Loading...
HomeMy WebLinkAboutCO 2CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG -13 -171, NE 5th PL / Edmonds Ave NE Storm System Improv. Project C.O.# 2 and NE 5th PL Water Main Replacement Project CONTRACTOR: R.L. Aiia Company SUMMARY OF PROPOSED CHANGE: CO -2 Remove and Dispose of Buried Heating Oil Tank (on Schedule B) LS On December 18, 2013 the contractor encountered a buried residential heating oil tank at 679 Camas Ave NE while excavating to replace the sewer tee for Schedule B, Bid Item B -01. The contractor contacted a heating oil tank removal company to obtain a Residential Underground Heating Oil Tank Removal permit from the City and to dispose of the tank. The December 20th letter from R.L. Alia Company gives the costs for removal and disposal as $1, 039.39. Remove and Dispose of Oil Tank lump sum at $1,039.39 = $1,039.39 9.5 % sales Tax = $98.74 TOTAL CHANGE ORDER COST = $1,138.13 Additional Working Days added to the Contract for this Change Order: none ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $1,579,245.08 $1,523rZ45,Q $1,138.13 $1,594,383.21 SIGNATURES Contractor: Project Engir Approved By Date: /- 7 Date: Date: /— 8 —! q H: \FNe Sys\$WP- Surface Water Projects \SWP•27 - Surface Water Projects (CIP)\27 -2306 NE 5th- Edmands \1012 Change Orders \CO -2 FINAL Oil Tank Removal.doc \DCtp M. R. L. ALIA COMPANY GENERAL CONTRACTORS PUMPING STATIONS 107 WILLIAMS AVENUE SOUTH ROAD CONSTRUCTION RENTON, WA 98057 E -MAIL: gipank @rialia.com CONCRETE STRUCTURES (425) 226 - 8100 OFFICE dpank @rlalia.com UNDERGROUND UTILITIES (425) 226 - 8649 FAX LARGE DEWATERING EQUIPMENT December 20, 2013 City of Renton 1055 South Grady Way Renton, WA 98057 Re: NE 5TH Place/Edmonds Ave NE — Storm System Improvement and Watermain Replacement Added Work ATTN: Daniel Carey Daniel, Alia encountered an unknown oil tank on 12/18/13. Alia, excavated, removed and loaded it out to a certified tank removal contractor. As you can see per the attached spreadsheet, the cost to perform this added work comes to $1,039.39. Please include for payment on the next pay estimate. Thank you, R. L. Alia Company Richard L. Alia, President CONTRACTOR'S LICENSE NUMBER RL- AL- IC *104PT R. L. Alia Company Work for City of Renton NE 5th Place Storm/Edmonds Ave Added Work Oil Tank Removal LABOR Superintendent Foreman Operator Pipelayer Truck Driver Carpenter Flagger Laborer - 60% Apprentice 29% markup COMPANY EQUIPMENT 200 Komatsu 938 Loader Pup Trailer 10 CY Dump Truck 1 -Ton 8'X 10' Steel Plates 4 each JD 160 Mecahnic 1 -Ton 12'X 4' Trench Box 3000 Watt genset & 2" pump SUCONTRACTORS 21 % markup 12% markup MATERIALS. RENTALS. OTHER Alia costs to excavate, remove and load out Tanks By Dallas 21% markup Total 12/18/2013 Hm/UniW Rate Subtotal Total $68.41 $0.00 $63.64 $0.00 $62.25 $0.00 $50.79 $0.00 $56.68 $0.00 $60.44 $0.00 $42.30 $0.00 $34.78 $0.00 $9.00 $0.00 0.00 $0.00 $64.86 $0.00 $52.81 $0.00 $11.58 $0.00 $35.96 $0.00 $12.39 $0.00 $1.67 $0.00 $58.17 $0.00 $17.00 $0.00 $7.85 $0.00 $9.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 0.00 $0.00 0.00 $0.00 1 $250.00 $250.00 1 $609.00 $609.00 $0.00 $0.00 0.00 $859.00 180.39 $1,039.39 $1,039.39 TANKS BY DALLAS 17552 Ballinger Way Lake Forest Park, WA. 98155 T'206.365.0291 F: 206,361.0992 tanksbvdallas6hotmail.com www.tanksbydallas.net CUSTC"°°• NAME: INVOICE DATE PHONE: A EMAIL: i + Intl I(I V_ t� r, /l 1 i A 0 hYNn i6Yt s �Ow i d BILLING: LABOR: L� , PERMITS: MATERIALS: 60 q LOCATE: SOIL SAMPES: OTHER: TAX: Y j TOTAL OU THANK YOU FOR YOUR SUSINESSI "Payments are due within 15 days of billing. Late payments are subject to late fees of $25 fee + 1.5% interest per month and/or collection fees. " � � I Oil Tank Decommissioning Certificate Tanks By Dallas has decommissioned the oil tank at: IFCI UST Certificate Num Decommissioner's signatu Name Expiration Date r— Approximate age of tank: (�_ Tank size: Last contents of tank: Soil contamination observed: KL Decommissioning Type: Fill in Place Removal__ Date of The work was done in accordance with local and state regulations. Tanks By Dallas has made all means to leave the site as close as possible to its original condition. Tanks By Dallas is not liable for any underground conditions at this time or any in the future. Any and atl know underground conditions and any potential unknown underground conditions have been property conveyed to the person authorizing the tank work. This certificate is the result of a binding agreement/ contract produced prior to commencement of the tank decommissioning. "The ICC certified UST decommissioner noted above is responsible for notifying the person authorizing the work of a confirmed petroleum release, leak or spill. As the responsible party authorizing the work, said party must have responsibilities under the law to report petroleum release, leaks or spills to the appropriate state or federal agencies. Tanks By Dallas 17552 Ballinger WY NE Lake Forest Park, WA 98155 206 - 365.0291 Fax 206 - 361 -0991 Email tanksbvdallas @hotmail.com Website tanksbydallas.net