Loading...
HomeMy WebLinkAboutCO 2 4%,Wl rr► CAG-13-212 , CO #.2-15 CHANGE ORDER NO. 2 Page 1 of 2 AIRPORT: Renton Municipal Airport(RNT) DATE: September 18, 2014 LOCATION: Renton,WA CITY PROJECT NO.: CAG 13-212 CONTRACTOR:3 Kings Environmental, Inc. You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Owner: ITEM SPEC UNIT NO. NO. DESCRIPTION UNIT PRICE OTY. AMOUNT COP#3 - Additional Perimeter Fencing LS $2,078.60 1 $2,078.60 Subtotal $2,078.60 Sales Tax (9.5%) $ 197.47 Original Contract Amount(with 9.5%Sales Tax) $277,490.90 Total This Change Order(with 9.5% Sales Tax) $2,276.07 Total Previous Change Orders $ 11,932.76 REVISED CONTRACT TOTAL $291,699.73 No additional working days will be allowed fo pletion of work associated with this change order. An approved copy of this document will serve as th a to proceed.This document shall become an amendment to the contract and all provisions of the ont t i apply. Recommended By: gh Y Engineer–WHPacific, Inc. Date Approved By: t--� 4 Owner Cit of Renton D td e � — Accepted By: C n ra or–3 Kings Environmental ate CMsers WHolden.WHPACIFIC'Oesklop`Renlon 8201Change Order No 24hange Order No 2 docs **.►" Page 2 of 2 CITY PROJECT NO.: CAG 13-212 CHANGE ORDER NO. 2 AIRPORT: Renton Municipal Airport (RNT) LOCATION: Renton, WA JUSTIFICATION FOR CHANGE 1. Brief description of proposed contract changes and locations. COP#3: Additional Perimeter Fencing This change will modify the overall layout of the final airport perimeter fence around the removed 820 Building site. 2. Reason for the changes. The revised layout of the perimeter fence will provide access to the existing 800 Building PSE gas meter and pedestrian door, and better suit the needs of the airport. 3. Justification for unit prices or total cost. The Contractor submitted a change order proposal with a lump sum price to complete the work. This cost was reviewed by the project team and found to be acceptable for the work required. The quantity of additional perimeter fence beyond plan quantity was measured in the field and verified. The proposed price was compared with at least two contractors, and is in line with market value for the type of fence and quantity installed. C:\Users\WHolden.WHPACIFIC\Oesklop\Renton MChange Order No.2\Change Order No.2.docx N%W�. � KINGS 11 THIS IS A CHANGE ORDER PROPOSAL (COP) COP#: 3 Proj ect: Renton Contractor: 3 Kings Environmental Inc. Date Submitted: # 9/10/2014 Contract#: Reply By: Job#: 214037 Description: Addl Fencing DESCRIPTION: Additional Fencing from what was shown on the plans See Attached Pricing From C and P fence REASON FOR MODIFICATION: Work laid out by engineer in the field was more than shown on the plan Attach completed Cost Summary to this document. Net Amount of This Proposed Change: (Add) r 52,078.60 (Deduct) (No Change) Net Change in Working Days Due to this Pro osed Change: (Add) (Deduct) n (No Change) Working Days 0 QSubmitted By: Date: l 0-Sep-14 3 Kings Environm nt 1 c. Contractor Acknowledgement of Receipt Date: By: Title: 111111111100 C & P Fencing 1516 Chinook Ave Enumclaw, Wa. 98022 Ph 360 802-1059, Fax 360 450-5464 License#CPFENPF882ME Date: 8/25/2014 COR cp001 3 Kings Environmental Project: Renton Municipal Airport 820 Bldg. Demolition Renton, WA Attention: Allen We hereby propose to fumish the materials and perform the labor necessary for the completion of this project: The total cost of this Estimate is: $ - Scope of work to be completed BID# DESCRIPTION QTY UNIT PRICE EXTENSION Additional Footage of Permanent AOA Fence over the footage as shown on plan sheet C4(347 If) COR 7 FT+3 Black Coated Chain Link Fence 73 $ 24.76 $ 1,807.48 2/�1 y.Go Exclusions:Insurance premiums for Waiver of Subrogation or primary wording,cleating and grading,concrete saw cutting and core drilling,bonding, surveys,signs,electrical grounding of fences,traffic control,painting/staining,permits,surveying,labor agreements,staking the fence line,hazardous waste training or removal,temporary fence,concrete mowing strips,post sleeves/setting of post sleeves,damage to irrigation lines,padlocks,knox box, fence removal,use tax/sales tax. SUBMITTALS MUST BE APPROVED AND RETURNED PRIOR TO ORDERING MATERIAL THIS ESTIMATE IS TO BE INCLUDED AS AN EXHIBIT IN THE CONTRACT All material costs over 52.500.00 will be subject to a Joint check agreement provided by our supplier C 8 P Fencing requests that retainage be paid 30 days after their work has been completed,provided that all paperwork,warranties,payroll reports, releases,etc.have been satisfied. 'Quote good for 25 days.Materials must be ordered and shipped immediately in order to guarantee price.Material orders not received immediately are subject to any price increase initiated by our suppliers. IN WITNESS OF WHEREOF,the parties have hereunto caused this Agreement to be executed. Respectfully Submitted: �— �� Date: 8/25/2014 By:Paul Pohlman, Cell No.253 740-5841,ppohiman@comcast.net Note: This proposal may be withdrawn by us if not accepted within 25 Days. Accepted Date: Title: