CITY OF RENTON COMMUNITY SERVICES DEPARTMENT
ADDENDUM TO CAG-13-220, RIVERVIEW PARK BRIDGE REPLACEMENT
AGREEMENT
Between
CITY OF RENTON AND PND ENGINEERS, INC.
ADDENDUM#01-14
This amendment entered into between the City of Renton and PND Engineers, Inc. ("the
Parties"), this � day of June, 2014 ("Effective Date"). By this written amendment, the
Parties mutually agree to amend the original and existing Consultant Agreement ("Agreement")
entered into by the Parties on December 27, 2013.
Amendment 1: Article 2 Services:
Pursuant to section 4.4 of this Agreement, entitled Change Orders, section 4.4 shall be deleted
in its entirety and replaced with the following language:
Renton, without invalidating the Agreement, may order changes in services
consisting of additions, deletions or modifications, adjustment of the Contract
Sum, and adjustment of the Contract time. The Consultant shall provide
additional services relating to project permitting and leasing, more specifically
described in Exhibit "A" to the this Addendum which is attached and fully
incorporated into the Addendum by reference.
Amendment 2: Article 4, Compensation:
Pursuant to section 4.4 of this Agreement, entitled Change Orders, the Contract Sum of One
Hundred Ninety Six Thousand Nine Hundred Twenty Three dollars and Twenty cents
($196,923.20) including sales tax, is amended as follows:
The Contract Sum of One Hundred Ninety-Six Thousand Nine Hundred Twenty-
Three dollars and Twenty cents ($196,923.20) including sales tax, shall increase
by Seven Thousand Fifty dollars and no cents ($7,050.00),to Two Hundred Three
Thousand Nine Hundred Seventy-Three dollars and Twenty cents ($203,973.20)
including sales tax.
ADDENDUM#1-6-14 TO THE CITY OF RENTON AND PND 1
ENGINEERS,INC.RIVERVIEW BRIDGE REPLACEMENT AGREEMENT
*41W 11 r
All other provisions of the December 27, 2013, Agreement shall remain the same and in full
force and effect.
The Parties voluntarily agree to this Addendum to Agreement CAG 13-220 as of the Effective
Date.
CONSU ANT CITY OF RENTON
Ignature Signature
Date Date
/ v
Terry Higashiyama,Administrator
Printed Name and Title Printed Name and Title
PND Engineers, Inc.
Business Name
17364 1h Avenue S.,Suite A
Mailing Address
Seattle WA 98134
City State Zip
ADDENDUM#1-6-14 TO THE CITY OF RENTON AND PND 2
ENGINEERS,INC.RIVERVIEW BRIDGE REPLACEMENT AGREEMENT
'err✓ ,,rr
EXHIBIT A-SCOPE OF WORK
Riverview Bridge Replacement
Engineering and Permitting Services
Amendment No.1
DNR Authorization Assistance
June 4,2014
(A) SCOPE OF SERVICES:
INTRODUCTION
This work order is issued pursuant to the Standard Agreement for Professional Services dated December 27,
2014 between the Cite of Renton and PND Engineers,Inc.. Unless otherwise specified below,the performance
of services hereunder and the payment therefore shall be subject to the terms and conditions of said Agreement.
The fees shown are estimates and actual fees and expenses including mark-up will be submitted monthly for
invoicing.
SCOPE OF WORK
Task 1 DNR Right of Entry Permit. Subconsultant,APS Survey&Mapping,will prepare an exhibit showing
the bridge and waterway along with latitude,longitude,WSPC X&Y,and elevation for the four corners of the
existing bridge as requested by DNR. PND will provide coordination with DNR as needed and directed by the
City.
Task 2 DNR Aquatic Lease Record of Survcy. Subconsultant, APS Survey& Mapping, will prepare the
record of survey for the aquatic lease authorization per DNR requirements. PND will assist the City with DNR
coordination and guidance on the lease application process.
CLIENT-PROVIDED INFORMATION
The Client shall provide to PND the following items:
1. All necessary property title information as needed.
2. Access will be provided to the property as necessary.
DELIVERABLES
Description Deliverable
Right of Entry Permit Exhibit 1 8.5x11 PDF Copy and original
DNR Aquatic Lease Survey 1 8.5x11 PDF Copy
SCHEDULE
Following Notice to Proceed by the Client,PND agrees to perform the above-described services and to diligently
pursue the project and make every reasonable effort to finish all items in a titnely manner.
FEES
PND will provide these services on a time and materials basis for a maximum budget of$7,050 as detailed in the
cost proposal. Work will be performed according to the attached rate schedule.
Q I ® I 0 1 June 4,2014
G\GINLLRS,INN
X
_
» ; 66 \
) d k\ \ j
3 ^
� ) )
\ { e
�
@ = ® c \ \ / § %
q/> &
%
uv 'n & j \ f
% $ } r m
q! �
» % °
2= 9
!
) a
f ._ \
/ -
\
;& \
\ It \gw # _
k §p \
/ _ ® ()
/ ,
\ %m \ / % » A
» k » / J (
a2
§ �
( } ® }
k � C2
> §
■ / G /\ \
o
o j / ) ) ( / \ ƒ } / / ( { /
( z \ A; / / \ \ \
z o
/ / 2 f
2
"rlr✓
VC1SB
SURVEY & MAPPING cYe
Bringing the world to your desk -- -----
June 3,2014
Laura Gurley I Environmental Scientist
PINID Engineers, Inc.
1736 Fourth Avenue S, Suite A, Seattle, WA 98134
Phone 206.624.1387
Fax 206.624.1388
LGurley@pndengineers.com
Re: Addition Surveying and Mapping on Cedar River in Renton
For DNR Aquatic Lease Record of Survey
SE I/4 of the SW 1/4 of Section 16,T23N,R05E.,WM.,Washington
Laura:
In response to your request for additional survey &mapping for a new crossing and an Aquatic Lease
Record of Survey,we submit the following:
Scope-of-Work
We have completed scores of these ROS and had them approved by DNR. Typically,the application
for the lease is prepared by our client and we furnish the Record of Survey and the technical
information.
A. Because this survey crosses a commercial waterway,we will confirm with DNR the their
specific definitions of Ordinary High Water Mark(remember Lake Washington is subject to
raising and lowering by the US Army Corps of Engineers,which causes changes in the water
level upstream in the Cedar River). The same applies to the Ordinary Low Water Line and
potentially the Line of Navigability.
B. We will tie the survey to two sectional corners and establish the abutting property lines. I
believe we will need some title information beyond normal on-line research. So we are
assuming the title information will be acquired by your client. We will need this to describe
the uplands and to make sure we know were potential easement on or across the property lie.
C. We will set 4 rebar/cap monuments in or close to the site establishing the lease boundaries.
D. We will prepare a vicinity map according to the DNR specifications.
E. We will prepare the Record of Survey and submit it with our computations for DNR approval.
F. For your Right of Entry Permit to demolish the existing,we will prepare an 8.5x11 inch exhibit,
showing the bridge and the waterway along with Latitude,Longitude,WSPC X& Y,and
elevation.On the top of the page,we will set the title information,referencing the permit number
23-091608 and Signed Survey Stamp.
G. We will record the Record of Survey in King County under your client's name.
13221 SE 26h Street,Suite A•Bellevue,WA 98005•Tel:(425)746-3200•Fax: (425)746-3342•www.apssm.com
voss
APS Survey&Mapping
June 3,2014
Page 2
APS Survey&Mapping will prepare the Record of Survey
Prepare the Demolition Permit Exhibit No.23-091608=$500
Boat with Ross Fathometer=$350
Control 4 hours x 2 person crew=$608
Bathymetric=4 hrs x 3 person crew=$812
Uplands Topography =4 hrs x 2 people crew=$608
Set 4 monuments for limits of the lease.2 hours x 2 person crew=$304
_Note reduction and AutoDESK Mapping = 16 hours PLS=$1,600
Recording Fee at King County is$138 +$5 for second sheet=$143
Total Lump Sum Cost$4,925
Assumptions
1. We will receive Notice-to-Proceed to conduct the field survey within the next two months.
2. We will conform with the DNR horizontal and vertical datum.
3. You will give us the centerline of the lease location before we begin the survey.
4. We will show abutting property&easements using the title information provided by you or
your client; but will not be setting corners.
5. APS Survey& Mapping will have unrestricted access to the site.
6. Our survey crews will not be conducting a utility survey. Although, if visible utilities are
encountered we will as-built thetn to the extent we can from the surface.
Schedule
APS will mobilize within 5 working days of Notice-to-Proceed and complete the mapping within 12
workings.
If you have questions or concerns please call me at 425 746 3200.
Sincerely,
APS Survey and Mapping
Tyler J. Sweet,PLS
President
13221 SE 26"'Street,Suite A•Bellevue,WA 98005•Tel:(425)746-3200•Fax: (425)746-3342•www.apssm.com