HomeMy WebLinkAboutCO 2 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 12-056—SE 5th Street AC Water Main Replacement Project C.O.#2 CONTRACTOR: B&B Utilities and Excavating, LLC SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment,subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Total Price CO2 Force Account work additional pavement patching and LS 1 $4,923.09 $4,923.09 sawcutting around exiting utility covers on SE 5th Street and additional equipment rental. Subtotal $4,923.09 9.5%Sales Tax $467.69 Total $5,390.78 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET ESTIMATED CONTRACT AMOUNT AMOUNT CHANGE THIS ORDER TOTAL AFTER CHANGE $296,821.65 $279,321.01 $5,390.78 $284,711.79 Cost Allocation Water Utility 425.455596.018.595.34.63.000 1 $5,390.78 SIGNATURES: Contractor: Date: 10 '1 Project Engineer: Date: /'009// 2 Approved By: Date: d z-ql;e'01 j (Water tility S pervisor) ` I I i i 1 C:\tJsers\Maulitta\AppData\local\Microsoft\Windows\Temporary Intemet Files\Content.IE5\IN09I2BZI\ChangeOrder2_10-19-12.doc/AWah