Loading...
HomeMy WebLinkAboutAdden 1 *'r"' *MOO, CAG-13-187 , Adden #1-14 ity of OGiti l/Y` a ) ADDENDUM NO. 1-11 TRESTLE & STEEL BRIDGE OVER THE CEDAR RIVER STRUCTURAL ASSESSMENT CAG-13-187 ADDENDUM TO THE DESIGN CONSULTANT AGREEMENT BETWEEN BERGERABAM ENGINEERS, INC. AND THE CITY OF RENTON, WASHINGTON This addendum is entered into between the City of Renton and BergerABAM Engineers, Inc. amends and attaches to and is part of the existing agreement entered into previously between the parties on October 24, 2013. The parties agree to the following amendments: Item 6.Time of Performance: Extends the time of completion from 90 calendar days to 158 calendar days (January 23, 2014 to April 1, 2014). In all other respects,the Scope of Work/Basic Services; City Responsibilities; Added Services; Reimbursable Expenses; Insurance Requirements; Termination of Agreement; Successors and Assigns; Non-Discrimination and Compliance with Federal, State and Local Laws; Arbitration; and Hold Harmless; and exhibits to the agreement shall remain the same as agreed to in the original agreement. vilow *MW This agreement is entered into as of the day and year written below. CONSULTANT CITY OF RENTON / t Signa ,(. Signature Elr>hev 02-011r) vice P✓eSi*K,IT_erryHigashiyama,Community5ervicesAdministrator Printed Name and Title Printed Name and Title 16 ) e10,,v-" 2.o)44 'Z' I 1gl 1 -I Date 9 Date BergerABAM Engineers, Inc. Business Name 1301 Fifth Avenue,Suite 1200 Mailing Address Seattle WA 98101 City State Zip 206-357-5619 Telephone