOUTH • SEATTLE, WA 98108 • (206)762-2566 Seattle, 0' ACCOUNT ID DELIVERY ADDRESS: 026801 S 7TH ST & S GRANT ST NOV 0 6 2013 SOLD TO: l t R L ALIA COMPANY 107 WILLIAMS AVE S INVOICE NO. DATE PLANT RENTON, WA 98055-2149 811800 10/16/13 011 JOB/P.O.# ORDER# PAGE: 1 000033 416414 ITEM DESCRIPTION QUANTITY UNIT PRICE TAX TOTAL PO NUMBER: . 5810 5 . 75 SK SND 7/8 AIR 3000 PS 5 . 00 CY 87 . 700 N 438 . 50 7531000D JOINT EXP 1/2 X 2 X 10 DEL 4 . 00 EA 2 . 740 N 10 . 96 300016YD MIN HAUL 6YDS OR LESS 1 . 00 EA 100 . 000 N 100 . 00 30075 ENVIRONMENTAL SURCHARGE 5. 00 CY 4 . 500 N 22 . 50 30080 READY MIX FUEL SURCHARGE 5. 00 CY 0 . 000 N 0. 00 ICKETS: 011-440706 SUBTOTAL 571 . 96 SALES TAX Total Yds Concrete $ Supplies $ Misc $ Labor $ 5 . 00 438 . 50 122 . 50 10 . 96 0 . 00 0 . 00 INVOICE TOTAL 57 6 REV 01/12 IFL R. L. Alia Company Work for City of Renton Date 10/17/2013 Renton Hill Sewer Added Work Raised manholes, stripped forms, placed culvert apron LABOR Hrs/Units Rate Subtotal Total Superintendent $67.99 $0.00 Foreman 6 $63.22 $379.32 Operator $61.83 $0.00 Pipelayer $50.37 $0.00 Cement Mason $59.99 $0.00 Truck Driver 2 $56.00 $112.00 Laborer $49.45 $0.00 Carpenter 2 Ea 12 $60.02 $720.24 Flagger $41.94 $0.00 0.00 $1,211.56 29% markup $351.35 $1,562.91 COMPANY EQUIPMENT 200 Komatsu $64.86 $0.00 Takeuchi TB Mini Ex $22.76 $0.00 938 Loader $52.81 $0.00 580 Case 6 $24.84 $149.04 10 CY Dump Truck 2 $35.96 $71.92 1-Ton 6 $12.39 $74.34 8'X 10' Steel Plates $1.67 $0.00 JD 160 $58.17 $0.00 Mecahnic 1-Ton $17.00 $0.00 3/4 Ton $9.63 $0.00 Trailer $11.59 $0.00 Jackhammer/Compressor 6 $8.00 $48.00 $343.30 21% markup $72.09 $415.39 SUCONTRACTORS $0.00 0.00 $0.00 12% markup $0.00 $0.00 MATERIALS, RENTALS, OTHER Stoneway Concrete#810727 1 $115.13 $115.13 United Rentals#114934539-001 1 $193.82 $193.82 $0.00 $0.00 0.00 $308.95 21% markup $64.88 $373.83 Total $2,352.13 ✓ STONEW - INVOICE OCT 213 Payment �NCRE , _ : Concrete •125 - 10th Avenue ACCOUNTING: 9125 TENTH AVENUE SOUTH • SEATTLE, WA 98108 • (206) 762-2566 Seattle, WA ' ACCOUNT ID DELIVERY ADDRESS: 026801 PICK UP PLANT 14 SOLD TO: i �` - ii R L ALIA COMPANY 107 WILLIAMS AVE S INVOICE NO. DATE PLANT RENTON, WA 98055-2149 810727 10/17/13 014 JOB/RO.# ORDER# PAGE: 1 000008 416658 ITEM DESCRIPTION QUANTITY UNIT PRICE TAX TOTAL PO NUMBER: RON 000 5 . 0 SK SND 7/8 3000 PSI C 1 . 50 CY 72 . 250 N 108 . 38 0075 ENVIRONMENTAL SURCHARGE 1 . 50 CY 4 . 500 N 6. 75 ICKETS: 014-441011 SUBTOTAL 115 . 13 Total Yds Concrete $ Supplies $ Misc $ Labor $ SALES TAX 1 . 50 108 . 38 6. 75 0 . 00 0 . 00 0 . 00 INVOICE TOTAL 115 . 13 REV 01/12 IFL OUnited Rentals° ENT AL RETURN Zw- 425-656:5940 BRANCH 652 3 A400 LIND AVENUE RENTON WA 0057 # 114934539-001 425-251 9041 FAX Customer # : 225308 OCT 2 5 2013 Invoice Date 10/18/13 W WILL CALL 652 Rental Out 10/15/13 02:11 PM Rental In 10/18/13 01:14 PM 3400 LIND AVE SW UR Job Loc WILL CALL RENTON 465 RENTON WA 98057-4925 UR Job # 8 - RL ALIA CONSTRUC Customer Job ID: P.O. # RENTON SEWER I It Office: 425-226-8100 Cell: 206-423-3680 Ordered By VITO Written By DARREL HAMMOND 8.7.2935 1 MB 0.405 99687S21.p14 626586279 1-1 0 Salesperson CHRISTOPHER BROWNING Invoice Amount: $193.82 RL ALIA CONSTRUCTION - Terms: Due Upon Receipt 107 WILLIAMS AVE S 2ayment options: Contact our credit office 877-509-2400 RENTON WA 98057-2149 REMIT To: UNITED RENTALS(NORTH AMERICA),INC. FILE 51122 LOS ANGELES CA 90074-1122 RENTAL ITEMS: Qty Equipment Description Minimum Day Week 4 Week Amount 1 10130738 AIR PAVEMENT BREAKER 60# 62.00 177.00 439.00 177.00 Make: APT Model: M160 Serial: 412465 Rental Subtotal: 177.00 Agreement Subtotal: 177.00 Tax: 16.82 COMMENTS/NOTES: ` Total: 193.82 CONTACT: VITO ALIA \) CELL#: 425-213-2494 THIS INVOICE IS ISSUED SUBJECT TO THE TERMS AND CONDITIONS OF THE RENTAL AGREEMENT,WHICH ARE INCORPORATED HEREIN BY REFERENCE. A COPY OF THE RENTAL AGREEMENT IS AVAILABLE UPON REQUEST. Page: 1 R. L. Alia Company Work for City of Renton Date Renton Hill Sewer Added Work Build Rockery LABOR Hrs/Units Rate Subtotal Total Superintendent $67.99 $0.00 Foreman 2 $63.22 $126.44 Operator $61.83 $0.00 Pipelayer $50.37 $0.00 Cement Mason $59.99 $0.00 Truck Driver $56.00 $0.00 Laborer 2 $49.45 $98.90 Carpenter $60.02 $0.00 Flagger $41.94 $0.00 0.00 $225.34 29% markup $65.35 $290.69 -- COMPANY EQUIPMENT 200 Komatsu $64.86 $0.00 Takeuchi TB Mini Ex $22.76 $0.00 580 Case $24.84 $0.00 938 Loader $52.81 $0.00 Pup Trailer $11.58 $0.00 10 CY Dump Truck $35.96 $0.00 1 Jon 2 $12.39 $24.78 8'X 10' Steel Plates 4 each $1.67 $0.00 JD 160 $58.17 $0.00 Mecahnic 1-Ton $17.00 $0.00 3/4 Ton $9.63 $0.00 3000 Watt genset&2" pump $9.00 $0.00 $24.78 21% markup $5.20 $29.98 SUCONTRACTORS $0.00 $0.00 0.00 $0.00 12% markup $0.00 $0.00 MATERIALS, RENTALS, OTHER $0.00 $0.00 $0.00 0.00 $0.00 21% markup $0.00 $0.00 Total $320.67 R. L. Alia Company Work for City of Renton Date Renton Hill Sewer Added Work Culvert Replacement LABOR Hrs/Units Rate Subtotal Total Superintendent $67.99 $0.00 Foreman 1 $63.22 $63.22 Operator 1 $61.83 $61.83 Pipelayer $50.37 $0.00 Cement Mason 1 $59.99 $59.99 Truck Driver $56.00 $0.00 Laborer 1 $49.45 $49.45 Carpenter $60.02 $0.00 Flagger $41.94 $0.00 0.00 $234.49 29% markup $68.00 $302.49 COMPANY EQUIPMENT 200 Komatsu $64.86 $0.00 Takeuchi TB Mini Ex 1 $22.76 $22.76 580 Case $24.84 $0.00 938 Loader 1 $52.81 $52.81 Pup Trailer $11.58 $0.00 10 CY Dump Truck $35.96 $0.00 1-Ton $12.39 $0.00 8'X 10' Steel Plates 4 each $1.67 $0.00 JD 160 $58.17 $0.00 Mecahnic 1-Ton $17.00 $0.00 3/4 Ton $9.63 $0.00 3000 Watt genset&2" pump $9.00 $0.00 $75.57 21% markup $15.87 $91.44 v SUCONTRACTORS $0.00 $0.00 0.00 $0.00 12% markup $0.00 $0.00 MATERIALS, RENTALS, OTHER $0.00 $0.00 $0.00 0.00 $0.00 21% markup $0.00 $0.00 Total $393.93 • err' R. L. Alia Company Work for City of Renton Date Renton Hill Sewer Added Work Place remaining topsoil in manhole 5 yard LABOR Hrs/Units Rate Subtotal Total Superintendent $67.99 $0.00 Foreman $63.22 $0.00 Operator $61.83 $0.00 Pipelayer $50.37 $0.00 Cement Mason $59.99 $0.00 Truck Driver 1 $56.00 $56.00 Laborer 1 $49.45 $49.45 Carpenter $60.02 $0.00 Flagger $41.94 $0.00 0.00 $105.45 29% markup $30.58 $136.03 COMPANY EQUIPMENT 200 Komatsu $64.86 $0.00 Takeuchi TB Mini Ex $22.76 $0.00 938 Loader $52.81 $0.00 580 Case 1 $24.84 $24.84 10 CY Dump Truck 1 $35.96 $35.96 1-Ton $12.39 $0.00 8'X 10' Steel Plates $1.67 $0.00 JD 160 $58.17 $0.00 Mecahnic 1-Ton $17.00 $0.00 3/4 Ton $9.63 $0.00 Trailer $11.59 $0.00 Jackhammer/Compressor $8.00 $0.00 $60.80 21% markup $12.77 $73.57 - SUCONTRACTORS $0.00 0.00 $0.00 12% markup $0.00 $0.00 MATERIALS. RENTALS, OTHER Carpinito Brothers#103226 1 $95.00 $95.00 $0.00 $0.00 $0.00 0.00 $95.00 21% markup $19.95 $114.95 ✓ Total $324.55 Carpinito Brothers, Inc. M103246 1148 N. Central Avenue ; Kent, WA 98032 (253)854-5692 or(206)623-8103 t i DATE tom : SOLD TO: - SHIP TO: ti Er �j i SAKE MAN,, CASH CHARGE RESALE TERMS P.O.11/AUTHORIZATION# QUANTITY QUANTITY ' _ -:- UNIT ORDERED SHIPPED DESCRIPTION PRICE TOTAL ......................... .................................................................................................................................................. -A.................................... ......... —�.. I......-.... ...... . ,: i ...................... .......................... .......................................................................................... - . Y ......................... .................................................................................................................................................. ;. .................. ......... .. O} ... ...... ......... ... f ......... .......... .. i ......., '... y Received by f SUB TOTAL Customer agrees not to h"( arpinito Brothers, Inc.responsible for any %Tax damages caused by tho tick driving over property at customer's request. j Customer is liable for towing cost should the truck get stuck on customer TOTAL AMOUNT property. All accounts are due net 10th,past due accounts s ect2 finance charge plus collection expenses and reasonable attorRey fees. CB-03 i i - R� All- 70e ,To /•tt - G' Hf� 7- 1 l ,�eed : Ctrs L./Ive f''-� __._----- jn my 5' p se