HomeMy WebLinkAboutAdden 8 CAG-13-220,Adden#8-16 D c��ry of �, �G��O� •R�� ADDENDUM NO. 8 RIVERVIEW PARK— BRIDGE REPLACEMENT CAG-13-220 ADDENDUM TO THE DESIGN CONSULTANT AGREEMENT BETWEEN PND ENGINEERS, INC. AND THE CITY OF RENTON, WASHINGTON This addendum is entered into between the City of Renton and PND Engineers, Inc. amends and attaches to and is part of the existing agreement entered into previously between the parties on December 27, 2013. Amendment 2: Article 4. Comqensation: Pursuant to section 4.4 of this Agreement, entitled Change Order, is amended as fol lows: The total payment for Addendum No. 9 shall be on a Time and Materials basis, with a not to exceed limit of Four Thousand Nine Hundred Seventy-Seven Dollars and Fifty Cents ($4,977.50). The total amended contract amount shall not exceed Three Hundred Fifty-One Thousand Six Hundred Eighty-Eight Dollars and Seventy-three Cents ($351,688.73), including WSST. The total reflects the following additional work: • Completion of As-Builts (original budget was consumed by submittal review) • Review of utility designs and submittals provided by the contractor • Final expenses to close out the project Amendment 3.Time of Performance: Extends the time of completion from March 15, 2016 to October 1, 2016. In all other respects,the Scope of Work/Basic Services; City Responsibilities; Added Services; Reimbursable Expenses; Insurance Requirements;Termination of Agreement; Successors and Assigns; Non-Discrimination and Compliance with Federal, State and Local Laws; Arbitration; and Hold Harmless; and exhibits to the agreement shall remain the same as agreed to in the original agreement. This agreement is entered into as of the day and year written below. CON ULTANT CITY OF RENTON � � Signature Signatur �V�^ �a� �"l ��YS ���,., l Kellv Bevmer,Administrator Pri ed Name an Title Printed Name and Title � 23 , 2d 1 � ���f/6 Date Date PND En�ineers, Inc. Business Name 1736 Fourth Ave.S,Suite A Mailing Address Seattle, WA 98104 City State Zip 206-624-1387 Telephone EXHIBIT A-SCOPE OF WORK Riverview Bridge Replacement Engineering Services Amendment No. 8 Utilities Review and Closeout August 23,2016 (A) SCOPE OF SERVICES: I INTRODUCTION This work order is issued pursuant to the Standard Agreement for Professional Services dated December 27, 2014 between the City of Renton and PND Engineers,Inc. Unless otherwise specified below,the performance of services hereunder and the payment therefore shall be subject to the terms and conditions of said Agreement. The fees shown are estimates and actual fees and expenses including mark-up will be submitted monthly for invoicing. SCOPE OF WORK � In Amendment #7, PND's budget was revised to a not-to-exceed amount of$346,71123. PND exceeded it's previously agreed upon budget prior to beginning the As-Built drawings for the bridge.The bulk of this added cost stemmed from review of utility submittals provided by Rodarte Construcrion. These submittals were intended to repair leaks in irrigation and potable waterlines. PND has previously informed the City of Renton that these overages were occurring.Below is a brief summary of these cost: 1. Completion of As-Builts (original budget was consumed by submittal review). 2. Review of utility designs and submittals provided by the contractor. ' 3. Final expenses to close out the project. PND estimates appro�cimately 3.0 hour of coordinarion Attached to this amendment is a summary of PND current charges.This charges do not reflect some remaining charges that result from closing out the project. As stated above,these remaining closeout cost will be less than 3 hours of an Engineer's time. DELIVERABLES • All required tasks have been completed. FEES PND proposes that the City of Renton reunburse PND for the services rendered on the basis of the project billing rates.These fees are sutninarized on the attached cost proposal.This amendment requests a sutn,not to exceed,$4977.50. Attachments: Cost Proposal 1 August 23,2016 � � � � � ' ENGINEERS,INC_ PROJECT TITLE:RIVERVIEW PARK BRIDCE REPI.ACEMENT Revised 08/23/16 CL[ENT:CITY OF RENTON PARKS DEPARTMENT JOB NUMBER 134057 LABOR: Seoia Senior Sedor Smiot SWar Smior SmffFss SnHEeg Sr.Smir GD Task Item EegVtl EoQV! EoQIV EoeIII Euell 8oQ1 UI tI Seknt$t Ded¢oerV T«hIV Tahll 7'otal L.abor No Task(Scope of Serv�ces) 180 00 165 00 140 00 130 00 120 00 110 00 95 00 90 00 105 00 95 00 90 00 70 00 Ho�rs Cost 1 Current BudgM Overage a Rev�ew of UGLt�es and Pro�ect Closeout Costs as of 8/I S/2016 4,587 50 Subtotal 4,587.50 2 Pro�ect Closeout Costs a Final Coordmation of Closure 3 3 390 00 Subtotal 390.00 Iabor Subtoisl 0 0 0 3 0 0 0 0 0 0 0 0 3 4,977.50 EXPENSES: Cost Expenses Item Quannty Umt per Unrt Markup Cost Addmonal Mdeage 0 Mde 0 555 1 1 0 00 TOTAL EXPENSES s _ Total-Labor 4,977 50 Total-Expenses 0 00 Total-Subconsultants 0 00 f O"L�l,- S a.977.cU -� ,. , Snapshot Dollars Snapshot Hours �Contract Billed �""�'°'�� Billed 350,,843. 5�_ IP 4 5$ ,50=. �5 �W�P 8illed 2 015,00 t WIP 86.76=2,051.75 ir1 Spent • .:. - - 134057 Riverview Park BNdge 351,731 350,844 4,58$ 360,022 0 2,015 37 2,091 LH FINAL}1 En ineerin Support Q�j� 5,020 3,173 0 7,046 0 27 0 60 P� a�� . ,�t ��,ka.�;� L i�p�{ �7` .. , ss�.. .a . .. _ . ,;ibah:k��w.�} �J-u �+d..t.:$i�F+ F���{•+ - i�:.^�23�m.�.....i�.�lia99a,'�;, . . ...1 .c 2A Preliminary�Engineering � il f 32,766 � 32,766 0 �R 32,766 { 0 v 96 0 Y 96 , 28 Permitting Detail 34,850 34,850 0 34,850 0 132 0 132 ' 2C Final Design Detail 107,685 107,685 0 108,402 0 687 0 694 2D ConstructionAdministration Detail 168,078 168,076 4,588 172,663 0 �,058 37 1,095 2E Expenses Detail 1,780 2,743 0 2,7a3 0 0 0 0 3 Tree-Related WorkTR,4CKiNG Detail 1,553 1,553 0 1,553 0 16 0 16 i ,�/GL�j� ��Q`�n ol� �EViUu� ���CX7rJ' 'l34057 . Riverviavv Park Brldpe ;; �?��,�-, T; ��' PreliminaryEngineerin9�.�!+PDp� :��= ���' �- '>.. �'�- `'�_. �`�g.i;��',���Y .`�"���.��: . .��r;...,,�,§�,,, >,�{ a� �*`�~z'`i� ;`'�`�';. . �,s�,,x'"' e`�:_ 2D ConstiuCtionAdrtifnistrs�tiGlF. ;.� �,� .� - z;;�.. ':��a`= ,x ..�}�':, '�r" ,�+-��s' . .> �.>2:'=;' „r..,.r , ..�`:�'��;,. taboCGroup:�tt�PloqaeTypelEmp!ayeg/Actfvtty:::�F?'.''. ,, ,�_, _'; , .x:`'�Cc�s4. �.;3.. �#�=s�ued`�5;":.;;:�,::;_::;.; emed wia 'Ezpense&ConsultantGroup:TypelYendoriActtvity '.k�rSftiMs ` Amountfi" csNnfs` �'Amourrt Amount l.abor � 1,094.75 136,772.50 �,058.00 132,185.00 4,587.50 CAD Designer V T.50 712.50 2.00 190.00 522.50 Senior Engineer I 5.00 550.00 2.00 2zo.00 330.00 Senior Engineer III 578.50 75,205.00 552.25 71,792.50 3,412.50 Senior Engineer VI 21.50 3,547.50 27.50 3,547.50 0.00 Senior Engineer VII 106.25 19,485.00 108.75 19,215.00 270.00 Senior Environmental Scientist Z.00 210.00 2.00 210.00 0.00 , Staff Enginaer Iil 24.50 2,327.50 24.50 2,327.50 0.00 Staff Engineer IV 328.50 32,850.00 326.50 32,850.00 0.00 Technician 111 2.00 160.00 2.00 160.00 0.00 TechnicianlV 4.00 360.00 4.00 360.00 0.00 Technician V 13.00 1,365.00 12.50 '1,312.50 52.50 Expense 1,699.94 1,699.94 0.00 MISTRAS Group Inc 969.10 969.10 0.00 Petty Cash-Seattle 19.01 79.01 0.00 United Reprographics,LLC 717.83 711.83 0.00 ConsulWnt 34,190.58 34,190.58 0.00 APS Survey 8.Mapping,Inc. 1,636.07 1,636.07 0.00 Harbor Power Engineers,Inc. 5,973.00 5,973.00 0.00 Hart Crowser,loc. 0.00 0.00 0.00 � MacLeod Reckord,PLLC 2,079.83 2,W9.83 O.OU Otto Rosenau 8 Associates,Inc. 24,501.88 24,501.68 0.00 1,094.75 172,663.02 1,058.00 168,075.52 4,587.50