HomeMy WebLinkAboutAdden 1 CAG-13-161 , Adden #1-15
AMENDMENT NUMBER ONE TO THE AGREEMENT
BETWEEN PUGET SOUND REFRIGERATON MECHANICAL AND
THE CITY OF RENTON,WASHINGTON
This amendment is entered into between the City of Renton (City) and Puget Sound Refrigeration
Mechanical and amends and attaches to and is part of the existing Agreement entered into previously
between the parties on August 14, 2013, (Reference:CAG#13—161).
The parties agree to the following amendments:
Item 3. Time of Performance:
The Time of Performance for the Agreement(CAG-13-161), shall be extended to cover
July 1st,2015 through June 30th 2016.
Item 5. Contract Sum:
The total amount of the contract shall remain the same in this amendment, $8,856.36 which
include Washington State Sales Tax.
In all other respects, the Scope of Services, Changes in Scope of Services, Method of Payment, Prevailing
Wages, Warranty, Independent Contractor, Discrimination Prohibited, Assignment and Subcontract,
Record Keeping and Reporting, Hold Harmless, Termination, Renton Business License, Insurance and
Exhibits to Agreements of both parties shall remain the same as agreed to in the Puget Sound
Refrigeration Mechanical contract.
This Agreement is entered into as of the day and year written below.
CONTRACTOR CITY OF RENTON
Signa Signature
Date Date
'g?6try
Printed Name and Title Terry Higashiyama, Administrator
Business Name
Mailing Address
(,IA
City State Zip