SUMMARY OF PROPOSED CHANGE:
Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra
work as outlined below:
ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price
022. NEW ITEM: Additional time and materials to purchase and install additional LS 1 $667.95 $667.95
spools and couplings for the force main in the wetwell.
023. NEW ITEM: Additional time and materials to provide and install door hardware. LS 1 $650.72 $650.72
024. NEW ITEM: Additional labor and equipment costs to repair mis-marked existing LS 1 $5,370.53 $5,370.53
City of Renton 12"sanitary sewer main.
025. NEW ITEM: Additional labor, equipment,and material costs to remove and LS 1 $1,750.37 $1,750.37
replace existing Misty Cove L.S.suction line to allow installation
of new gravity sewer between the new and existing lift stations.
Sub Total $8,439.57
Sales Tax (9.5%) $801.76
Total $9,241.33
ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL
AMOUNT AMOUNT THIS ORDER AFTER CHANGE
$820,877.70 $820,877.70 $9,241.33 $830,119.03
SIGNATURES:
Contractor: Date:
Project Engineer: Date:
Approved By: Date: lrliC
Uti it tor)
H:FileSys\W W P-W astewater\W W P-27-3627\CO-1 Misty Cove Lift Station RepUJDH
NOM01 ME *At##
GARY HARPER CONSTRUCTION INC.
14831 223rd Street SE Snohomish, WA 98296-3989
(360) 863-1955 Fax (360) 863-1966
January 27, 2013
City of Renton
Attn:John Hobson
1055 S Grady Way
Renton,WA 98057
Re: Misty Cove Lift Station Replacement, Project#WWP-27-3678
Change Order Proposal No. 1 for RFI#4
Cost to purchase and install 2 each 4"X 1'6"groove X groove prime coated spools and 2 each
grooved couplings.
Labor to Install
Millwright (Lead) 2.00 hrs @ 64.72 129.44
Pipelayer 2.00 hrs @ 52.67 105.34
Subtotal 234.78
Overhead & Profit 29% 68.09
Total Labor 302.87
Materials
2 groove X groove spools 131.60
2 grooved couplings 170.12
Subtotal 301.72
Overhead &Profit 21% 63.36
Total Equipment&Materials 365.08
Total Change Order Proposal No.1 for RFI#4 $ 667.95
°w.r
GARY HARPER CONSTRUCTION INC.
14831 223rd Street SE Snohomish, WA 98296-3989
(360) 863-1955 Fax (360) 863-1966
Labor Rates
King
Rates eff- 10/22/2013
Hourly Total Total OT
Rates as listed on chart Rate Fica Emp Sec L&I Futa Cost per hr Cost per hr
Andrew-Millwright(lead) 55.00 4.21 3.21 1.86 0.44 64.72 97.08
Justin-Millwright 53.00 4.05 3.10 1.86 0.42 62.43 93.65
Richard -Pipe Layer 44.46 3.40 2.60 1.86 0.36 52.67 79.01
Gary-Superintendent 70,00 5.36 0.56 75.92 113.87
Gary Harper
From: Julie.Stutzman @Ferguson.com
Sent: Monday, December 30, 2013 2:14 PM
To: gary@garyharperconst.com
Subject: FW: Misty Cove RFI's
Attachments: Misty Cove RFI's.pdf
Gary,
RFI #004.0
The longest spool length is 19'6", so add the following: f- G ��
2 each 4"x1'6" groove x groove, prime coated $65.80 each
2 each 4"grooved couplings$85.06 each
We should verify the overall lengths prior to order.
Thanks Again,
.11 iLI1,ti'l'U-1-/MAN
Outside SaIcs-NNV Plant Division
Ferguson AVatenrorks,a Uon)pamy
Cell:3(i0-661-3698
],UI1C_5111t%171'lll�r(i:1�*�tu�r�.<oin
tl'LSlC,{C1'l'l!mm.co l
From: Gary Harper [mailto:ga[yCo)garyharperconst.com]
Sent: Monday, December 23, 2013 9:08 AM
To: Stutzman, 3ulie [Ferguson] - 2449 Woodinville-Waterworks -Adm
Subject: Misty Cove RFI's
Julie here are the RFI's
Gary Harper
Gary Harper Construction Inc.
14831 223rd St SE
Snohomish, WA 98296
Phone: 360-863-1955
Cell: 425-985-8798
Fax: 360-863-1966
t
,*MW ME N"001
GARY HARPER CONSTRUCTION INC.
14831 223rd Street SE Snohomish, WA 98296-3989
(360) 863-1955 Fax (360) 863-1966
March 4,2014
City of Renton
Attn:John Hobson
1055 S Grady Way
Renton,WA 98057
Re: Misty Cove Lift Station Replacement, Project#WWP-27-3678
Change Order Proposal No.2 per RFI#6.A
Cost to provide additional finish hardware for door and install.
grooved couplings.
Labor
Millwright 5.00 hrs @ 62.43 312.15
Overhead &Profit 29% 90.52
Total Labor 402.67
Materials
Contract Hardware 205.00
Overhead&Profit 21% 43.05
Total Equipment& Materials 248.05
Total Change Order Proposal No.2 per RFI#6A $ 650.72
Contractor Intiated
Request for Information (RFI) - Number OO6.A
Y O Owner: City of Renton
U Project: Misty Cove Lift Station
+ ♦ Project No: REN 112.047.01.106
Engineer: RI-12 Engineering,Inc.
Contractor: Gary Harper Construction Inc.
Review Priority: x 1 (five working days) ❑ 2(ten working days) ❑ 3 (fifteen working days)
Date of Requested.Response(based on review priority): ASAP
Reference Drawing(s): Specification Section(s): RFI#6
Description of Request:
The door hardware group you sent in RFI#6 is not what the specifications tell me. We have a door, an
exit device,door seal, locks&keys and hinges. I cannot find anything else on Sheet S01 and in Div 8.
There should be an extra cost for any devices that are not in the Misty Cove Specifications.
Cost Impact: Yes Schedule Impact: No
Comments(If cost or schedule impact, provide reasoning):
Submitted By: _ Gary Harper Company: Gary Harper Construction, Inc. Date: 2125/14
Engineer's Response:
Include a door stop per specification 8.11.1 Part 2. Provide door closer,threshold,and door sweep
accessories equal to the door hardware group sent in RFI#6, it is acknowledged these three items will be
an extra cost.
Attachments:
Engineer's Understanding of: Cost Impact: Yes Schedule Impact: No
Engineer Name: David Baisclh
Engineer Signature: David Baisch Date: 02/27/14
How Returned to Contractor: ❑Fax ❑Mail ❑ UPS/FedEx ® Email ❑ Buzzsaw
Date returned to Contractor. 02/27/2014
i 12100 NE 195TH ST,SUITE 250
WA
BOTHELL,WASHINGTON TON 98011
TEL(206)29BA770 FAX(206)298-4777
REVISION FORM
DATE: March 3,2014
Gary Harper CONSTRUCTION G.C.REF# RFI 006.A
FAX: CHI REF#
ERP CO#
ATTN: GARY HARPER
PROJECT:MISTY COVE LIFT STATION
CHI JOB:
WE HAVE REVIEWED REVISIONS PER
AND DETERMINED THEY WOULD RESULT IN A NET ADD
OF$ $205.00 MATERIALS
TAX
$205.00 TOTAL
THIS PRICE REVISION IS FOR:
ADD CLOSER,THRSHOLD AND SWEEP
1 EA,1431 UO EN CLOSER
1 FA,171A GO"THRESHOLD
1 EA,315cn 60"SWEEP
HARDWARE $205.00
HM FRAMES
WOOD DOORS
DOOR SOURCE
FREIGHT
TAX
WE WILL NOT PROCEED WITHOUT A SIGNED COPY OF THIS PROPOSAL OR ARE IN RECEIPT
OF A WRITTEN CHANGE ORDER.
SINCERELY, ACCEPTANCE:
CONTRACT HARDWARE INC.
LYNNE HUFSTEDLEV,PROJECT MAt4AGER AUTHORIZED SIGNATURE
HARDWARE SALES
DATE
Features and Benefits `SARCENT
AA��++AA Ap '
1431 Series Powerglidell rtaSA ABLO i V
Qo The complies with ADA �1 O For reduce d open forcs ® C M
US
O RING SSAL
LISTED
a
HEAT TRURD
ALLOY STUL
SnNDLE BEARINGS HIGH IMPACTCbVER
e l�
� _ r
i m
O PING SUL ��j
SPRING POVIFA
ADJUSTMENT .C',`+..�
HIGH STAEN GIH, , .§�;'Ty:
WEAR RESISTAYE
ALUMINUMCASE \l
F1
PRECISION KEY /
01MARO VANES ../
Features Heavy Duty Construction Full Complement of Arm Types
i • Certified ANSIJBHMA A156.4 Grade 1 . Heat treated hill rack and pinion for high • Standard and parallel arms
e • Conforms to UL10C and U4C for positive strength&wear resistance • Push and pull track arms
pressure fire test • Heavy duty one piece high silicon content • Heavy duty forged steel arms are finely
• UL Listed and cUL Listed to Canadian Safety aluminum alloy body provides corrosion finished and interchangeable between
9 Standards listed for use on fire doors resistance,superior strength and wear SARGENT 281 and 1431,and 351 Series.
• 25 year limited warranty resistance The cold Formed arms(ROjRP9)are unique
• User friendly versatile mounting applications 112"arm engagement over a 7116 square to the 1431 series and not interchangeable
i permit standard,top jamb,parallel and track spindle ensures a wear-resistant tight joint with other SARGENT closers.
92 installations
�e Selfsticking templates supplied for most Fasteners Innovation
7 o applications • Machine Screws and self tapping screws SARGENT's revolutionary MicroShie(dy
• Adjustable spring power allows 1431 closers provided for closer and arm available.This antimicrobial silver-based
€ a size range of 1 through 6.They are adjusted • in addition,wood screws supplied when finish coating permanently suppresses the
to size 3 before leaving the factory installed on wood doors with through bolts growth of bacteria,algae,fungus,mold
one door closer body for all applications. and mildew.EPA and NSF approved and
All 1431 arenon-handed. Valves FDA listed.
j< Meets ADA requirements in all applications,
:;.I except Push Side Track application Separate brass low sensitivity control valves
a (except track) offer ability to separately regulate door
• High impact non-corrosive plastic covers with speed,latching,backcheck and optional
elayed action
'a two machine screws standard,metal covers 1
R and lead lined are optional All valves are captured to prevent accidental
• All weather fluid allows closer to operate removal,adjustable with an 116'Allen wrench ;
b s effectively in extreme temperatures without Adjustable backcheck protects the door j
o readjustment and hardware from damage during the
opening cycle I
a 1-1p,diameter piston forsuperiar door control Adjustable delayed action(optional)
• Standard pressure relief valves for both permits easy access for physically impaired I
opening and closing cycles protect the door individuals
&frame from damage caused by abuse i
M Retrofits existing SARGENT 123011231 Series
5 Closer installations
n
1-500-727-5477 • www.sargentlock.com ASSAABLOY,the global leader In door openingsolutions;
*#AW
Top Jamb Applications t
SARGENT
1431 Series Powerglide f•1%A ABLO i
a 1431-0 Top amb Mounting Position
� 1x
1
t
{ o ca \
Top Jamb applications-The 1431 closer is mounted on the frame face above
the door.The foot is mounted on the push side of door.This application is for
use on exterior doors opening out to protect the closer from the weather.
t-tie•
Frame
Top Jamb
Application i Minimum Frame Face Required Adjustable Closing Force
/ ^I 1-3J4'(44mm)for both single Interior doors to 5'0'wide
and double rabbeted frames Fxtedor doors to 4'0'wide
-- -- Minimum Door Top Rail Required to • %ippcd factory preset for 3'0'door
ADJUSTABLEARM Mount Closer Foot Factory pre-sized upon request
�D
Reveal Depth • 1-718'(48mm)minimum Z a
�F
Rail height required depends on type and
make of auxiliary holder if used v
1431-0 Typical Reveal Top Jamb
Applications E
s
for reveals up to 2"(51 mm)maximum �
o 9
bF
• O or RO Arms-Max,Door Opcning:1801 63
• H Arm-Hold Open Range:80°-180° S a
• F Arm-Fusible Link Hold Open Arm Top Jamb Application for Low Ceilings using 1431.6 Mountie Plate _ 4
Hold Open Range:80°-130°
-7=1x16"(37rnm)min,Ceiling(FramcPace
1431-OZ Deep Reveal Top Jamb - a x
Applications
1431.6
For reveals from 2-1/8*(54mm)to 5'(127mm) mounting plate
• OZArm-Max-Door Opening:140° �' F
• HZ Arm-Hold Open Range:80°-140° `b
Required for low ceiling conditinn and
• FZ Arm-Fusible Link Hold Open Arm narrow face frames .e
Hold Open Range:80°-130°
• Available w(powder coat or � r
1431-OZA Extra Deep Reveal Top plated finish to match cover
jamb Applications • Non-hancled `
For reveals from 5-1 8' 130mm to 8' 230mm • Plate mounting screws included
1 ( } ( ) �-1J8
• OZA Arm-Max,Door Opening:140° Order as 1431-p x finish 11 1 e n>
• HZA Arm-Hold Open Range:80°-130°
�1g3
• FZA Arm-Fusible Link Hold Open Arm Hold � J
Open Range:80°-130° m
M
ASSAABLOY,the global leader in door opening solutions 1-800-727-5477 wwwsargentlock.com
N
141111111111111
SARGENT
Regular Duty Parallel Arms '�
1431 Series Powerglideo A%A ABLOY
Hold Open Arms
PH4- Flush frame,Friction Hold
Open Arm PH9-Friction Hold Open Arm PF9-Fusible Link Hold Open Arm
• Forged Steel Arm t _ P-- Forged Steel Arm Forged Steel Arm 11-114'(286mm)long
11-114'(286mm) 11-114'(286mm) Fusl6lclinkmelts
long long and releases hold —
• Holds open from Holds open mechanism allowing
75°to 160° from 75°to 180°
r door to close -(
• Easily adjusted by
wrench • Easily adjusted by . 160°F fusible link e e r
wrench pp
• Non-handed Non-handed standard,125°F
link optional
• Use on frames where stop or soffit is for arm only.order as 25-PH9 x finish withadustablefrictionholder
too narrow to mount the standard Includes: 63-2229-Mainarmand6nkassembly Equipped 1
hold open foot bracket 61-2303-footaackety Holds door open from 75°to 180°
P 64 Oo39-Foot bracket(/25 Pr19)
For arm only,order as 25•PH4 x finish 64.2407&631391-Screw packs . Easily adjusted by wrench
Includes: 63.2229•Main arm and Iinkassembly
61-2303-Foot assembly Handed same as door
64.0050-Foot bracket for arm only,orderas 25-Pf9x hand x fusible link degree x finish
64.2407&63.2391 Screw packs Includes: 63-2229-Main arm and link assembly
63-2245-Left hand root assembly
63-2246,Right hand foot assembly
Offset Bracket Arms 64-2407&63-2391-Screw packs
P3-1"Offset Bracket for use with P3A - 1-314"Offset Bracket for use RP9 Regular Arm
Auxiliary Holder/Stop with Auxiliary Holder/Stop Cold Formed Steel Arm 11-1/4'
• Forged Steel Arm ( "?' Forged Steel Ann C -- (286mm)long p f r
11-114'(286mm)long 11-114'(286mm)long Arm is not handed
• For use with auxiliary, For use with auxiliary Permits 120°openingwith
surface overhead �( surface standard mounting
stops and (g° overhead sy "
1.1 Permits 180°
holders stops and t,-
holders and door coordinators opening with alternate mounting
• Foot bracket For arm only,order
is offset 1'more than P-9,allowing Foot bracket lowers door closer an Includes: 63.3396-Main arm and link assembly t
door closer to be lowered on door face additional 314'below P3 bracket 63.2271-Foot assembly
64.2407&63.2391 screw Packs g
• Non-handed Non-handed n ii
Forarm only,orderas 25-P3x finish For arm only,order as 25-P3Ax finish P9-Standard Parallel Arm '
Includes 63.2607-main arm and link assembly Includes: 63.2607-main arm and link assembly _ _ _
63-2270-Foot assembly 63-2274-footassembiy • Forged Steel Arm 3
64.2407&63-2391•5crew packs 64-2407&63.2391-Screw packs 11-1/4'(286mm) 8
long a tl
r �g
• Non-handed
NA-Flush Frame Arm for use with For arm ony,order as25-f9xfinish
P4-Parallel Flush frame Arm Auxiliary Holder/Stop nclyda'.632607-Malnarm and link assembly v
• Forged Steel Arm 63.3ao5•Foocassembly
(71:__'- - - • Forged Steel Arm tom--��"-"-- 64-2407&63-2391•Screwpacks
11-114'(286mm)long 11-114'(286mm)long Ea
• Footbracketis For use with auxiliary U /RUOPackages 8
attached to surface --
frame or overhead Universal arm 25
transom face package provides arms ;ate'
stops and and brackets to install
• For use where stop holders closer in standard <_"
or soffit is too narrow for the • Foot bracket is attached to frame top jamb or
standard P9 or transom face parallel application ' i' o
• Permits 120°opening with Foot bracket lowers door closer an Screw packs 64-2407&63-2391 125-P9
standard mounting additional 314'below P4 bracket UH Package s-
• Permits 180°opening with • Non-handed
altemate mounting niversal hold � A
g For arm only,order as 25-P4Ax finish open arm package
• Non-handed Includes 63.2607-Main arm and hrkassembly
63.2272-Foot assembly
€p a p,`te
provides brackets and '
For arm only,orderas 25-P4xfinish 64-2407&G3-2391-Screw packs arms to install closer
Includes: 63-2607-Main atm and fink assembly r
63.2295-Foot assembly In top jamb,
64-2407&63.2391-Screwpack Standard or parallel
applications 125-PH9
Screw packs 64-2407&63-2391
x
ASSAA9LOY,the global leader indooropeningsolutlons 1-800-727-5477 • www,sargentlock.com
,% le
CO
r
pvca.
Win= >
-r C; lu
d V
¢Y eo S
O ++C
V p 7 UI
C L m n
L N
V C
f0
Q�
C C O
p'-Y
O N
Y�W
E 3 o
a a
oo
c
o �H
L. m -
in =2
w w z °-°
z
w a
R d w x u
w w F-
M~- a a 0 U
,^^s
V/N
v/
N
O
Q
Lu J m v
O o m y v
5i ,Jw ® QEE E ¢
2 0 r' c
WLL x ¢ O N N L
W w W `V Lm
L I m
VAT Q F = =vY 9 10
V O Q ^ < O W �5 0 O U 2
UUI r{ ¢ 3x ¢ mmovz.
}/\ \
@ ®7 §
� § &
� /\ �
)
<$ _ g
� /}� \
2 Ef
k}\
0
c,
U. ca /\ k
w ui z &
w §a
■ ui e ■
§ a a k S
Ix
s.
■ � �
�
0
to x
k
®\— a �
7E
m \I \ )
To�7�]
W I )$ !]±
CL ce
$ 0 Ln
�
0 M $ k
III
GARY HARPER CONSTRUCTION INC
14831 223rd Street SE Snohomish, WA 98296-3989
(360) 863-1955 Fax (360) 863-1966
March 17, 2014
City of Renton
Attn:John Hobson
1055 S Grady Way
Renton,WA 98057
Re: Misty Cove Lift Station Replacement, Project#WWP-27-3678
Change Order Proposal No.4
Cost to repair mislocated 12" concrete Sewer Main that driller broke.
Labor to Install
Millwright(Lead)-Andrew 13.50 hrs @ 64.72 873.72
Millwright(Lead)OT-Andrew 4.50 hrs @ 97.08 436.86
Millwright -Justin 13.50 hrs @ 62.43 842.81
Pipelayer- Richard 8.00 hrs @ 52.67 421.36
Subtotal 2,574.75
Overhead & Profit 29% 746.68
Total Labor 3,321.42
Equipment,Materials&Services
1 Ton Work Truck 16.00 hrs @ 30.00 480.00
Cat 320 Excavator 10.00 hrs @ 65.00 650.00
Cat 305 Excavator 4.00 hrs @ 37.64 150.56
Case 580 Backhoe w/hoepack 3.00 hrs @ 37.64 112.92
DP Nicoli Trucking Lump Sum 300.00
Subtotal 1,693.48
Overhead & Profit 21% 355.63
Total Equipment, Materials&Services 2,049.11
Total Change Order Proposal No.4 $ 5,370.53
GARY HARPER CONSTRUCTION, INC.
14831 223rd St SE DAILY REPORT OF
Snohomish,WA 98296 FORCE ACCOUNT WORKED
Office: (360)863-1955 BY CONTRACTOR
Fax: (360)863-1966
Project Name: Misty Cove Lift Station
Date: February 26,2014
Contract Number:
Description of work/remarks: Broken sewer main
LABOR
HOURS
_ EMPLOYEE'S NAME _ TRADE STRAIGHT OVERTIME
Andrew Evans _ Superintendent 5.5 2.5 _
Justin Michaud Operator 5.5
T MATERIALS
DESCRIPTION INVOICE# QUANTITY U/M
EQUIPMENT-/MOBILIZATION
HOURS
DESCRIPTION WORKED
1-ton work truck 5.5
Contractor's Representative TOTAL:
1464¢llR
Owner's Representative
PAYMENT ENTERED:
On: By:
C:\Users\Kathy Salazar\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\RNKK82C8\Force account-Misty Cove
2-26-14 Page 1
GARY HARPER CONSTRUCTION, INC.
14831 223rd St SE DAILY REPORT OF
Snohomish,WA 98296 FORCE ACCOUNT WORKED
Office: (360)863-1955 BY CONTRACTOR
Fax: (360)863-1966
Project Name: Misty Cove Lift Station
Date: February 27,2014
Contract Number:
Description of work/remarks: Repair Broken Sewer Main
LABOR
HOURS
EMPLOYEE'S NAME TRADE STRAIGHT OVERTIME
Andrew Evans _ Superintendendet 8 2
Justin Michaud Operator 8
Richard McKenny Laborer 8
MATERIALS _
DESCRIPTION INVOICE# QUANTITY U/M
- --- -------- --^ EQUIPMENT/MOBILIZATION
HOURS
DESCRIPTION WORKED
--- ----------------- ---- --
320 Cat Excavator 10
305 Cat Excavator _ 4
1-ton work truck 10.5
580 Case Back Hoe 3
Contractor's Representative TOTAL:
,4646wo �flCiKd
Owner's Representative
PAYMENT ENTERED:
On: By:
C:\Users\Kathy SalazarMppData\LocanMicrosoR\Windows\Temporary Internet Files\Content.Outlook\RNKK82C8\Force account-Misty Cove
2-27-14 Page 1
DPAXiUc�)Ii INVOICE IR88999
DATE: 02//* 4 �
BILLING TYPE: Partial
19600 SW Cipole Rd Tualatin OR -97062 Page., 1
Phone: 503-692-6080 Fax: 503-692-1799
www,dpnicoli.com
Customer No 12045
BILL TO: SHIP TO:
Gary Harper Construction Inc Gary Harper Construction Inc
Kathy Salazar Kathy Salazar
14831 223rd St SE 5027 Ripley Lane N
Snohomish, WA 98296 Renton, WA 98056
CUST. JOB NO.: JOBSITE PHONE NO.: 425-877-5733
JOBSITE CONTACT: Andrew OFFICE PHONE NO.: 360-863-1955
OFFICE CONTACT: Andrew ORDER DATE: 02/18/14
PROJECT: DPN ORDER#: R027208
SALESPERSON: Stephanie Nanna TERMS: NET30
Items Sold
Qty Part Description W.O.# P.O.# Weight UOM Price Ext Price
1 Delivery Freight-CC-Truck Cancelatic., DT53902 Misty Cove Lift 30000 300.00
Each EACH
c � "/t" 4— hex-ec dG Subtotal: 300.00
'�'�`� Tax: 28.50
;� roe �,•-r�ee�d /z y �.7 ������
Total: 328.50
i�c,/ .�1 dr=/lam^cd
•r�l.w�l, �.��o a,o e. Gam:•-y �r.d f� Cetic,cE( '�l,+e/'u rte-y o:� s'�a•� '''�'
140 ��,� S�fP_ �iw<.tE 4�, /oac��c�. %tierces c�cr c3-^c9 c7c;' efic�q p.
Our records indicate there are still additional equipment/services that have been ordered but have not been delivered.
Please remit to�:�D.P. Nicoli, Inc. M/S 52 PO Box 4100 Portland, OR 97208
/1CO�`P: '7ti.a�-e Lcic..T rICi i`c:i+.,-. c., Jc�:1 Sr...fe tc> SfO/.e S-/.c�.? lrs�� S-�o• c ..
Gary Harper *moo, N"e
From: Stephanie Velie <svelie @dpnicoli.com>
Sent: Wednesday, February 26, 2014 2:03 PM
To: 'Gary Harper'
Cc: Kai Zimmerman; Bruce Ellis;'Andrew Evans';Travis Berg
Subject: RE: update
Gary,
Per our conversation today,there is a$300 cancelation fee for the trucks today. I will bill it out and invoice it so you can
pass it along to the city. The two trucks will 1 deliver Friday morning and we will have an installation advisor on site
Monday and Tuesday for the install. The material will go on rent Monday. Please let me know if you have any
questions.
Thanks,
Stephanie Nanna
DP Nicoli, Inc
Sales Manager
503-612-8210
503-209-1568 cell
svelie @dpnicoli.com
1%1100� "We
MW
GARY HARPER CONSTRUCTION INC.
14831 223rd Street SE Snohomish, WA 98296-3989
(360) 863-1955 Fax (360) 863-1966
Date of Request
1E , .,ee�Signature
This is a request to receive compensatory time in lieu of Overtime. Employee to receive payment
on the next paycheck when there is a week short of 40 hours. This pattern will continue until all
Comp time is used. All Comp time is calculated at 1.5 hours for each Overtime hour banked. The
Comp hours would then be paid at the Regular hourly rate.
y OT Banked
Justin Michaud ate Hours Hours
1.5 -
1.5
Balance 0.00
Pay OT Banked
Andrew Evans Date Hours Hours
237-108 03/06/14 6.50 1.5 9.75
Balance 9.75
Richard McKenney Pay OT Banked
Date Hours Hours
1.50 -
Balance 0.00
*kmve ME *4000,
GARY HARPER CONSTRUCTION INC
14831 223rd Street SE Snohomish, WA 98296-3989
(360) 863-1955 Fax (360) 863-1966
March 17,2014
City of Renton
Attn:John Hobson
1055 S Grady Way
Renton,WA 98057
Re: Misty Cove Lift Station Replacement, Project#WWP-27-3678
Change Order Proposal No.5
6"suction pipe was in the way in the existing put station. City agreed to pay for the extra labor and
materials to remove and replace that suction line to allow us to core drill.
Labor
Millwright(Lead)-Andrew 3.50 hrs @ 64.72 226.52
Millwright(Lead)OT-Andrew 2.00 hrs @ 97.08 194.16
Millwright -Justin 2.50 hrs @ 62.43 156.08
Milwright OT-Justin 2.00 hrs @ 93.65 187.30
Pipelayer-Richard 4.50 hrs @ 52.67 237.02
Subtotal 1,001.07
Overhead & Profit 29% 290.31
Total Labor 1,291.38
Equipment& Materials
1 Ton Work Truck 5.50 hrs @ 30.00 165.00
HD Fowler Co Inv#3579508 157.23
Tacoma Screw Inv#30497158 57.10
Subtotal 379.33
Overhead &Profit 21% 79.66
Total Equipment& Materials 458.99
Total Change Order Proposal No.5 $ 1,750.37
GARY HARPER CONSTRUCTION, INC.
14831 223rd St SE DAILY REPORT OF
Snohomish,WA 98296 FORCE ACCOUNT WORKED
Office: (360)863-1955 BY CONTRACTOR
Fax: (360)863-1966
Project Name: Misty Cove Lift Station
Date: March 13,2014
Contract Number:
Description of work/remarks: 6"suction line removal and replacment,so we can core dr
LABOR
_ _ HOURS
EMPLOYEE'S NAME _ TRADE STRAIG_HT OVERTIME
Andrew Evans [1 hour to pick up parts] Superintedent 3.5
Justin Michuad Operator 2.5
Richard Mckenny v Laborer 2.5
MATERIALS
DESCRIPTION INVOICE# QUANTITY U/M
pipe sleeve and accessories form HD Fowler 3579508 $157.23
Cutting blades and cup brush form Tacoma Screw 30497158 $57.10
-- - ---- -------- --
EQUIPMENT/MOBILIZATION
HOURS
DESCRIPTION WORKED
1-ton work truck 3.5
Contractor's Representative TOTAL:
0¢11 1if/ "
Owner's Representative
PAYMENT ENTERED:
On: By:
C:\Users\Gary\AppData\Loca1\Microsoft\Windows\Temporary InterFOffRel\Contenl.Outlook\SYOLWRV4\Force account-Misty Cove 3-13-14
fir+'
GARY HARPER CONSTRUCTION, INC.
14831 223rd St SE DAILY REPORT OF
Snohomish,WA 98296 FORCE ACCOUNT WORKED
Office: (360)863-1955 BY CONTRACTOR
Fax: (360)663-1966
Project Name:Usty Cove Lift Station
Date: March 14,2014
Contract Number:
Description of work/remarks: Replace 6"suction pipe in Lift station
LABOR
HOURS
EMPLOYEE'S NAME TRADE STRAIGHT OVERTIME
Andrew Evans Superintendent 2
Justin Michuad Operator 2
Richard McKenny Laborer 2
MATERIALS
DESCRIPTION INVOICE# QUANTITY U/M
EQUIPMENT J MOBILIZATION
HOURS
_ DESCRIPTION WORKED
1-ton work truck 2
Contractors Representative TOTAL:
Adwlw GivQ4td
Owner's Representative
PAYMENT ENTERED:
On: By:
C:\Users\Gary\AppData\Local\Microsoft\Windows\Temporary InterROffft$\Content.Outtook\SYOLWRV4\Force account-Misty Cove 3-14-14
13440 SE 30th St., Bellevue, WA 98005
p PO Box 160, F rue, WA 98009-0160
H.®. FO V`�► rE R Phone 425-740 00 - Fax 425-641-8885
COMPANY
PO Box 160, Bellevue, WA 98009-0160 Bremerton Branch
Invoice
4303 State Hwy 3 W
Number 1 3579508 BRWH Bremerton,WA 98312
#084310 (360)377-4507 Fax(360)377-4516
To: Ship to: HD Fowler Company-Bremerton 111
IIIII�illl III-11-1+1111
3 GARY HARPER CONSTRUCTION Bremerton WA 98312
14831 223rd St SE Order# Inv Date: Order Writer:
Snohomish WA 98296-3989
04453518 03/12/14 Bryce Howald
Terms: NET 10TH PROX Due: 04/10/14 POIJOB: MISTY COVE
FOB: H. D. FOWLER Ship Via: WILL CALL C L,.,
Qty Qty Part# Unit Extended T
Line Ship'd BO'd UoM Description Price Price X
1 1 0 EA 6"MJ SLEEVE LONG PATTERN DI,AWWA C153 62.130 62.13
LESS ACCESSORIES(39 LBS)
2 2 0 EA 6"WEDGE ACTION MJ KIT FOR DI PIPE W/BOLTS, 42.440 84.88
WEDGE ACTION GLAND&GASKET
3 2 0 EA 6" MJ X IPS TRANSITION GASKET 5.110 10.22
i
i
I
i
Sub total 157.23
Freight 0.00
Tax 0.00
Grand Total 157.23
ANDRE Serving the Pacific Northwest since 1911
www.hdfowler.com
Tacoma Screw Pry �icts, Inc. Invoice - �ICE n_ 3W497, 158
a I�rcommcrefarD!!>' !L�OCATION TAC W: CE`ITER STR
REMIT TO 200; CENTERSTRFF.T ;PAGE .�r• 1
AcCINIA'NF 394W 7Vtj' USA ---
e!»552 4Iaz
SILL TO SHIP TO _
230333 r GARY HARPER CONSTRUC7I-_)'N
GARY HARPER CONSTRUCTION ,NC ATTN RECEIVING
ATT% ACCOUNTS PAYABLE 14631 223RD ST SE
14:31 223RD ST SE SNOHCM,! SH . V,,A 96 295
SNC?HCtPJI'SH 1^/A 98296-3989
' ,r:FF N'.."JB=K ORDI-17 DATE OHIG,tJAI ilUOfE lUSTOMCR NO Nt✓tdBEft
T7" 851 �03/11,1_4 - -_ _1. MISTY COVE 1°c IUTH. ET 30 DAYS
j 4Ni"TFPJ I?'r--- SAiES RE"' CU ST RF1�tA`;c$ '..O[3 N:PIEfrF SH)P IA---..�.��T-------
G'LM H CUS?CI,4ER
Ql1AC113 Y C LIAf lT k
1#Y bUAiri T�'
R- OriPPTt:?kS(RlpTic>� PfllCk L,;A tfix r+tT�..SY'f�
QkEtd 1 �£Ir2hF I� (r
624.900 -v -- 10 ?0 0 3.2688 EA 3r.69
S.:'`2202 T27 CUT-OFF WHEEL
T•
I/,^' r.045 x 7/8"FO?PiiETAL
1 0 19.4532 EA :.A
AND=RSON 17600 2-314"
r,U°BRUSI KNOTTED M14X2.0
*n,,, yuu for your r.ler. {'iaeao,IUM that ztl,a'e are SuGlect u. Tn%tnta�r,ew Rrod�x.is,irr .5 arnS ,t SaIF and e tclUCm:u'9.a➢e. It It�.re shv dd
!u a.uy questiw s„.r I vrC.,,al,I�o' R rtior sr wca, p uas;Tali 344:1 ,r IWO)`.,U24319t. of.n`ess.
MERCHANDISE HANDLING MISC CHARGE T TAX FREIGHT DEPOSIT — DEPOSIT INVOICE TOTAL '
y- TilTAL„ —_ AMGU_NT T APPLIF_•C, _�
52.15 0.00' 0.00 4.951 0.00 0.00 — 0.00 : ;. :% 57.1is
PICK-UP SIGNATURE'
ANDREW