HomeMy WebLinkAboutAdden 3 CAG-13-220, Adden #3-14
Cityoff
et OBJ
ADDENDUM NO. 3
RIVERVIEW PARK— BRIDGE REPLACEMENT
CAG-13-220
ADDENDUM TO THE DESIGN CONSULTANT AGREEMENT
BETWEEN PND ENGINEERS, INC.
AND THE CITY OF RENTON, WASHINGTON
This addendum is entered into between the City of Renton and PND Engineers, Inc.
amends and attaches to and is part of the existing agreement entered into previously
between the parties on December 27, 2013.
Amendment 2: Article 4,Compensation:
Pursuant to section 4.4 of this Agreement, entitled Change Order, is amended as
follows:
The total payment for Addendum No. 3 shall be on a Time and Materials fee basis,with
a not to exceed limit of Five Thousand Six Hundred and Forty Dollars and No Cents
($5,640.00).The total amended contract amount shall not exceed Two Hundred
Thirteen Thousand One Hundred Thirteen Dollars and Twenty Cents($213,113.20),
including sales tax.The total reflects the following additional work:
• Prepare drawings and specifications for the electrical reconnection to the Puget
Sound Energy power pole along Maple Valley Highway,for the purpose of
providing power across the new bridge to Riverview Park.
In all other respects,the Scope of Work/Basic Services; City Responsibilities;Added
Services; Reimbursable Expenses; Insurance Requirements;Termination of Agreement;
Successors and Assigns; Non-Discrimination and Compliance with Federal, State and
Local Laws;Arbitration; and Hold Harmless; and exhibits to the agreement shall remain
the same as agreed to in the original agreement.
This agreement is entered into as of the day and year written below.
CON RACTOR CITY OF RENTON
//
///ted./.� �r -
.
/AA-
Si::uy4.omSignature
// n ! Terry Higashiyama,Community Services Administrator
Printed Name and Ti e Printed Name and Title
øv '
t v / 3 i
Date Date
PND Engineers, Inc.
Businggss Name
I -34 Too rih1tut.So �jv� toA•
-a9l first Avenue f. it 570_
Mailing Address
Seattle, WA -98104 q$1 3 Li
City State Zip
206-624-1387
Telephone