Loading...
HomeMy WebLinkAboutAdden 2In 3-13-220, Adden #2-14 ADDENDUM NO. 2 RIVERVIEW PARK — BRIDGE REPLACEMENT CAG -13-220 ADDENDUM TO THE DESIGN CONSULTANT AGREEMENT BETWEEN PND ENGINEERS, INC. AND THE CITY OF RENTON, WASHINGTON This addendum is entered into between the City of Renton and PND Engineers, Inc. amends and attaches to and is part of the existing agreement entered into previously between the parties on December 27, 2013. Amendment 2: Article 4, Compensation: Pursuant to section 4.4 of this Agreement, entitled Change Order, is amended as follows: The total payment for Addendum No. 2 shall be on a Time and Materials fee basis, with a not to exceed limit of Three Thousand Five Hundred Dollars and No Cents ($3,500.00). The total amended contract amount shall not exceed Two Hundred Seven Thousand Four Hundred Seventy -Three Dollars and Twenty Cents ($207,473.20), including sales tax. The total reflects the following additional work: • Research permitting and anchoring for large woody debris placement in the Cedar River • Survey work to determine conflicts with unexpected concrete slabs below grade found during bridge demolition and location of future bridge piles In all other respects, the Scope of Work/Basic Services; City Responsibilities; Added Services; Reimbursable Expenses; Insurance Requirements; Termination of Agreement; Successors and Assigns; Non -Discrimination and Compliance with Federal, State and Local Laws; Arbitration; and Hold Harmless; and exhibits to the agreement shall remain the same as agreed to in the original agreement. cm This agreement is entered into as of the day and year written below. CONTRACTOR PND Engineers, Inc. Business Name 811 First Avenue, Suite 570 Mailing Address Seattle, WA 9810, City State Zip 206-624-1387 Telephone CITY OF RENTON .,\ C.-,. t ---- Signature Terry Higashiyama, Community Services Administrator Printed Name and Title /0/Z Date