Loading...
HomeMy WebLinkAboutCO 1 1.1 I T Vr Kr-N 1 UN Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 13-178 Misty Cove Lift Station Replacement C.O.# 1 CONTRACTOR: Gary Harper Construction, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price 022. NEW ITEM: Additional time and materials to purchase and install additional LS 1 $667.95 $667.95 spools and couplings for the force main in the wetwell. 023. NEW ITEM: Additional time and materials to provide and install door hardware. LS 1 $650.72 $650.72 024. NEW ITEM: Additional labor and equipment costs to repair mis-marked existing LS 1 $5,370.53 $5,370.53 City of Renton 12"sanitary sewer main. 025. NEW ITEM: Additional labor, equipment,and material costs to remove and LS 1 $1,750.37 $1,750.37 replace existing Misty Cove L.S.suction line to allow installation of new gravity sewer between the new and existing lift stations. Sub Total $8,439.57 Sales Tax (9.5%) $801.76 Total $9,241.33 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $820,877.70 $820,877.70 $9,241.33 $830,119.03 SIGNATURES: Contractor: Date: Project Engineer: Date: Approved By: Date: lrliC Uti it tor) H:FileSys\W W P-W astewater\W W P-27-3627\CO-1 Misty Cove Lift Station RepUJDH NOM01 ME *At## GARY HARPER CONSTRUCTION INC. 14831 223rd Street SE Snohomish, WA 98296-3989 (360) 863-1955 Fax (360) 863-1966 January 27, 2013 City of Renton Attn:John Hobson 1055 S Grady Way Renton,WA 98057 Re: Misty Cove Lift Station Replacement, Project#WWP-27-3678 Change Order Proposal No. 1 for RFI#4 Cost to purchase and install 2 each 4"X 1'6"groove X groove prime coated spools and 2 each grooved couplings. Labor to Install Millwright (Lead) 2.00 hrs @ 64.72 129.44 Pipelayer 2.00 hrs @ 52.67 105.34 Subtotal 234.78 Overhead & Profit 29% 68.09 Total Labor 302.87 Materials 2 groove X groove spools 131.60 2 grooved couplings 170.12 Subtotal 301.72 Overhead &Profit 21% 63.36 Total Equipment&Materials 365.08 Total Change Order Proposal No.1 for RFI#4 $ 667.95 °w.r GARY HARPER CONSTRUCTION INC. 14831 223rd Street SE Snohomish, WA 98296-3989 (360) 863-1955 Fax (360) 863-1966 Labor Rates King Rates eff- 10/22/2013 Hourly Total Total OT Rates as listed on chart Rate Fica Emp Sec L&I Futa Cost per hr Cost per hr Andrew-Millwright(lead) 55.00 4.21 3.21 1.86 0.44 64.72 97.08 Justin-Millwright 53.00 4.05 3.10 1.86 0.42 62.43 93.65 Richard -Pipe Layer 44.46 3.40 2.60 1.86 0.36 52.67 79.01 Gary-Superintendent 70,00 5.36 0.56 75.92 113.87 Gary Harper From: Julie.Stutzman @Ferguson.com Sent: Monday, December 30, 2013 2:14 PM To: gary@garyharperconst.com Subject: FW: Misty Cove RFI's Attachments: Misty Cove RFI's.pdf Gary, RFI #004.0 The longest spool length is 19'6", so add the following: f- G �� 2 each 4"x1'6" groove x groove, prime coated $65.80 each 2 each 4"grooved couplings$85.06 each We should verify the overall lengths prior to order. Thanks Again, .11 iLI1,ti'l'U-1-/MAN Outside SaIcs-NNV Plant Division Ferguson AVatenrorks,a Uon)pamy Cell:3(i0-661-3698 ],UI1C_5111t%171'lll�r(i:1�*�tu�r�.<oin tl'LSlC,{C1'l'l!mm.co l From: Gary Harper [mailto:ga[yCo)garyharperconst.com] Sent: Monday, December 23, 2013 9:08 AM To: Stutzman, 3ulie [Ferguson] - 2449 Woodinville-Waterworks -Adm Subject: Misty Cove RFI's Julie here are the RFI's Gary Harper Gary Harper Construction Inc. 14831 223rd St SE Snohomish, WA 98296 Phone: 360-863-1955 Cell: 425-985-8798 Fax: 360-863-1966 t ,*MW ME N"001 GARY HARPER CONSTRUCTION INC. 14831 223rd Street SE Snohomish, WA 98296-3989 (360) 863-1955 Fax (360) 863-1966 March 4,2014 City of Renton Attn:John Hobson 1055 S Grady Way Renton,WA 98057 Re: Misty Cove Lift Station Replacement, Project#WWP-27-3678 Change Order Proposal No.2 per RFI#6.A Cost to provide additional finish hardware for door and install. grooved couplings. Labor Millwright 5.00 hrs @ 62.43 312.15 Overhead &Profit 29% 90.52 Total Labor 402.67 Materials Contract Hardware 205.00 Overhead&Profit 21% 43.05 Total Equipment& Materials 248.05 Total Change Order Proposal No.2 per RFI#6A $ 650.72 Contractor Intiated Request for Information (RFI) - Number OO6.A Y O Owner: City of Renton U Project: Misty Cove Lift Station + ♦ Project No: REN 112.047.01.106 Engineer: RI-12 Engineering,Inc. Contractor: Gary Harper Construction Inc. Review Priority: x 1 (five working days) ❑ 2(ten working days) ❑ 3 (fifteen working days) Date of Requested.Response(based on review priority): ASAP Reference Drawing(s): Specification Section(s): RFI#6 Description of Request: The door hardware group you sent in RFI#6 is not what the specifications tell me. We have a door, an exit device,door seal, locks&keys and hinges. I cannot find anything else on Sheet S01 and in Div 8. There should be an extra cost for any devices that are not in the Misty Cove Specifications. Cost Impact: Yes Schedule Impact: No Comments(If cost or schedule impact, provide reasoning): Submitted By: _ Gary Harper Company: Gary Harper Construction, Inc. Date: 2125/14 Engineer's Response: Include a door stop per specification 8.11.1 Part 2. Provide door closer,threshold,and door sweep accessories equal to the door hardware group sent in RFI#6, it is acknowledged these three items will be an extra cost. Attachments: Engineer's Understanding of: Cost Impact: Yes Schedule Impact: No Engineer Name: David Baisclh Engineer Signature: David Baisch Date: 02/27/14 How Returned to Contractor: ❑Fax ❑Mail ❑ UPS/FedEx ® Email ❑ Buzzsaw Date returned to Contractor. 02/27/2014 i 12100 NE 195TH ST,SUITE 250 WA BOTHELL,WASHINGTON TON 98011 TEL(206)29BA770 FAX(206)298-4777 REVISION FORM DATE: March 3,2014 Gary Harper CONSTRUCTION G.C.REF# RFI 006.A FAX: CHI REF# ERP CO# ATTN: GARY HARPER PROJECT:MISTY COVE LIFT STATION CHI JOB: WE HAVE REVIEWED REVISIONS PER AND DETERMINED THEY WOULD RESULT IN A NET ADD OF$ $205.00 MATERIALS TAX $205.00 TOTAL THIS PRICE REVISION IS FOR: ADD CLOSER,THRSHOLD AND SWEEP 1 EA,1431 UO EN CLOSER 1 FA,171A GO"THRESHOLD 1 EA,315cn 60"SWEEP HARDWARE $205.00 HM FRAMES WOOD DOORS DOOR SOURCE FREIGHT TAX WE WILL NOT PROCEED WITHOUT A SIGNED COPY OF THIS PROPOSAL OR ARE IN RECEIPT OF A WRITTEN CHANGE ORDER. SINCERELY, ACCEPTANCE: CONTRACT HARDWARE INC. LYNNE HUFSTEDLEV,PROJECT MAt4AGER AUTHORIZED SIGNATURE HARDWARE SALES DATE Features and Benefits `SARCENT AA��++AA Ap ' 1431 Series Powerglidell rtaSA ABLO i V Qo The complies with ADA �1 O For reduce d open forcs ® C M US O RING SSAL LISTED a HEAT TRURD ALLOY STUL SnNDLE BEARINGS HIGH IMPACTCbVER e l� � _ r i m O PING SUL ��j SPRING POVIFA ADJUSTMENT .C',`+..� HIGH STAEN GIH, , .§�;'Ty: WEAR RESISTAYE ALUMINUMCASE \l F1 PRECISION KEY / 01MARO VANES ../ Features Heavy Duty Construction Full Complement of Arm Types i • Certified ANSIJBHMA A156.4 Grade 1 . Heat treated hill rack and pinion for high • Standard and parallel arms e • Conforms to UL10C and U4C for positive strength&wear resistance • Push and pull track arms pressure fire test • Heavy duty one piece high silicon content • Heavy duty forged steel arms are finely • UL Listed and cUL Listed to Canadian Safety aluminum alloy body provides corrosion finished and interchangeable between 9 Standards listed for use on fire doors resistance,superior strength and wear SARGENT 281 and 1431,and 351 Series. • 25 year limited warranty resistance The cold Formed arms(ROjRP9)are unique • User friendly versatile mounting applications 112"arm engagement over a 7116 square to the 1431 series and not interchangeable i permit standard,top jamb,parallel and track spindle ensures a wear-resistant tight joint with other SARGENT closers. 92 installations �e Selfsticking templates supplied for most Fasteners Innovation 7 o applications • Machine Screws and self tapping screws SARGENT's revolutionary MicroShie(dy • Adjustable spring power allows 1431 closers provided for closer and arm available.This antimicrobial silver-based € a size range of 1 through 6.They are adjusted • in addition,wood screws supplied when finish coating permanently suppresses the to size 3 before leaving the factory installed on wood doors with through bolts growth of bacteria,algae,fungus,mold one door closer body for all applications. and mildew.EPA and NSF approved and All 1431 arenon-handed. Valves FDA listed. j< Meets ADA requirements in all applications, :;.I except Push Side Track application Separate brass low sensitivity control valves a (except track) offer ability to separately regulate door • High impact non-corrosive plastic covers with speed,latching,backcheck and optional elayed action 'a two machine screws standard,metal covers 1 R and lead lined are optional All valves are captured to prevent accidental • All weather fluid allows closer to operate removal,adjustable with an 116'Allen wrench ; b s effectively in extreme temperatures without Adjustable backcheck protects the door j o readjustment and hardware from damage during the opening cycle I a 1-1p,diameter piston forsuperiar door control Adjustable delayed action(optional) • Standard pressure relief valves for both permits easy access for physically impaired I opening and closing cycles protect the door individuals &frame from damage caused by abuse i M Retrofits existing SARGENT 123011231 Series 5 Closer installations n 1-500-727-5477 • www.sargentlock.com ASSAABLOY,the global leader In door openingsolutions; *#AW Top Jamb Applications t SARGENT 1431 Series Powerglide f•1%A ABLO i a 1431-0 Top amb Mounting Position � 1x 1 t { o ca \ Top Jamb applications-The 1431 closer is mounted on the frame face above the door.The foot is mounted on the push side of door.This application is for use on exterior doors opening out to protect the closer from the weather. t-tie• Frame Top Jamb Application i Minimum Frame Face Required Adjustable Closing Force / ^I 1-3J4'(44mm)for both single Interior doors to 5'0'wide and double rabbeted frames Fxtedor doors to 4'0'wide -- -- Minimum Door Top Rail Required to • %ippcd factory preset for 3'0'door ADJUSTABLEARM Mount Closer Foot Factory pre-sized upon request �D Reveal Depth • 1-718'(48mm)minimum Z a �F Rail height required depends on type and make of auxiliary holder if used v 1431-0 Typical Reveal Top Jamb Applications E s for reveals up to 2"(51 mm)maximum � o 9 bF • O or RO Arms-Max,Door Opcning:1801 63 • H Arm-Hold Open Range:80°-180° S a • F Arm-Fusible Link Hold Open Arm Top Jamb Application for Low Ceilings using 1431.6 Mountie Plate _ 4 Hold Open Range:80°-130° -7=1x16"(37rnm)min,Ceiling(FramcPace 1431-OZ Deep Reveal Top Jamb - a x Applications 1431.6 For reveals from 2-1/8*(54mm)to 5'(127mm) mounting plate • OZArm-Max-Door Opening:140° �' F • HZ Arm-Hold Open Range:80°-140° `b Required for low ceiling conditinn and • FZ Arm-Fusible Link Hold Open Arm narrow face frames .e Hold Open Range:80°-130° • Available w(powder coat or � r 1431-OZA Extra Deep Reveal Top plated finish to match cover jamb Applications • Non-hancled ` For reveals from 5-1 8' 130mm to 8' 230mm • Plate mounting screws included 1 ( } ( ) �-1J8 • OZA Arm-Max,Door Opening:140° Order as 1431-p x finish 11 1 e n> • HZA Arm-Hold Open Range:80°-130° �1g3 • FZA Arm-Fusible Link Hold Open Arm Hold � J Open Range:80°-130° m M ASSAABLOY,the global leader in door opening solutions 1-800-727-5477 wwwsargentlock.com N 141111111111111 SARGENT Regular Duty Parallel Arms '� 1431 Series Powerglideo A%A ABLOY Hold Open Arms PH4- Flush frame,Friction Hold Open Arm PH9-Friction Hold Open Arm PF9-Fusible Link Hold Open Arm • Forged Steel Arm t _ P-- Forged Steel Arm Forged Steel Arm 11-114'(286mm)long 11-114'(286mm) 11-114'(286mm) Fusl6lclinkmelts long long and releases hold — • Holds open from Holds open mechanism allowing 75°to 160° from 75°to 180° r door to close -( • Easily adjusted by wrench • Easily adjusted by . 160°F fusible link e e r wrench pp • Non-handed Non-handed standard,125°F link optional • Use on frames where stop or soffit is for arm only.order as 25-PH9 x finish withadustablefrictionholder too narrow to mount the standard Includes: 63-2229-Mainarmand6nkassembly Equipped 1 hold open foot bracket 61-2303-footaackety Holds door open from 75°to 180° P 64 Oo39-Foot bracket(/25 Pr19) For arm only,order as 25•PH4 x finish 64.2407&631391-Screw packs . Easily adjusted by wrench Includes: 63.2229•Main arm and Iinkassembly 61-2303-Foot assembly Handed same as door 64.0050-Foot bracket for arm only,orderas 25-Pf9x hand x fusible link degree x finish 64.2407&63.2391 Screw packs Includes: 63-2229-Main arm and link assembly 63-2245-Left hand root assembly 63-2246,Right hand foot assembly Offset Bracket Arms 64-2407&63-2391-Screw packs P3-1"Offset Bracket for use with P3A - 1-314"Offset Bracket for use RP9 Regular Arm Auxiliary Holder/Stop with Auxiliary Holder/Stop Cold Formed Steel Arm 11-1/4' • Forged Steel Arm ( "?' Forged Steel Ann C -- (286mm)long p f r 11-114'(286mm)long 11-114'(286mm)long Arm is not handed • For use with auxiliary, For use with auxiliary Permits 120°openingwith surface overhead �( surface standard mounting stops and (g° overhead sy " 1.1 Permits 180° holders stops and t,- holders and door coordinators opening with alternate mounting • Foot bracket For arm only,order is offset 1'more than P-9,allowing Foot bracket lowers door closer an Includes: 63.3396-Main arm and link assembly t door closer to be lowered on door face additional 314'below P3 bracket 63.2271-Foot assembly 64.2407&63.2391 screw Packs g • Non-handed Non-handed n ii Forarm only,orderas 25-P3x finish For arm only,order as 25-P3Ax finish P9-Standard Parallel Arm ' Includes 63.2607-main arm and link assembly Includes: 63.2607-main arm and link assembly _ _ _ 63-2270-Foot assembly 63-2274-footassembiy • Forged Steel Arm 3 64.2407&63-2391•5crew packs 64-2407&63.2391-Screw packs 11-1/4'(286mm) 8 long a tl r �g • Non-handed NA-Flush Frame Arm for use with For arm ony,order as25-f9xfinish P4-Parallel Flush frame Arm Auxiliary Holder/Stop nclyda'.632607-Malnarm and link assembly v • Forged Steel Arm 63.3ao5•Foocassembly (71:__'- - - • Forged Steel Arm tom--��"-"-- 64-2407&63-2391•Screwpacks 11-114'(286mm)long 11-114'(286mm)long Ea • Footbracketis For use with auxiliary U /RUOPackages 8 attached to surface -- frame or overhead Universal arm 25 transom face package provides arms ;ate' stops and and brackets to install • For use where stop holders closer in standard <_" or soffit is too narrow for the • Foot bracket is attached to frame top jamb or standard P9 or transom face parallel application ' i' o • Permits 120°opening with Foot bracket lowers door closer an Screw packs 64-2407&63-2391 125-P9 standard mounting additional 314'below P4 bracket UH Package s- • Permits 180°opening with • Non-handed altemate mounting niversal hold � A g For arm only,order as 25-P4Ax finish open arm package • Non-handed Includes 63.2607-Main arm and hrkassembly 63.2272-Foot assembly €p a p,`te provides brackets and ' For arm only,orderas 25-P4xfinish 64-2407&G3-2391-Screw packs arms to install closer Includes: 63-2607-Main atm and fink assembly r 63.2295-Foot assembly In top jamb, 64-2407&63.2391-Screwpack Standard or parallel applications 125-PH9 Screw packs 64-2407&63-2391 x ASSAA9LOY,the global leader indooropeningsolutlons 1-800-727-5477 • www,sargentlock.com ,% le CO r pvca. Win= > -r C; lu d V ¢Y eo S O ++C V p 7 UI C L m n L N V C f0 Q� C C O p'-Y O N Y�W E 3 o a a oo c o �H L. m - in =2 w w z °-° z w a R d w x u w w F- M~- a a 0 U ,^^s V/N v/ N O Q Lu J m v O o m y v 5i ,Jw ® QEE E ¢ 2 0 r' c WLL x ¢ O N N L W w W `V Lm L I m VAT Q F = =vY 9 10 V O Q ^ < O W �5 0 O U 2 UUI r{ ¢ 3x ¢ mmovz. }/\ \ @ ®7 § � § & � /\ � ) <$ _ g � /}� \ 2 Ef k}\ 0 c, U. ca /\ k w ui z & w §a ■ ui e ■ § a a k S Ix s. ■ � � � 0 to x k ®\— a � 7E m \I \ ) To�7�] W I )$ !]± CL ce $ 0 Ln � 0 M $ k III GARY HARPER CONSTRUCTION INC 14831 223rd Street SE Snohomish, WA 98296-3989 (360) 863-1955 Fax (360) 863-1966 March 17, 2014 City of Renton Attn:John Hobson 1055 S Grady Way Renton,WA 98057 Re: Misty Cove Lift Station Replacement, Project#WWP-27-3678 Change Order Proposal No.4 Cost to repair mislocated 12" concrete Sewer Main that driller broke. Labor to Install Millwright(Lead)-Andrew 13.50 hrs @ 64.72 873.72 Millwright(Lead)OT-Andrew 4.50 hrs @ 97.08 436.86 Millwright -Justin 13.50 hrs @ 62.43 842.81 Pipelayer- Richard 8.00 hrs @ 52.67 421.36 Subtotal 2,574.75 Overhead & Profit 29% 746.68 Total Labor 3,321.42 Equipment,Materials&Services 1 Ton Work Truck 16.00 hrs @ 30.00 480.00 Cat 320 Excavator 10.00 hrs @ 65.00 650.00 Cat 305 Excavator 4.00 hrs @ 37.64 150.56 Case 580 Backhoe w/hoepack 3.00 hrs @ 37.64 112.92 DP Nicoli Trucking Lump Sum 300.00 Subtotal 1,693.48 Overhead & Profit 21% 355.63 Total Equipment, Materials&Services 2,049.11 Total Change Order Proposal No.4 $ 5,370.53 GARY HARPER CONSTRUCTION, INC. 14831 223rd St SE DAILY REPORT OF Snohomish,WA 98296 FORCE ACCOUNT WORKED Office: (360)863-1955 BY CONTRACTOR Fax: (360)863-1966 Project Name: Misty Cove Lift Station Date: February 26,2014 Contract Number: Description of work/remarks: Broken sewer main LABOR HOURS _ EMPLOYEE'S NAME _ TRADE STRAIGHT OVERTIME Andrew Evans _ Superintendent 5.5 2.5 _ Justin Michaud Operator 5.5 T MATERIALS DESCRIPTION INVOICE# QUANTITY U/M EQUIPMENT-/MOBILIZATION HOURS DESCRIPTION WORKED 1-ton work truck 5.5 Contractor's Representative TOTAL: 1464¢llR Owner's Representative PAYMENT ENTERED: On: By: C:\Users\Kathy Salazar\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\RNKK82C8\Force account-Misty Cove 2-26-14 Page 1 GARY HARPER CONSTRUCTION, INC. 14831 223rd St SE DAILY REPORT OF Snohomish,WA 98296 FORCE ACCOUNT WORKED Office: (360)863-1955 BY CONTRACTOR Fax: (360)863-1966 Project Name: Misty Cove Lift Station Date: February 27,2014 Contract Number: Description of work/remarks: Repair Broken Sewer Main LABOR HOURS EMPLOYEE'S NAME TRADE STRAIGHT OVERTIME Andrew Evans _ Superintendendet 8 2 Justin Michaud Operator 8 Richard McKenny Laborer 8 MATERIALS _ DESCRIPTION INVOICE# QUANTITY U/M - --- -------- --^ EQUIPMENT/MOBILIZATION HOURS DESCRIPTION WORKED --- ----------------- ---- -- 320 Cat Excavator 10 305 Cat Excavator _ 4 1-ton work truck 10.5 580 Case Back Hoe 3 Contractor's Representative TOTAL: ,4646wo �flCiKd Owner's Representative PAYMENT ENTERED: On: By: C:\Users\Kathy SalazarMppData\LocanMicrosoR\Windows\Temporary Internet Files\Content.Outlook\RNKK82C8\Force account-Misty Cove 2-27-14 Page 1 DPAXiUc�)Ii INVOICE IR88999 DATE: 02//* 4 � BILLING TYPE: Partial 19600 SW Cipole Rd Tualatin OR -97062 Page., 1 Phone: 503-692-6080 Fax: 503-692-1799 www,dpnicoli.com Customer No 12045 BILL TO: SHIP TO: Gary Harper Construction Inc Gary Harper Construction Inc Kathy Salazar Kathy Salazar 14831 223rd St SE 5027 Ripley Lane N Snohomish, WA 98296 Renton, WA 98056 CUST. JOB NO.: JOBSITE PHONE NO.: 425-877-5733 JOBSITE CONTACT: Andrew OFFICE PHONE NO.: 360-863-1955 OFFICE CONTACT: Andrew ORDER DATE: 02/18/14 PROJECT: DPN ORDER#: R027208 SALESPERSON: Stephanie Nanna TERMS: NET30 Items Sold Qty Part Description W.O.# P.O.# Weight UOM Price Ext Price 1 Delivery Freight-CC-Truck Cancelatic., DT53902 Misty Cove Lift 30000 300.00 Each EACH c � "/t" 4— hex-ec dG Subtotal: 300.00 '�'�`� Tax: 28.50 ;� roe �,•-r�ee�d /z y �.7 ������ Total: 328.50 i�c,/ .�1 dr=/lam^cd •r�l.w�l, �.��o a,o e. Gam:•-y �r.d f� Cetic,cE( '�l,+e/'u rte-y o:� s'�a•� '''�' 140 ��,� S�fP_ �iw<.tE 4�, /oac��c�. %tierces c�cr c3-^c9 c7c;' efic�q p. Our records indicate there are still additional equipment/services that have been ordered but have not been delivered. Please remit to�:�D.P. Nicoli, Inc. M/S 52 PO Box 4100 Portland, OR 97208 /1CO�`P: '7ti.a�-e Lcic..T rICi i`c:i+.,-. c., Jc�:1 Sr...fe tc> SfO/.e S-/.c�.? lrs�� S-�o• c .. Gary Harper *moo, N"e From: Stephanie Velie <svelie @dpnicoli.com> Sent: Wednesday, February 26, 2014 2:03 PM To: 'Gary Harper' Cc: Kai Zimmerman; Bruce Ellis;'Andrew Evans';Travis Berg Subject: RE: update Gary, Per our conversation today,there is a$300 cancelation fee for the trucks today. I will bill it out and invoice it so you can pass it along to the city. The two trucks will 1 deliver Friday morning and we will have an installation advisor on site Monday and Tuesday for the install. The material will go on rent Monday. Please let me know if you have any questions. Thanks, Stephanie Nanna DP Nicoli, Inc Sales Manager 503-612-8210 503-209-1568 cell svelie @dpnicoli.com 1%1100� "We MW GARY HARPER CONSTRUCTION INC. 14831 223rd Street SE Snohomish, WA 98296-3989 (360) 863-1955 Fax (360) 863-1966 Date of Request 1E , .,ee�Signature This is a request to receive compensatory time in lieu of Overtime. Employee to receive payment on the next paycheck when there is a week short of 40 hours. This pattern will continue until all Comp time is used. All Comp time is calculated at 1.5 hours for each Overtime hour banked. The Comp hours would then be paid at the Regular hourly rate. y OT Banked Justin Michaud ate Hours Hours 1.5 - 1.5 Balance 0.00 Pay OT Banked Andrew Evans Date Hours Hours 237-108 03/06/14 6.50 1.5 9.75 Balance 9.75 Richard McKenney Pay OT Banked Date Hours Hours 1.50 - Balance 0.00 *kmve ME *4000, GARY HARPER CONSTRUCTION INC 14831 223rd Street SE Snohomish, WA 98296-3989 (360) 863-1955 Fax (360) 863-1966 March 17,2014 City of Renton Attn:John Hobson 1055 S Grady Way Renton,WA 98057 Re: Misty Cove Lift Station Replacement, Project#WWP-27-3678 Change Order Proposal No.5 6"suction pipe was in the way in the existing put station. City agreed to pay for the extra labor and materials to remove and replace that suction line to allow us to core drill. Labor Millwright(Lead)-Andrew 3.50 hrs @ 64.72 226.52 Millwright(Lead)OT-Andrew 2.00 hrs @ 97.08 194.16 Millwright -Justin 2.50 hrs @ 62.43 156.08 Milwright OT-Justin 2.00 hrs @ 93.65 187.30 Pipelayer-Richard 4.50 hrs @ 52.67 237.02 Subtotal 1,001.07 Overhead & Profit 29% 290.31 Total Labor 1,291.38 Equipment& Materials 1 Ton Work Truck 5.50 hrs @ 30.00 165.00 HD Fowler Co Inv#3579508 157.23 Tacoma Screw Inv#30497158 57.10 Subtotal 379.33 Overhead &Profit 21% 79.66 Total Equipment& Materials 458.99 Total Change Order Proposal No.5 $ 1,750.37 GARY HARPER CONSTRUCTION, INC. 14831 223rd St SE DAILY REPORT OF Snohomish,WA 98296 FORCE ACCOUNT WORKED Office: (360)863-1955 BY CONTRACTOR Fax: (360)863-1966 Project Name: Misty Cove Lift Station Date: March 13,2014 Contract Number: Description of work/remarks: 6"suction line removal and replacment,so we can core dr LABOR _ _ HOURS EMPLOYEE'S NAME _ TRADE STRAIG_HT OVERTIME Andrew Evans [1 hour to pick up parts] Superintedent 3.5 Justin Michuad Operator 2.5 Richard Mckenny v Laborer 2.5 MATERIALS DESCRIPTION INVOICE# QUANTITY U/M pipe sleeve and accessories form HD Fowler 3579508 $157.23 Cutting blades and cup brush form Tacoma Screw 30497158 $57.10 -- - ---- -------- -- EQUIPMENT/MOBILIZATION HOURS DESCRIPTION WORKED 1-ton work truck 3.5 Contractor's Representative TOTAL: 0¢11 1if/ " Owner's Representative PAYMENT ENTERED: On: By: C:\Users\Gary\AppData\Loca1\Microsoft\Windows\Temporary InterFOffRel\Contenl.Outlook\SYOLWRV4\Force account-Misty Cove 3-13-14 fir+' GARY HARPER CONSTRUCTION, INC. 14831 223rd St SE DAILY REPORT OF Snohomish,WA 98296 FORCE ACCOUNT WORKED Office: (360)863-1955 BY CONTRACTOR Fax: (360)663-1966 Project Name:Usty Cove Lift Station Date: March 14,2014 Contract Number: Description of work/remarks: Replace 6"suction pipe in Lift station LABOR HOURS EMPLOYEE'S NAME TRADE STRAIGHT OVERTIME Andrew Evans Superintendent 2 Justin Michuad Operator 2 Richard McKenny Laborer 2 MATERIALS DESCRIPTION INVOICE# QUANTITY U/M EQUIPMENT J MOBILIZATION HOURS _ DESCRIPTION WORKED 1-ton work truck 2 Contractors Representative TOTAL: Adwlw GivQ4td Owner's Representative PAYMENT ENTERED: On: By: C:\Users\Gary\AppData\Local\Microsoft\Windows\Temporary InterROffft$\Content.Outtook\SYOLWRV4\Force account-Misty Cove 3-14-14 13440 SE 30th St., Bellevue, WA 98005 p PO Box 160, F rue, WA 98009-0160 H.®. FO V`�► rE R Phone 425-740 00 - Fax 425-641-8885 COMPANY PO Box 160, Bellevue, WA 98009-0160 Bremerton Branch Invoice 4303 State Hwy 3 W Number 1 3579508 BRWH Bremerton,WA 98312 #084310 (360)377-4507 Fax(360)377-4516 To: Ship to: HD Fowler Company-Bremerton 111 IIIII�illl III-11-1+1111 3 GARY HARPER CONSTRUCTION Bremerton WA 98312 14831 223rd St SE Order# Inv Date: Order Writer: Snohomish WA 98296-3989 04453518 03/12/14 Bryce Howald Terms: NET 10TH PROX Due: 04/10/14 POIJOB: MISTY COVE FOB: H. D. FOWLER Ship Via: WILL CALL C L,., Qty Qty Part# Unit Extended T Line Ship'd BO'd UoM Description Price Price X 1 1 0 EA 6"MJ SLEEVE LONG PATTERN DI,AWWA C153 62.130 62.13 LESS ACCESSORIES(39 LBS) 2 2 0 EA 6"WEDGE ACTION MJ KIT FOR DI PIPE W/BOLTS, 42.440 84.88 WEDGE ACTION GLAND&GASKET 3 2 0 EA 6" MJ X IPS TRANSITION GASKET 5.110 10.22 i i I i Sub total 157.23 Freight 0.00 Tax 0.00 Grand Total 157.23 ANDRE Serving the Pacific Northwest since 1911 www.hdfowler.com Tacoma Screw Pry �icts, Inc. Invoice - �ICE n_ 3W497, 158 a I�rcommcrefarD!!>' !L�OCATION TAC W: CE`ITER STR REMIT TO 200; CENTERSTRFF.T ;PAGE .�r• 1 AcCINIA'NF 394W 7Vtj' USA --- e!»552 4Iaz SILL TO SHIP TO _ 230333 r GARY HARPER CONSTRUC7I-_)'N GARY HARPER CONSTRUCTION ,NC ATTN RECEIVING ATT% ACCOUNTS PAYABLE 14631 223RD ST SE 14:31 223RD ST SE SNOHCM,! SH . V,,A 96 295 SNC?HCtPJI'SH 1^/A 98296-3989 ' ,r:FF N'.."JB=K ORDI-17 DATE OHIG,tJAI ilUOfE lUSTOMCR NO Nt✓tdBEft T7" 851 �03/11,1_4 - -_ _1. MISTY COVE 1°c IUTH. ET 30 DAYS j 4Ni"TFPJ I?'r--- SAiES RE"' CU ST RF1�tA`;c$ '..O[3 N:PIEfrF SH)P IA---..�.��T------- G'LM H CUS?CI,4ER Ql1AC113 Y C LIAf lT k 1#Y bUAiri T�' R- OriPPTt:?kS(RlpTic>� PfllCk L,;A tfix r+tT�..SY'f� QkEtd 1 �£Ir2hF I� (r 624.900 -v -- 10 ?0 0 3.2688 EA 3r.69 S.:'`2202 T27 CUT-OFF WHEEL T• I/,^' r.045 x 7/8"FO?PiiETAL 1 0 19.4532 EA :.A AND=RSON 17600 2-314" r,U°BRUSI KNOTTED M14X2.0 *n,,, yuu for your r.ler. {'iaeao,IUM that ztl,a'e are SuGlect u. Tn%tnta�r,ew Rrod�x.is,irr .5 arnS ,t SaIF and e tclUCm:u'9.a➢e. It It�.re shv dd !u a.uy questiw s„.r I vrC.,,al,I�o' R rtior sr wca, p uas;Tali 344:1 ,r IWO)`.,U24319t. of.n`ess. MERCHANDISE HANDLING MISC CHARGE T TAX FREIGHT DEPOSIT — DEPOSIT INVOICE TOTAL ' y- TilTAL„ —_ AMGU_NT T APPLIF_•C, _� 52.15 0.00' 0.00 4.951 0.00 0.00 — 0.00 : ;. :% 57.1is PICK-UP SIGNATURE' ANDREW